836029runRoa.pdf

PDF 2 MB Posted

Attached to
Rehabilitate Runway 6-24
Solicitation number
26-013
Issued by
Portsmouth City, Roanoke City, Virginia

About this file

This Invitation for Bid (IFB) is issued by the Roanoke Regional Airport Commission for Project Bid No. 26-013 to rehabilitate Runway 6-24 at Roanoke Blacksburg Regional Airport in Virginia. The work involves mill and overlay of the runway pavement, thickening structurally deficient sections, and installation of a new runway centerline lighting system. Sealed bids are due by 1:00 PM local time on Tuesday, August 18, 2026, at the Roanoke Regional Airport Commission offices located at 5202 Aviation Drive, Roanoke, Virginia 24012, or via email at Procurement@flyroa.com. A pre-bid meeting and site review will be conducted on Tuesday, July 28, 2026, at 1:00 PM in the Airport Terminal Building, Conference Room A, with attendance strongly encouraged as certain work areas are located in non-public, secure locations. All clarification inquiries must be submitted in writing to Troy Philpott, Procurement and Contracts Manager, by 5:00 PM on Tuesday, August 11, 2026. The Commission will publicly open and read bids aloud on the bid due date. Contract documents are available on eVA (Virginia Department of General Services' electronic procurement website) and the Roanoke Blacksburg Regional Airport website.

The successful bidder must hold a Class "A" Virginia Contractor's License and maintain minimum insurance coverage of $10,000,000 in general liability, $1,000,000 in motor vehicle insurance, and $5,000,000 in umbrella insurance. Each bid must include a bid bond or certified check in an amount equal to at least 5 percent of the total bid amount, payable to the Roanoke Regional Airport Commission. The winning contractor will be required to execute Performance and Labor and Material Payment Bonds in amounts equal to 100 percent of the contract price within 15 calendar days of receiving the Notice of Award. The Commission reserves the right to waive informalities, reject any or all bids, negotiate with the apparent low bidder if the bid exceeds allocated funds, and award the contract to the lowest responsive and responsible bidder. The project is federally funded through the FAA, and all contractors and employees must submit to federal security threat assessments and fingerprint-based criminal records checks for airport secure area access. The Commission has established an aspirational goal of 8.9 percent Disadvantaged Business Enterprise (DBE) participation, though the published goal is 0.0 percent. Work is organized into two phases: Phase 1 (Administrative Services) must be completed within 240 calendar days of the first Notice to Proceed, and Phase 2 (Performance of Work) must achieve Substantial Completion within 150 calendar days and Final Acceptance within 180 calendar days of the second Notice to Proceed. Liquidated damages apply for failure to meet phase completion deadlines.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roanoke Regional Airport Commission

5202 AVIATION DRIVE, N.W.

ROANOKE, VA 24012

PHONE: (540) 362-1999

ISSUE DATE: JULY 20, 2026

INVITATION FOR BID # 26-013

FOR

REHABILITATE RUNWAY 6-24

SEALED BIDS DUE:

TUESDAY, AUGUST 18, 2026

ON OR BEFORE

1:00 PM (LOCAL TIME)

ALL INFORMATION AND CLARIFICATION INQUIRIES MUST BE SUBMITTED IN WRITING TO:

TROY PHILPOTT, PROCUREMENT AND CONTRACTS MANAGER

AT PROCUREMENT@FLYROA.COM

BY 5:00 PM ON TUESDAY, AUGUST 11, 2026

AS-BID PROJECT MANUAL

VOLUME 1 OF 2

Page Intentionally Blank

Legal Approval 021012

REHABILITATE RUNWAY 6-24 PROJECT

BID NO: 26-013

PROJECT MANUAL

TABLE OF CONTENTS

VOLUME 1

SECTION TITLE PAGE NUMBER

A. Bid Information

Invitation for Bids Instructions to Bidders

B. General Conditions, Including Special Conditions

C. Bid Forms

Bid Form Bid Schedule Bid Certifications Bid Bond

D. Contract Forms

Contract Contractor’s Performance Bond Contractor’s Labor and Material Payment Bond

VOLUME 2

E. Contract Conditions for Federally Funded Projects

Part 1 - General Contract Provisions (FAA AC 150/5370-10H) Federal Contract Provisions for FAA Funded Projects Davis-Bacon Wage Rates

F. Other Contract Forms

G. Technical Specifications

H. Appendices

SECTION A

BID INFORMATION

INVITATION FOR BIDS

Bid No. 26-013

The Roanoke Regional Airport Commission will accept sealed bids for furnishing all labor, materials, and equipment and performing all work for:

REHABILITATE RUNWAY 6-24

AT

ROANOKE BLACKSBURG REGIONAL AIRPORT

The work involves rehabilitating the pavement of Runway 6-24, including a mill and overlay, thickening structurally deficient sections of the runway, and installation of a new runway centerline lighting system. Bids shall be received until 1:00 PM local time on Tuesday, August 18, 2026, in the Office of Roanoke Regional Airport Commission, 5202 Aviation Drive, Roanoke, Virginia 24012, or via email at Procurement@flyroa.com. Bids will be publicly opened and read aloud at that time in Conference Room A on the Second Floor of the Airport Terminal Building.

