834754padot110066.pdf
PDF 1012 KB Posted
- Attached to
- Box Culvert Bundle-Round 2 State and local contract opportunity
- Solicitation number
- 110066
- Issued by
- Lehigh County, Pennsylvania
About this file
This is a proposal report for a construction project (Project 110066) issued by the Pennsylvania Department of Transportation (PennDOT) in District 05 for culvert replacements and miscellaneous construction work. The project involves replacing box culverts on State Routes 143, 1015, and 4014 across multiple townships in Lehigh and Northampton Counties. The scope of work includes clearing and grubbing, excavation, asphalt paving, drainage installation, guide rail installation, erosion control measures, and the construction of precast reinforced concrete box culverts in two sizes (15.0' x 3.5' and 10'-6" x 6'-0"). The project is divided into numerous line items with specified quantities, including over 3,400 square yards of asphalt base course, approximately 2,300 linear feet of pavement markings, and various structural and temporary measures. The bid package is scheduled for letting on August 13, 2026, with an anticipated Notice to Proceed of September 28, 2026, and required completion by November 3, 2028. No pre-bid meeting was scheduled, and the location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room in Harrisburg.
The project is 100% state-funded (non-federal) with an estimated cost range of $1,000,000 to $2,499,999.99 and a structure work component representing 47% of the total contract value. Prequalification is required for bidders. The project is subject to prevailing wage requirements, equal employment opportunity provisions with prequalification, and Worker Protection and Investment Act compliance. Special provisions include Diverse Business (DB) requirements for non-federally funded projects, erosion and sediment control plan requirements, right-to-know law compliance, and Build America, Buy America Act provisions regarding manufactured products and construction materials. The proposal documents specify payment methodologies for stored materials, asphalt and concrete pavement ride quality incentives, and concrete compressive strength acceptance criteria, with detailed liquidated damages provisions for road user impacts and environmental noncompliance. Material certifications must be submitted electronically through the Electronic Certified Material Submission (ECMS) system, and all addenda will be posted electronically.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL Report - Project 110066
July 16, 2026 14:35:12 PM Page 1 of 95
PROPOSAL REPORT
Project: 110066 Bid
Package: 1
Current Let: 08/13/2026 11:00:00 AM
Version: Current Addendum
Count: 0
District: 05 County: Lehigh
SR/SEC/
Group ID: 143/BC2/---
Description
Box Culvert Bundle-Round 2
July 16, 2026 14:35:12 PM Page 2 of 95
TABLE OF CONTENTS
BID PACKAGE SUMMARY
PROJECT ITEMS AND QUANTITIES
SPECIAL PROVISIONS
G51A - a00051 APPLICABLE DESIGNATED SPECIAL PROVISIONS (STATE) G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW C164A - a00164 CHANGES TO SPECIFICATIONS: SECTION 106 C166A - a00166 CHANGES TO SPECIFICATIONS: SECTIONS 107 AND 608 C167A - a00167 CHANGES TO SPECIFICATIONS: APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
C168A - a00168 CHANGES TO SPECIFICATIONS: SECTIONS 110, 404, AND 507 C169A - a00169 CHANGES TO SPECIFICATIONS: SECTION 419 C170A - a00170 CHANGES TO SPECIFICATIONS: SECTIONS 110, 501, 506, 530, 703, and 704 C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413 C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876 G311A - a00311 ROAD USER LIQUIDATED DAMAGES (RULD) G901B - a00901 ALTERNATE EROSION AND SEDIMENT POLLUTION CONTROL PLAN G1101B - a01101 CONSTRUCTION PROCEDURES - EROSION AND SEDIMENT POLLUTION