Contract Documents will be posted on eVA, Virginia Department of General Services’ central electronic procurement website, at https://eva.virgina.gov, and on the Roanoke Blacksburg Regional Airport Current Bids and Proposals website, at https://www.flyroa.com/current-bids-and-proposals. Electronic copies of the Contract Documents can also be obtained by emailing Troy Philpott, Procurement and Contracts Manager, Roanoke Regional Airport, at Troy.Philpott@flyroa.com.

Bidders are invited to submit bids for this work on the bid forms provided in the package; other bid forms will not be accepted. The successful bidder shall be required to have and maintain a Class “A” Virginia Contractor’s License and not less than $10,000,000.00 in general liability, $1,000,000.00 in motor vehicle insurance, and $5,000,000.00 umbrella insurance. Contractor, its employees and any subcontractors’ employees will be required to submit to federal security threat assessments, may be subject to fingerprint-based criminal records checks, and must be and remain approved by the Commission for access to airport secure areas.

Each bid must be accompanied by a bid security in a form acceptable to the Commission in an amount equal to at least five percent (5%) of the amount of the bid by the Contractor, payable to the Roanoke Regional Airport Commission, as a guaranty that if the bid is accepted, the bidder will execute the Contract and file required Performance and Payment Bonds within the time provided in the Instructions to Bidders.

Minority business enterprises will be afforded full opportunity to submit bids in response to this Invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

A Pre-bid Meeting will be held in the Airport Terminal Building, 2nd Floor, Commission Conference Room A, at 1:00 PM on Tuesday, July 28, 2026. No other escorted reviews of the site will be provided.

The Roanoke Regional Airport Commission reserves the right to waive any informalities, technicalities, or irregularities in a Bid, or to reject any or all bids, or to re-advertise for bids and to award or refrain from awarding the Contract for the project specified, should any such action be deemed to be in the best interest of the Commission.

https://eva.virgina.gov/ https://www.flyroa.com/current-bids-and-proposals https://www.flyroa.com/current-bids-and-proposals mailto:Troy.Philpott@flyroa.com

If the bid by the lowest responsible bidder exceeds funds allocated for the project, the Commission reserves the right to negotiate with the apparent low bidder pursuant to the terms set out in the Instructions to Bidders. The Commission additionally reserves the right to reject any and all bids, and to accept any part of or combination of bids, to waive any informalities or irregularities in any bid, and to award the Contract to other than the lowest bidder, should it be deemed to be in the best interest of the Commission. If a contract is awarded to other than the low bidder, it will be awarded to the lowest responsible and responsive bidder.

The Roanoke Regional Airport Commission in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (42 U.S.C. §§2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, all businesses and contractors will be afforded full and fair opportunity to submit bids in response to this invitation and no businesses or contractors will be discriminated against on the grounds of race, color, national origin (including limited English proficiency), creed, sex, age, or disability in consideration for an award.

All bidders shall endeavor to afford Disadvantaged Business Enterprises (DBEs) a reasonable opportunity to participate in this project. The Commission's goal for DBE participation is 0.0%.* All bidders wishing to remain in competition for the contract shall submit documentation of their DBE goal accomplishments or good faith efforts in accordance with the bid documents. All bidders hereto acknowledge that DBE policy is determined and administered by the Federal Government, specifically the United States Congress and Executive Branch agencies such as the United States Department of Transportation and the Federal Aviation Administration. Bidders further acknowledge that Federal DBE policy may change during the life of the project, and the awarded contractor shall abide by any such change in policy, as duly enacted or mandated, and shall execute any contractual amendments necessary to place this acknowledgement into effect.

*The published DBE goal is 0.0%, however, the Commission has an aspirational goal of 8.9% for DBE participation.

ROANOKE REGIONAL AIRPORT COMMISSION

INSTRUCTIONS TO BIDDERS

I. GENERAL

A. The Contractor covenants and agrees that it and its agents and employees shall comply with and shall be solely responsible for compliance with all applicable municipal, state and federal laws, national and local codes, and Roanoke Regional Airport Commission rules and regulations applicable to the removal, preparation, and installation of materials and other associated products and services to be provided pursuant to the Contract Documents.

B. As used herein, the terms "Owner," "Commission," "Airport Commission," or "Sponsor," or shall refer to the Roanoke Regional Airport Commission.

C. As used herein, the terms "Work," or "Project" shall refer to all construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment, and services provided or to be provided by the Contractor to fulfill the Contractor's obligations.

D. As used herein, the terms "Contractor" and "successful bidder" shall refer to the person or entity selected to enter a contract with the Commission for the above referenced Work.

E. As used herein, the term “Contract” or "Contract Documents" shall mean and include the Invitation to Bid, Instruction to Bidders, Bid Forms, the Performance Bond, Labor and Material Payment Bond, Contract Form, General Conditions, Drawings, Technical Specifications, Supplementary Drawings, any addenda issued to bidders, and any other documents specifically incorporated by reference in the Contract Form.

F. Attention of all prospective bidders is directed to the fact that the Airport Commission is a governmental body, and in accordance with Virginia law is not subject to state sales tax; however, such exclusion does not extend to Contractor in its purchase of goods and services for the Project.

G. The Contractor shall procure all permits and licenses, pay all charges and fees, and give all notices necessary and incidental to the due and lawful prosecution of the Work.