CONTROL
G1401A - a01401 EQUAL EMPLOYMENT OPPORTUNITY WITH PREQUALIFICATION G2302A - a02302 Worker Protection and Investment G3401A - a03401 PREVAILING WAGE ACT G3501B - a03501 RECIPROCAL LIMITATIONS ACT REQUIREMENTS FOR CONSTRUCTION 00 - b01031 SECTION 103.05 ADDITIONAL INSURED P1061D - b01061 Electronic Submission of Material Certifications through ECMS P1062D - b01062 Electronic Submission of Material Certifications through ECMS for Lump Sum Component items
S6012B - b06012 - SECTION 601.3(f) BACKFILLING TRENCH S6092B - b06092-SECTION 609.2(f) MISCELLANEOUS MATERIALS 00 - b90001 15.0' X 3.5' PRECAST REINFORCED CONCRETE BOX CULVERT 00 - b90001 CONSTRUCTION RESTRICTIONS 00 - b90001 PRECAST REINFORCED CONCRETE INLET SECTION, S-41241 00 - b90001 PRECAST REINFORCED CONCRETE OUTLET SECTION, S-41241 00 - b90002 10'-6" X 6'-0" PRECAST REINFORCED CONCRETE BOX CULVERT SEGMENTS 00 - b90002 PRECAST REINFORCED CONCRETE INLET SECTION, S-42737 00 - b90002 PRECAST REINFORCED CONCRETE OUTLET SECTION, S-42737 I68C - c00068 ITEM 9000-5101 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION
AGGREGATE
I70C - c00070 ITEM 9000-5103 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION
CONCRETE
July 16, 2026 14:35:12 PM Page 3 of 95
00 - c02011 ITEM 4201-0001 CLEARING AND GRUBBING, RETAINED TREES I6091L - c06091 ITEM 0609-0009 EQUIPMENT PACKAGE 00 - c06202 ITEM 4620-1600 TYPE 31-S GUIDE RAIL, CURVED 00 - c08501 ITEM 4850-0035 ROCK, CLASS R-7, GROUTED 00 - c08502 ITEM 4850-0031 ROCK CLASS 3 CHOKED WITH #57 COARSE AGGREGATE 00 - c08661 ITEM 4866-0005 HEAVY DUTY SILT BARRIER FENCE WITH TEMPORARY
PROTECTIVE FENCE MATERIAL
00 - c09011 ITEM 0901-000X MAINTENANCE AND PROTECTION OF TRAFFIC DURING
CONSTRUCTION
00 - c10181 ITEM 1018-0002 REMOVAL OF EXISTING BRIDGE 00 - c10183 ITEM 1018-0004 REMOVAL OF EXISTING BRIDGE 00 - c10184 ITEM 1018-0061 REMOVAL OF EXISTING CULVERT I80141A - c80141 ITEM 8510-000X PRECAST REINFORCED CONCRETE BOX CULVERT, AS
DESIGNED, S-41241 & S-42737
00 - c85102 PART B SPECIAL DRAWINGS AND SPECIAL DESIGN REQUIREMENTS S-41241 & S-42737
00 - c90100 ITEM 9000-0100 PRECAST REINFORCED CONCRETE BOX CULVERT 00 - c90220 ITEM 9000-022X OVEREXCAVATION AND BACKFILLING UNDER FOUNDATIONS 00 - c90350 ITEM 9000-0350 TEMPORARY DRIVEWAY 00 - c90410 ITEM 9000-0410 ASPHALT DRIVEWAY ADJUSTMENT 00 - c90500 ITEM 9000-0500 UNFORSEEN ROADWAY REPAIRS 00 - c90842 ITEM 9000-0842 RECOGNIZED QUALIFIED BOG TURTLE SURVEYOR 00 - c90852 ITEM 9000-0851/0852 STOCKPILING AND PLACEMENT OF STREAMBED MATERIAL
AT CULVERT
00 - c91908 ITEM 9000-1908 TEMPORARY COFFERDAM 00 - c91910 ITEM 9000-1910 TEMPORARY COFFERDAM AND PUMP BYPASS SYSTEMS 00 - c91913 ITEM 9000-1913 TEMPORARY PUMP BYPASS SYSTEM
July 16, 2026 14:35:12 PM Page 4 of 95
BID PACKAGE SUMMARY
Project: 110066 Bid Package: 1
Project Type: Standard Posted:
Federal Project Status: Non - Federal (100% State) State Type of Work: BOX CULVERTS
Prequalification Required: Yes Pre-Bid Meeting: None
408 Version: 2026-IE
Scheduled Let: 08/13/2026 11:00:00 AM Project Cost Range: $1,000,000.00 - $2,499,999.99 Anticipated NTP: 09/28/2026 Structure Work: 47.00%
Required Completion: 11/03/2028 Wage Rates: Yes
Description:
This project consists of culvert replacements and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Routes 143-Section BC2 in Lynn Township, Lehigh County and State Routes 1015-Section BC2 and SR 4014-Section 01B in Lower Mount Bethel Township, and Moore Township Northampton County.
Additional Information:
This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to contact Contract Awards and be escorted to the 7th Floor Contract Awards Room. Contract Awards can be reached at 717-395-9754.
Due to recent changes in the Keystone Building, there is no longer a reception on the 5th Floor to greet and check-in visitors.
July 16, 2026 14:35:12 PM Page 5 of 95
PROJECT ITEMS AND QUANTITIES
Alt Item Work Class Code Unit Of
Measure Quantity Unit Price PDP Spec
Prov Add Action
4201-0001 A Lump Sum 1.0000 N Proj
CLEARING AND GRUBBING , RETAINED TREES
0201-0002 A Lump Sum 1.0000 N
CLEARING AND GRUBBING
0201-0004 A Lump Sum 1.0000 N
CLEARING AND GRUBBING
0203-0001 C Cubic Yard 649.0000 N
CLASS 1 EXCAVATION
0204-0001 C1, H Cubic Yard 15.0000 N
CLASS 2 EXCAVATION
0204-0150 C1, H, S Cubic Yard 22.0000 N
CLASS 4 EXCAVATION
0205-0264 C1 Cubic Yard 4.0000 N
SELECTED BORROW EXCAVATION ROCK, CLASS R-4
0205-0285 C1 Cubic Yard 1.0000 N
SELECTED BORROW EXCAVATION, COARSE AGGREGATE, NO. 57
0208-0001 C Hour 4.0000 N
SPECIAL ROLLING
0208-0002 C1 Cubic Yard 10.0000 N
EXCAVATION/BACKFILL/COMPACTION
0208-0003 C3, H, M2 Square Yard 125.0000 N
GEOTEXTILE CLASS 4
0212-0001 C3, H, M2 Linear Foot 916.0000 N
GEOTEXTILE, CLASS 1
0212-0014 C3, H, M2 Square Yard 1,369.0000 N
GEOTEXTILE, CLASS 4, TYPE A
0313-0322 E Square Yard 846.0000 N SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, < 0.3 MILLION ESALs, 25.0 MM MIX, 4" DEPTH
0313-0422 E Square Yard 393.0000 N SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALs, 25.0 MM MIX, 4" DEPTH
0350-0104 C, E Square Yard 36.0000 N
SUBBASE 4" DEPTH (NO. 2A)
0350-0106 C, E Square Yard 899.0000 N
SUBBASE 6" DEPTH (NO. 2A)
July 16, 2026 14:35:12 PM Page 6 of 95
0350-0112 C, E Square Yard 393.0000 N
SUBBASE 12" DEPTH (NO. 2A)
0350-0121 C, E Ton 9.0000 N
SUBBASE (NO. 2A)
0413-0194 F Square Yard 360.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22, < 0.3 MILLION ESALS, 9.5 MM MIX, 1 1/2"
DEPTH, SRL-M
0413-0245 F Square Yard 1,274.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 9.5 MM MIX, 1 1/2"
DEPTH, SRL-H
0413-1019 F Ton 3.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE (SCRATCH), PG 64S-22, < 0.3 MILLION ESALS, 9.5 MM MIX, SRL-L
0413-1024 F Ton 9.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE (SCRATCH), PG 64S-22, 0.3 TO < 3 MILLION ESALS, 9.5
MM MIX, SRL-L
0413-2059 F Ton 7.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE (LEVELING), PG 64S-22, < 0.3 MILLION ESALS, 9.5 MM
MIX, SRL-L