H. LIQUIDATED DAMAGES. Time is of the essence in the completion of the Work. Bidders are advised that the Contract Documents do contain provisions for liquidated damages, including without limitation, liquidated damages for failure to complete the Work in a timely manner. By submitting a bid, a bidder acknowledges and agrees that the bidder has been advised of such liquidated damages and has reviewed and agreed to all liquidated damages provision in the Contract Documents, including, without limitation, Contractor’s waiver of any defenses as to the validity of such liquated damages based on such liquidated damages being void as penalties or not being reasonably related to actual damages.

I. All proposals or bids and any accompanying or related information submitted to the Commission will become the property of the Commission and will not be returned. Trade secrets or proprietary information submitted by a proposer or bidder may not be subject to the Virginia Freedom of Information Act (Section 2.2-3700 et seq.), provided that the proposer or bidder: (i) properly invokes the protections of the applicable sections of the Virginia Code, as amended, including, without limitation, Virginia Public Procurement Code Section 2.2- 4342 for trade secrets or proprietary information prior to or upon submission of the data or other materials to be protected; (ii) clearly identifies the data or other materials in the proposal to be protected; and, (iii) states in writing the reasons why protection is necessary.

By submitting a proposal or bid, the submitting entity consents and agrees that, notwithstanding any express or implied claim of copyright, any and all documents submitted to the Commission are not subject to copyright and, as such, may be copied; however, the release of such documents shall be governed by applicable law, including, without limitation, the Virginia Freedom of Information Act.

J. Note: This public body does not discriminate against faith-based organizations in accordance with the Code of Virginia 2.2-4343.1 or against a bidder or offeror because of race, religion, color, sex, national origin, age, disability, or any other basis prohibited by state law relating to discrimination in employment.

II. GENERAL BOND REQUIREMENTS

A. Bid Bond

Each separate Bid shall be accompanied by a Certified or Cashier's Check or a Bid Bond on the form provided herein in the amount of not less than five percent (5%) of the total amount bid, including all alternates, made payable to the Roanoke Regional Airport Commission. If a Bid Bond is provided in lieu of a Certified or Cashier's Check, it must be signed by the bidder as principal and by a corporate surety authorized to transact business in Virginia, be substantially on the form included with the Bid Forms herein, include an executed surety bond affidavit and be accompanied by a valid power of attorney indicating that the person signing the bond on behalf of the Surety has full legal authority to do so.

B. Performance and Labor and Material Payment Bonds

Good and sufficient Performance and Labor and Material Payment Bonds in substantially the forms contained in these specifications and in the sum of not less than 100 percent of the contract amount, with a surety Company satisfactory to the Owner and licensed to conduct business in the Commonwealth of Virginia, will be required of the Contractor guaranteeing that the contract, including the various guarantee periods hereunder, will be faithfully performed and that labor and material suppliers shall be paid. The fully executed Bonds, along with appropriate Power of Attorney and the executed Contract shall be delivered to Owner, no later than fifteen (15) calendar days from the date of receipt of Owner's Notice of Award. If, at any time after the execution of the agreement, Owner shall deem the surety or sureties upon such bond or bonds to be unsatisfactory, or if, for any reasons, such bond or bonds ceases to be adequate to cover the performance of the work as above specified, Contractor shall, at its expense within five (5) days of receipt of Owner's written notice to do so, furnish additional bond or bonds in such form and amount and with such surety or sureties as shall be satisfactory to the Owner. In such event, no payment to the Contractor shall be deemed due under the agreement until such new or additional bond or bonds are furnished in a manner and form satisfactory to the Owner.

Only the Performance and Labor and Material Payment Bond Forms in substantially the form as are bound as within these documents are acceptable.

III. PREPARATION AND SUBMISSION OF BIDS

A. The Bidder must submit its Bid on the Bid Forms contained herein; no other form is acceptable. Any bid received after the time specified in the Invitation to Bid for receipt shall be returned to the bidder unopened.

B. All blank spaces in the Bid Forms must be correctly and completely filled in, where indicated, in ink or type written, except that all signatures shall be signed in ink by an official of the firm who is authorized to submit the bid.

C. The Bidder must state the price(s) (typewritten or in ink) both in words and numerals. Where a discrepancy occurs between the prices quoted in words and/or in numbers, the figure quoted in words shall take precedence and govern in the determining final costs or award of the contract.

D. Erasures or other changes in a Bid shall be made on the bid form and be explained or noted and dated over the signature of the Bidder prior to the bid submittal time and the sealing of the bid envelope. No alterations to the bid figures by notations on the outside of the envelope will be considered.

E. Bids containing reservations, exceptions, conditions, omissions, unexplained erasures or alterations, items not required in the bid or irregularities of any kind may be rejected by the Owner.

F. When requested by the Owner, a Power of Attorney or other satisfactory evidence of the authority of the official signing in behalf of the firm shall be furnished for the Owner's records.

G. The cost of any item whatsoever, not listed in the Bid Form, yet which is mentioned in the Specifications or shown on the Plans, shall be considered to be included in the cost of some other item of bid in the Bid Form or as part of the total bid price.

H. Information Required

1. The bidder must supply all information required by the bid and fully complete each page of the Bid Form in Section C and shall provide with its Bid the additional information and documents listed in this Section H. and Section I. below.

2. Each bidder shall present evidence of its experience, qualifications and financial ability, upon the form enclosed herein, to perform the work and to satisfactorily complete the project. Qualifications information shall include the identification of the proposed on-site superintendent with relevant project experience on similar work at the same level of responsibility (complete Part III of the Section C Bid Form).