0413-6035 F Square Yard 299.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64S-22, < 0.3 MILLION ESALS, 19.0 MM MIX, 2 1/2"
DEPTH
0413-6045 F Square Yard 974.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 19.0 MM MIX, 2 1/2"
DEPTH
0460-0001 F4 Square Yard 3,300.0000 N
ASPHALT TACK COAT
0461-0001 F4 Square Yard 78.0000 N
ASPHALT PRIME COAT
0491-0012 F3 Square Yard 12.0000 N MILLING OF ASPHALT PAVEMENT SURFACE, 1 1/2" DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR
0491-0013 F3 Square Yard 350.0000 N MILLING OF ASPHALT PAVEMENT SURFACE, 2" DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR
0491-0017 F3 Square Yard 12.0000 N MILLING OF ASPHALT PAVEMENT SURFACE, 4" DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR
0601-0331 H Linear Foot 40.0000 N
12" THERMOPLASTIC PIPE, GROUPII, 12'-1.5' FILL
0605-2600 K Each 1.0000 N
TYPE D ENDWALL
0605-2730 K Set 1.0000 N
TYPE M CONCRETE TOP UNIT AND GRATE
July 16, 2026 14:35:12 PM Page 7 of 95
0605-2850 K Each 1.0000 N
STANDARD INLET BOX, HEIGHT < /= 10'
0608-0001 X Lump Sum 1.0000 N
MOBILIZATION
0609-0003 X Lump Sum 1.0000 N
INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES, TYPE B
0609-0009 X Lump Sum 1.0000 N Std
EQUIPMENT PACKAGE
0610-7002 H2 Linear Foot 916.0000 N
6" PAVEMENT BASE DRAIN
0610-7400 H2 Cubic Yard 22.0000 N
ADDITIONAL COARSE AGGREGATE FOR EXTRA DEPTH PAVEMENT BASE DRAIN
0615-0022 H2 Linear Foot 108.0000 N
6" SUBSURFACE DRAIN OUTLETS
0615-0040 H2 Each 5.0000 N
SUBSURFACE DRAIN OUTLET ENDWALL
0615-0066 C1, H2, R Each 7.0000 N
66" RED SUBSURFACE DRAIN OUTLET MARKER
0619-0450 J3 Each 4.0000 N
PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 3, FLARED (MASH)
0619-0459 J1, J3 Each 2.0000 N
PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 3, TANGENT (MASH)
0620-0400 J Each 4.0000 N
TERMINAL SECTION, SINGLE
0620-0503 C1, J Linear Foot 587.0000 N
REMOVE EXISTING GUIDE RAIL (CONTRACTOR'S PROPERTY)
0620-0585 J Linear Foot 50.0000 N
RUBBING RAIL
0620-1600 J Linear Foot 300.0000 N
TYPE 31-S GUIDE RAIL
4620-1600 J Linear Foot 13.0000 N Proj
TYPE 31-S GUIDE RAIL , CURVED
0620-1625 J Linear Foot 25.0000 N
TYPE 31-SC GUIDE RAIL
0620-1635 J Linear Foot 100.0000 N
TYPE 31-SCC GUIDE RAIL
0620-1670 J Each 1.0000 N
July 16, 2026 14:35:12 PM Page 8 of 95
TYPE 31-STRONG POST IN-LINE ANCHOR
0620-2050 J Each 4.0000 N
THRIE-BEAM GUIDE RAIL TO PA 3-RAIL BRIDGE BARRIER WITHOUT CURB
0686-0001 X Each 18.0000 N
RIGHT-OF-WAY MONUMENTS
0686-0052 X Lump Sum 1.0000 N
CONSTRUCTION SURVEYING, TYPE D
0686-0054 X Lump Sum 1.0000 N
CONSTRUCTION SURVEYING, TYPE D
0686-0060 X Lump Sum 1.0000 N
CONSTRUCTION SURVEYING, TYPE D, MODIFIED
0689-0003 X Lump Sum 1.0000 N
CPM SCHEDULE
0690-0001 X Dollar 1,000.0000 $1.00 Y
INTERNAL FACILITATION
0802-0001 C1, M Cubic Yard 210.0000 N
TOPSOIL FURNISHED AND PLACED
0804-0025 M3 Pound 44.0000 N
SEEDING AND SOIL SUPPLEMENTS - FORMULA B RESIDENTIAL MIX, INCLUDING MULCH
0804-0026 M3 Pound 16.0000 N
SEEDING AND SOIL SUPPLEMENTS - FORMULA C CONSERVATION MIX, INCLUDING MULCH
0804-0027 M3 Pound 58.0000 N
SEEDING AND SOIL SUPPLEMENTS - FORMULA L CLEAR ZONE MIX, INCLUDING MULCH
0804-0032 M3 Pound 20.0000 N
SEEDING - FORMULA T TEMPORARY GRASS MIX, INCLUDING MULCH
0804-0033 M3 Pound 2.0000 N SEEDING AND SOIL SUPPLEMENTS - FORMULA W WETLAND CONSERVATION MIX, INCLUDING MULCH
0806-0112 M2 Square Yard 406.0000 N
TEMPORARY SHORT-TERM, ROLLED EROSION CONTROL PRODUCT, TYPE 2C
0806-0113 M2 Square Yard 1,869.0000 N
TEMPORARY SHORT-TERM, ROLLED EROSION CONTROL PRODUCT, TYPE 2D
0806-0140 M2 Square Yard 2.0000 N
PERMANENT ROLLED EROSION CONTROL PRODUCT, TYPE 5A
0810-0052 A, M1 Each 1.0000 N
SELECTIVE TREE REMOVAL
0810-0054 A, M1 Each 6.0000 N
SELECTIVE TREE REMOVAL
July 16, 2026 14:35:12 PM Page 9 of 95
0811-0003 J2, M Linear Foot 627.0000 N
TEMPORARY PROTECTIVE FENCE
0845-0001 M2 Dollar 30,000.0000 $1.00 Y
UNFORESEEN WATER POLLUTION CONTROL
0849-0010 C1 Each 2.0000 N
ROCK CONSTRUCTION ENTRANCE
0849-0020 C1 Each 2.0000 N
ROCK CONSTRUCTION ENTRANCE WITH WASH RACK
4850-0031 C1 Cubic Yard 13.0000 N Proj
ROCK, CLASS R-3 CHOKED WITH #57 COARSE AGGREGATE
0850-0035 C1 Cubic Yard 39.0000 N
ROCK, CLASS R-7
0855-0003 M2 Each 3.0000 N
PUMPED WATER FILTER BAG
0855-0004 M2 Each 3.0000 N
REPLACEMENT PUMPED WATER FILTER BAG
0856-0001 C1 Each 1.0000 N
REMOVAL SEDIMENT AND ROCK BARRIER
0860-0000 M2 Each 1.0000 N
INLET FILTER BAG FOR TYPE M INLET
4866-0005 M2 Linear Foot 508.0000 N Proj
HEAVY DUTY SILT BARRIER FENCE WITH TEMPORARY PROTECTIVE FENCE MATERIAL
0867-0012 M2 Linear Foot 664.0000 N
COMPOST FILTER SOCK, 12" DIAMETER
0867-0018 M2 Linear Foot 350.0000 N
COMPOST FILTER SOCK, 18" DIAMETER
0901-0001 Q Lump Sum 1.0000 N Proj
MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION
0901-0002 Q Lump Sum 1.0000 N Proj
0901-0004 Q Lump Sum 1.0000 N Proj
0901-0231 Q Day 200.0000 N
ADDITIONAL WARNING LIGHTS, TYPE B
0901-0240 Q, R Square Foot 200.0000 N
ADDITIONAL TRAFFIC CONTROL SIGNS
0931-0001 R Square Foot 87.0000 N
POST MOUNTED SIGNS, TYPE B