3. No bid will be received and tabulated or considered, nor any contract awarded, unless the bidder has demonstrated in the bid form that it is properly licensed as a Class A Contractor, as required under the Code of Virginia (1950), as amended (complete Part II of the Section C Bid Form).

4. Each Bidder shall complete and submit with its bid the Worker's

Compensation Certificate of Coverage appearing as Part V of the of the Section C Bid Form of these contract documents. No award shall be made to any Bidder who fails to show such evidence of required Worker's Compensation coverage.

5. Every bidder shall include in its bid the identification number issued to it by the State Corporation Commission confirming that it is organized or authorized to transact business in the Commonwealth pursuant to Title 13.1 or Title 50. If the bidder is not required to be authorized to transact business in the Commonwealth as a foreign business entity under Title 13.1 or Title 50 or as otherwise required by law, the bidder or shall include in its bid a statement describing why the bidder is not required to be so authorized.

Any bidder that fails to provide the required information shall not receive an award unless a waiver of this requirement is granted by the Commission’s Executive Director. (Complete Part VI of the Section C Bid Form.)

7. Each bidder shall provide the bid bond or security specified in Section

A.II.A. above. (Complete Bid Bond Form found in Section C Bid Form of these bid documents)

I. Bid Submission

There are two options for submitting a bid for Rehabilitate Runway 6-24 project.

1. Electronic Submission:

Each Bidder shall submit its Bid via email to procurement@flyroa.com with the subject line clearly stating:

Bid For: Rehabilitate Runway 6-24

Roanoke Blacksburg Regional Airport Roanoke, Virginia Class "A" Virginia Contractor No.

The email must include the Bidder’s name and address in the body of the email. The Owner shall not be responsible for bids that are improperly submitted, misidentified, or not received dur to email transmission errors.

2. Physical Submission:

Each Bidder shall present its Bid in a sealed, opaque 9 x 12 inch envelope.

The outside of the envelope shall be plainly marked on the bottom left-hand corner with:

Bid For: Rehabilitate Runway 6-24

Roanoke Blacksburg Regional Airport Roanoke, Virginia Class "A" Virginia Contractor No.

with the name and address of the Bidder in the upper left-hand corner.

The Owner shall not be responsible for premature opening of bids not properly addressed and identified, as required herein.

All bids shall be delivered to the Roanoke Regional Airport Commission, Administrative Offices, 5202 Aviation Drive, Roanoke, VA 24012, no later than 1:00 PM local time on Tuesday, August 18, 2026.

mailto:procurement@flyroa.com

When sent by mail, no bid will be considered unless received by the Commission on or before the time and at the place designated in the Invitation to Bid. The Commission will in no way be responsible for delays caused by the U. S. Postal Service or any other deliverer of the bid, or for delay caused by any other occurrence. Any bid received after the time specified in the Invitation to Bid for receipt of bids, shall be returned to the Bidder unopened.

J. Both options for submittal shall contain the signed original copy of:

Bid Form Fully completed with all blanks filled in and all requested information provided (see Section A.H. 1-5) and including the signature of an authorized official of Bidder and the Bidder’s Class “A” Virginia Contractor’s License Number;

Bid Bond Bid Bond or Guarantee (see Section A.II.A.), fully completed and signed by Bidder and, if applicable, its Surety.

K. A pre-bid meeting and site review will be provided by Commission's representatives on Tuesday, July 28, 2026, at 1:00 PM in order to assist Bidders in preparing their bid packages. Any interested bidder should arrive at the Commission Office, 5202 Aviation Dr, Roanoke, VA 24012, by the specified time in order to discuss the project and be escorted to view the site.

As certain areas of work are in non-public, secure locations, all perspective bidders are strongly encouraged to attend the pre-bid meeting. No additional meetings or site reviews will be provided or allowed.

IV. INTERPRETATIONS

A. Each Bidder shall carefully examine the Contract Documents and all addenda or other revisions and thoroughly familiarize itself with the detailed requirements prior to submitting a Bid. Should a Bidder find discrepancies or ambiguities in, or omission from the Contract Documents, or should it be in doubt as to their meaning, it shall at once, and in any event, not later than 5:00 PM on Tuesday, August 11, 2026, notify Troy Philpott, the Owner's Procurement and Contracts Manager in writing of the nature of the problem or question. Said Manager will send or arrange for the sending of written Addenda and/or answers to questions to all Bidders of record who have requested a bid package. Bidders shall not seek nor be entitled to rely upon any oral instructions, statements, or interpretations by Owner or Owner's Consultant. All Addenda sent to Bidders will become a part of the Contract Documents.

B. Acknowledgment or receipt of all Addenda shall be made by each bidder in the space provided in the Bid Form.

V. MODIFICATIONS AND/OR WITHDRAWAL OF PROPOSALS

A. Prior to Bid Opening:

A Bidder may withdraw or revise (by withdrawal of one bid and submission of another) a bid, provided that Bidder's request for withdrawal is received by the Owner in writing or by telegram or fax before the time specified for opening bids. Revised bids must be received at the place specified in the Invitation to Bid before the time specified for opening all bids.

B. Withdrawal After Bid Opening:

1. A Bidder may withdraw its bid from consideration if the price bid is substantially lower than the other bids due solely to a mistake therein, provided the bid was submitted in good faith, and the mistake was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional arithmetic error or an unintentional omission of a quantity of work, labor or material made directly in the compilation of a bid, which unintentional arithmetic error or unintentional omission can be clearly shown by objective evidence drawn from inspection of original work papers, documents and materials used in the preparation of the bid sought to be withdrawn. The Bidder shall give notice in writing of its claim of right to withdraw its bid within two (2) business days after the conclusion of the bid opening procedure, and shall submit original work papers, documents and materials used in preparation of such bid with the written notice. The work papers, documents and materials submitted by the bidder shall, at the bidder’s request, be considered trade secrets or proprietary information. The mistake shall be proved only from the original work papers, documents and materials delivered as required herein.

2. No bid may be withdrawn under this section when the result would be the awarding of the contract on another bid of the same Bidder or of another bidder in which the ownership of the withdrawing bidder is more than five

(5) percent.

3. If a bid is withdrawn under the authority of this section, the lowest remaining responsive and responsible bid shall be deemed to be the low bid.

4. No Bidder who is permitted to withdraw a bid shall, for compensation, supply any material or labor to or perform any subcontract or other work agreement for the person or firm to whom the contract is awarded or otherwise benefit, directly or indirectly, from the performance of the project for which the withdrawn bid was submitted.

5. The Executive Director shall notify the bidder in writing within five business days of the decision regarding the bidder’s request to withdraw its bid. If the Commission's Executive Director denies the withdrawal of a bid under the provisions of this Section, the Executive Director shall notify the Bidder and Commission in writing shall state in such notice the reasons for the decision and shall recommend award of the Contract by Commission to such Bidder at the bid price, provided such Bidder is a responsible and responsive bidder. At the same time that the notice is provided, the Commission shall return all work papers and copies thereof that have been submitted by the bidder.

VI. REJECTION OF BIDS

A. Bids containing any omission, alterations of form, additions, exceptions or conditions not called for, conditional or alternate bids unless called for, or incomplete bids may be considered nonresponsive, irregular, or informal and may be rejected.

B. If the bid from the lowest responsible and responsive bidder exceeds funds budgeted and tentatively allocated for this specific project, the Executive Director may negotiate with the apparent low bidder to obtain a contract price within available funds. The Executive Director shall determine that the lowest responsible and responsive bid exceeds funds available for this project and notify such bidder in writing of the Commission's desire to negotiate.

Thereafter, negotiations with the apparent low bidder may be held to obtain a contract within available funds involving discussions of reduction of quantities, or other cost saving mechanisms. Any such negotiated contract shall be subject to the Commission's final approval.

C. The Commission reserves the right to award the Contract to a Bidder other than the apparent low Bidder if such bidder is not the lowest responsible and responsive bidder. Should a contract be awarded to a Bidder other than the apparent low Bidder, it will be awarded to the lowest responsive and responsible Bidder meeting all requirements of these Contract Documents.

D. The Commission reserves the right to accept or reject alternates in any order or combination, to waive any informalities or irregularities in any bid, to accept any part of or combination of bids, to reject any or all bids, and to re-advertise and rebid, should any said action be deemed to be in the best interest of the Commission.

VII. AWARD AND EXECUTION OF CONTRACT

A. Consideration of Bids and Award of Contract

The Commission reserves the absolute right to consider all bids and to determine, after such consideration, whether to award a contract for the

Project. If a contract is awarded, the award will be to the lowest responsive and responsible bidder selected by the Commission; as such award may be evaluated to be in the best interest of the Commission. No award will be made until the Commission has concluded such investigations as it deems necessary to establish the responsibility, qualifications and financial ability of the bidders and their products to perform in accordance with the contract documents to the satisfaction of the Commission within the time prescribed.

The Commission reserves the right to reject the bid of any bidder who does not pass such investigation to the Commission's satisfaction. If the Contract is awarded, the Commission will give the successful bidder written notice of the award within sixty (60) calendar days after the opening of the bids. Until the final execution and delivery of the Contract back to the successful bidder, the Commission reserves the right to reject any or all bids, to waive informalities, technicalities or non-material defects or to advertise for new bids, or to proceed to do the work otherwise should any such action be deemed to be in the best interests of the Commission.

B. Acceptance of Bid

As soon as the bids have been reviewed and compared, which shall occur within thirty (30) consecutive calendar days after the Bid Opening date, the Roanoke Regional Airport Commission may give written notice of its intent to award a contract. Actual award of contract, if it is to be awarded, is contingent upon receipt of grant funding for the project and shall be made within one hundred and eighty (180) consecutive calendar days after Bid Opening Date.

The successful bidder shall be required, within fifteen (15) consecutive calendar days after the receipt of the "Notice of Bid Acceptance" to execute the Contract and return the Contract to the Commission.

C. Execution of Contract

The successful Bidder shall sign (execute) the Contract and return such signed Contract to the Owner, along with required insurance certificates and completed bond forms within fifteen (15) calendar days from the date of receipt of the Notice of Award by Owner. If the successful Bidder shall fail to execute the Contract within such fifteen (15) day period, the Commission may require forfeiture of the Bid Security, pursue any other remedies available at law or in equity, rescind the contract award and/or the Commission may then proceed to accept the Bid of the next lowest responsive and responsible Bidder. If the Contract is mailed, special handling is recommended.

D. Approval of Contract

Upon receipt from the successful bidder of required insurance documents, the executed Contract, the Performance and Payment Bonds, the construction schedule and any other required documents, the Owner may complete the execution of the Contract in accordance with applicable laws, and return a copy of the fully executed Contract to the Contractor. No contract is binding upon the Owner until it has been executed by the Owner and delivered to the Contractor. Work shall commence only upon Contractor’s receipt of a written notice to proceed from Owner.

E. Failure to Execute Contract

Failure of the successful bidder to execute the Contract and furnish the required insurance documents and bonds within the 15 calendar days period after receiving Notice of Award shall be just cause for cancellation of the award. An award may then be made to the next lowest responsive and responsible bidder, or the work re-advertised, or handled as the Owner may determine in its sole and exclusive discretion.

F. Failure to Accept Bids

Should no "Notice of Bid Acceptance" be issued by Owner within one hundred and eighty (180) consecutive calendar days after the opening of bids, each Bidder may have its bid security returned from Owner.

SECTION B

GENERAL CONDITIONS

GENERAL CONDITIONS

1. Contract Documents

Contract Documents ("Contract") shall include: the Invitation to Bid, Instructions to Bidders, Completed Bid Forms, Addenda issued to Bidders, Completed Contract Form, General Conditions, Performance Bond, Labor and Material Payment Bond, Technical Specifications, Drawings, Supplementary Drawings, Appendices, and any Supplemental Agreements between the parties.

2. Time of Completion (Contract Time), Notice to Proceed and Liquidated

Damages

A. Contract Time. The work under this Contract shall be completed and final acceptance issued by the Owner in accordance with Subparagraph B below.

B. Notice to Proceed. The Contractor will be issued two Notices to Proceed for the work under this Contract. The first Notice to Proceed for Phase 1- Administrative Services will be issued upon the return of the executed Contract to Contractor. During Phase 1, Contractor will attend a preconstruction conference, prepare, submit and have approved work and phasing schedules, safety plans, color samples, other required submittals, etc.; arrange for its employees and/or subcontractors to be background checked, trained and badged for access to and work within the airport secured areas; and order supplies and other equipment needed for the project. All work preliminary to the actual start of labor at the Airport must commence within ten (10) calendar days and completed within two hundred and forty (240) calendar days of the effective date of the first Notice to Proceed.

Review time by the Owner and/or Engineer during which Contractor can undertake none of the administrative tasks shall not be counted as part of this time period.

The second Notice to Proceed will be for Phase 2 –Performance of the Work, which will be issued by Owner at the expiration of the Phase I time period. All Phase 2 Work on site shall commence within ten (10) calendar days and shall be Substantially Complete within one hundred and fifty (150) calendar days and achieve Final Acceptance within one hundred and eighty (180) calendar days of the effective date of the Phase 2 Notice to Proceed, including all inspections and testing procedures required by these contract documents.

In the event that Contractor fails to complete the Phase I work within the time allowed, Owner may still issue the second notice to proceed; however, Contractor may not enter the work site or begin work at the airport prior to the obtaining of all required permits and receipt of security badges and the approval of all required submittals, nor shall the Phase 2 calendar days be tolled while the contractor is unable to work. In such case, Owner would also have a basis for canceling the Contract for cause in accordance with the Contract Documents.

The Contractor shall notify the Owner and the Consultant at least 48 hours in advance of the time any operations will begin at the Airport.

C. Liquidated Damages. Time is of the essence in the completion of this Contract. The Contract Documents contain provisions for liquidated damages, including without limitation, liquidated damages for failure to complete each phase of the Work in a timely manner and a waiver by Contractor of any defenses as to the validity of such liquidated damages.

Contractor acknowledges and agrees that the Contractor has been advised of such liquidated damages and has reviewed and agreed to all liquidated damages provisions in the Contract Documents, including, without limitation, Contractor’s waiver of any defenses as to the validity of such liquated damages based on such liquidated damages being void as penalties or not being reasonably related to actual damages.

3. Owner's Representative

In addition to Owners employees, Owner has contracted for the services of a Consultant to draft and interpret technical specifications and to provide oversight for the Project.

Whenever in these Contract Documents reference is made to "Consultant", "Architect" or "Engineer," it is intended to mean Delta Airport Consultants, Inc. and any other consultant contracted by the Owner to assist on this project.

4. Authority of the Consultant

The Consultant shall decide any and all questions which may arise as to the quality and acceptability of materials furnished, work performed, and as to the manner of performance and rate of progress of the Work. It shall decide all questions which may arise as to the interpretation of the specifications or plans relating to the Work and the fulfillment of the contract on the part of the Contractor. The Consultant shall determine the amount and quality of the several kinds of work performed and materials furnished which are to be paid for the under contract.

5. Conformity with Drawings and Specifications

If the Consultant finds the materials furnished, work performed, or the finished product not within reasonably close conformity with the Contract Documents, but that the portion of the Work affected will, in its opinion, result in a finished product having a level of safety, economy, durability, and workmanship acceptable to the Owner, it will advise the Owner of its determination that the affected work be accepted and remain in place. In this event, the Consultant will document its determination and recommend to the Owner a basis of acceptance which will provide for an adjustment in the contract price for the affected portion of the work. The Consultant's determination and recommended Contract price adjustments will be based on good consulting judgment and such tests or retests of the affected work as are, in its opinion, needed. Changes in the contract price shall be covered by contract modifications (change order or supplemental agreement) as applicable.

If the Consultant finds the materials furnished, work performed, or the finished product are not in reasonably close conformity with the drawings and specifications and have resulted in an unacceptable finished product, the affected work or materials shall be removed and replaced or otherwise corrected by and at the expense of the Contractor in accordance with the Owner's and/or Consultant's written orders.

For the purpose of this subsection, the term "reasonably close conformity" shall not be construed as waiving the Contractor's responsibility to complete the Work in accordance with the contract, drawings, and specifications. The term shall not be construed as waiving the Consultant's right to insist on strict compliance with the requirements of the Contract Documents, during the Contractor's prosecution of the Work, when, in the Consultant's opinion, such compliance is essential to provide an acceptable finished portion of the Work or for the Project.

For the purpose of this subsection, the term "reasonably close conformity" is also intended to provide the Consultant with the authority to use good professional judgment in its determinations as to acceptance of work that is not in strict conformity but will provide a finished product equal to or better than that intended by the requirements of the Contract Documents.

6. Coordination of Contract, Drawings, and Specifications

The Contractor shall not take advantage of any apparent error or omission on the Contract Documents. In the event the Contractor discovers any apparent error or discrepancy, it shall immediately call upon the Consultant for its interpretation and decision, and such decision shall be final.

7. All Costs Included

The Contractor shall provide and pay for all permits, materials, equipment, labor, demolition, transportation, inspections, disposal costs, delivery charges, fuel, telephone, room and board expenses, and all other facilities and incidentals necessary for the execution and completion of the work as described in the Contract Documents. No amount in addition to the bid price will be paid Contractor for any of the work or services specified in the Contract Documents.

All materials and equipment added and incorporated in the work shall be new, unless otherwise specified. If required by the Owner, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment.

8. Laws to Be Observed

Contractor expressly warrants that in the performance of the Work it shall comply with all applicable laws, codes, regulations, standards, etc., which may be required of it by all applicable local, state and federal jurisdictions and their respective agencies, offices, bureaus, and other administrative/regulatory entities, including, but not limited to, all local, state and federal ordinances, laws and regulations, concerning building and fire codes, solid waste and environmental matters, FAA, TSA and airport security regulations, and all applicable sections of the Occupational Safety and Health Act (OSHA), the Virginia Uniform Statewide Building Code.

The Contractor shall be responsible for arranging all inspections by local authorities for compliance with all building code requirements, ordinances and regulations.

9. Permits, Licenses, and Taxes

The Contractor shall be solely responsible for providing and shall procure all permits and licenses, pay all charges, fees, and taxes, and give all notices necessary and incidental to the due and lawful prosecution of the Work.

The Contractor shall obtain or possess a valid Contractor's Business License in accordance with any applicable City of Roanoke Ordinances.

A City of Roanoke Building permit is required for this project.

10. Airport Security

A. Work Area and Badges

Contractor acknowledges that all work for this phase work will be performed within “Secured Area, “SIDA” and/or “Sterile Area”, which is/are highly restricted access area(s) and are referred to individually and collectively herein as “Security Restricted Areas.” Contractor agrees to be responsible for, and to ensure that, none of its employees, agents, subcontractors or representatives gains access, enters or moves about the Security Restricted Area(s) without prior approval of the Owner's Executive Director as evidenced by a Commission issued identification badge, or constant escort by a duly authorized and badged employee of the Owner; and that the Contractor, its employees, agents, subcontractors and representatives shall comply with the requirements of Owner's federally mandated security program at Contractor's sole cost and shall be subject to the penalties of such program. Only persons delivering materials or performing job functions of extremely short duration will be permitted to enter and remain inside any Security Restricted Area under escort by a badged representative of

Contractor; all other persons involved with and performing the Work must be approved, trained and badged.

Prior to issuance of a Commission identification badge, an authorized representative of Contractor shall designate an individual, in writing and on company letterhead, to serve as the Consultant’s “Authorized Signatory.”

Only the Contractor’s Authorized Signatory may initiate requests for unescorted access to the Security Restricted Areas of the airport for its employees or subcontractors, in accordance with the Commission’s Airport Security Plan (ASP). The Authorized Signatory and each employee for whom access is being requested must submit to a Security Threat Assessment, vetting applicants through various TSA databases, and further, the Authorized Signatory and each employee for whom access to the Secured Area, Sterile Area or a Security Identification Display Area (SIDA) is requested shall be required to submit to a fingerprint based criminal history records check. The Authorized Signatory and all persons for whom badges are requested will be required to attend a security training taught or overseen by Commission personnel. The Owner reserves the right to deny unescorted access within one or more of the Security Restricted Areas to some or all Consultant’s employees or the employees of Consultant’s subcontractors.

Contractor agrees that it shall be responsible for paying a $30.00 deposit for each identification badge issued. In the event the badge is returned at the completion of the work, then the deposit shall be returned to Contractor. In the event that any badge is not returned, then the deposit for the badge shall be forfeited and Contractor may be held in violation of TSA regulations and be subject to a fine up to $10,000.00. In the event that the badge is lost or otherwise unaccounted for during the time the work is being performed, then the deposit shall be forfeited and a new deposit and fee shall be charged for the replacement badge in accordance with the schedule of fees established by the Commission. Currently the first replacement badge will be $50.00, second replacement badge $75.00 third replacement badge $100.00 during any consecutive twelve-month period. Contractor understands and agrees that the fees and charges listed above are subject to revision by the Commission at any time and that it shall be subject to the fees established from time to time by the Commission.

Upon voluntary or involuntary termination of employment or completion of the work at the Airport, Contractor shall notify Airport Security within 8 hours and surrender the identification badge(s) as soon as possible.

Contractor must keep employment records for each identification badge applicant for at least 180 days after termination of unescorted privileges and return of the badges.

B. Tools

Recognizing that certain portions of the terminal area where the work may be or is being performed is located inside the Secured Area/SIDA and/or Sterile Area, Contractor shall take extraordinary measures to ensure that none of its tools or materials shall be left in any area where they might be picked up and taken onto an aircraft by passengers or other persons in violation of TSA regulations.

C. Vehicles

Contractor agrees that any vehicles that it may be permitted to bring inside the security fence line shall be commercial vehicles, properly insured and identified with the company name on both sides of the vehicles using letters eight inches or greater in height, and subject to search before each entry, as well as subject to escort by Commission personnel at all times it or they are in operation. Contractor may also be required to affix a Commission issued vehicle decal to each such vehicle.

All persons routinely driving such vehicles shall be trained regarding driving inside the security fence in an area where aircraft are operating, and/or be escorted by an employee of the Commission.

In addition, Contractor shall keep its vehicles and any bins, tool boxes, etc.

located therein, in a locked condition whenever located inside the fence and Contractor is not actively engaged in the process of removing/replacing tools and materials into or out of the vehicle.

It is anticipated that only very infrequent access within the fence line by vehicles delivering certain materials or equipment will be allowed with this contract. Such vehicles shall be escorted by Owner's personnel at all times.

Most materials will be stored outside the Security Restricted Areas at a location designated by the Owner.

D. Access Points

The Contractor shall use only authorized access points and routes into and within the Security Restricted Areas. Contractor is responsible for ensuring that all employees of Contractor and the subcontractors use only the authorized access points and approved routes to access the work sites, and that they verify that the access points are secure immediately after use. Gates that fail to secure must be immediately reported to an Airport Law Enforcement Officer. The persons and vehicles entering the any part of a Security Restricted Area shall proceed immediately to and from the work sites and the entrance gate, and shall not unnecessarily drive or walk onto or across any aircraft parking or taxiing area.

The airport is subject to TSA security requirements and rigid adherence is mandatory. Any fines resulting from unauthorized contractor’s personnel entering a Security Restricted Area or being left without escort or other security violations by Contractor, its employees and subcontractors will be deducted from money otherwise due Contractor.

E. Remaining within Work Site

Contractor shall delineate limits of construction and access with its employees daily. None of Contractor’s employees or those of its subcontractors should move beyond or outside such limits without authorization of the Owner. Violators are subject to removal from the jobsite and loss of the identification badge and working privileges inside one or more Security Restricted Areas, as applicable.

11. Prosecution and Progress

The Contractor shall bring to the Preconstruction Conference its progress schedule for the Consultant's approval. The Contractor's progress schedule, when approved by the Consultant, may be used to establish major construction operations and to check on the progress of the Work. The Contractor shall provide sufficient materials, equipment, and labor to guarantee the completion of the project in accordance with the drawings and specifications within the time set forth in the Contract Documents.

If the Contractor falls behind the submitted schedule, the Contractor shall, upon the Consultant's request, submit a revised schedule for completion of the Work within the contract time and modify its operations to provide such additional materials, equipment, and labor necessary to meet the revised schedule. Should the prosecution of the Work be discontinued for any reason, the Contractor shall notify the Consultant at least 48 hours in advance of resuming operations.

The Contractor shall not commence any work prior to the effective date on which the notice to proceed is issued by the Owner. Once begun, the Contractor shall perform the work continuously until completion.

12. Character of Workers, Methods, and Equipment

The Contractor shall, at all times, employ sufficient labor and equipment for prosecuting the work to full completion in the manner and time required by the Contract Documents.

All workers shall have sufficient skill and experience to perform properly the work assigned to them. Workers engaged in special work or skilled work shall have sufficient experience in such work and in the operation of the equipment required to perform the work satisfactorily. Neither Contractor nor its employees, agents, invitees or subcontractors shall bring any firearms or other weapons onto airport property; nor shall any person come onto or remain upon airport property while under the influence of alcohol or illegal drugs.

Any person employed by the Contractor or by any subcontractor who, including the project superintendent, in the opinion of the Consultant, does not perform his work in a proper and skillful manner or is intemperate or disorderly shall, at the written request of the Consultant or Owner, be removed forthwith by the Contractor or subcontractor employing such person, and shall not be employed again in any portion of the Work without the consent of the Consultant or Owner.

Should the Contractor fail to remove such person or persons or fail to furnish suitable and sufficient personnel for the proper prosecution of the Work, the Consultant may suspend the Work by written notice until compliance with such orders.

All equipment which is proposed to be used on the Work shall be of sufficient size and in such mechanical condition as is necessary to meet requirements of the Work and to produce a satisfactory quality of Work. Equipment used on any portion of the Work shall be such that no injury to previously completed Work, adjacent property, existing airport facilities or persons will result from its use.

No gunpowder-activated equipment shall be utilized on this project.

When the methods and equipment to be used by the Contractor in accomplishing the Work are not prescribed in the Contract, the Contractor is free to use any methods or equipment that will accomplish the Work in conformity with the requirements of the Contract Documents.

When the Contract specifies the use of certain…

This is the start of the file's text. The full file is on GovTribe.