July 16, 2026 14:35:12 PM Page 10 of 95
0935-0001 R Square Foot 25.0000 N
POST MOUNTED SIGNS, TYPE F
0937-0106 J, R Each 20.0000 N
GUIDE RAIL MOUNTED DELINEATOR TYPE B, (W/B)
0937-0113 J, R Each 20.0000 N
GUIDE RAIL MOUNTED DELINEATOR TYPE D, (W/B)
0937-0303 R Each 1.0000 N
FLEXIBLE DELINEATOR POST, SURFACE-MOUNT TYPE SM-1, RED POST WITH WHITE SHEETING
0937-0323 R Each 8.0000 N
FLEXIBLE DELINEATOR POST, GROUND-MOUNT TYPE GM-1, RED POST WITH WHITE SHEETING
0962-1000 O Linear Foot 2,354.0000 N
4" WHITE WATERBORNE PAVEMENT MARKINGS
0962-1005 O Linear Foot 2,352.0000 N
4" YELLOW WATERBORNE PAVEMENT MARKINGS
0971-0001 R Each 13.0000 N
REMOVE POST MOUNTED SIGNS, TYPE B
0975-0001 R Each 2.0000 N
REMOVE POST MOUNTED SIGNS, TYPE F
1018-0002 T1 Lump Sum 1.0000 N Proj
REMOVAL OF EXISTING BRIDGE
1018-0004 T1 Lump Sum 1.0000 N Proj
REMOVAL OF EXISTING BRIDGE
1018-0061 C1, T1 Lump Sum 1.0000 N Proj
REMOVAL OF EXISTING CULVERT
E 8510-0001 S4 Lump Sum 1.0000 N Std
PRECAST CONCRETE BOX CULVERT, AS DESIGNED, S-41241
A 1002-0191 S7 Pound 3,433.0000 N
REINFORCEMENT BARS, EPOXY COATED
A 1019-0050 K2 Square Yard 64.0000 N
PROTECTIVE COATING FOR REINFORCED CONCRETE SURFACES (PENETRATING SEALERS, BRIDGE
SUPERSTRUCTURE)
A 9000-0220 C1 Cubic Yard 11.0000 N Proj
OVEREXCAVATION AND BACKFILLING UNDER FOUNDATIONS
A 9000-0852 C1 Cubic Yard 22.0000 N Proj
STOCKPILING AND PLACEMENT OF STREAMBED MATERIAL AT CULVERT
O 8510-0011 S4 Lump Sum 1.0000 N Std
PRECAST CONCRETE BOX CULVERT
July 16, 2026 14:35:12 PM Page 11 of 95
O 8520-0001 S4 Lump Sum 1.0000 N Std
CAST-IN-PLACE BOX CULVERT
E 8510-0002 S4 Lump Sum 1.0000 N Std
PRECAST REINFORCED CONCRETE BOX CULVERT, AS DESIGNED, S-42737
A 4850-0035 C1 Cubic Yard 43.0000 N Proj
ROCK, CLASS R-7 , GROUTED
A 1001-0980 G4, S9 Square Yard 41.0000 N
MECHANICAL TEXTURING WITH LONGITUDINAL SAWED GROOVES
A 1002-0143 S7 Each 12.0000 N
MECHANICAL SPLICE SYSTEM FOR NO. 6 REINFORCEMENT BARS, EPOXY COATED
A 1002-0145 S7 Each 24.0000 N
MECHANICAL SPLICE SYSTEM FOR NO. 4 REINFORCEMENT BARS, EPOXY COATED
A 1002-0192 S7 Pound 3,140.0000 N
REINFORCEMENT BARS, EPOXY COATED
A 1019-0050 K2 Square Yard 50.0000 N
PROTECTIVE COATING FOR REINFORCED CONCRETE SURFACES (PENETRATING SEALERS, BRIDGE
SUPERSTRUCTURE)
A 9000-0221 C1 Cubic Yard 8.0000 N Proj
OVEREXCAVATION AND BACKFILLING UNDER FOUNDATIONS
A 9000-0851 C1 Cubic Yard 20.0000 N Proj
STOCKPILING AND PLACEMENT OF STREAMBED MATERIAL AT CULVERT
O 8510-0012 S4 Lump Sum 1.0000 N Std
PRECAST CONCRETE BOX CULVERT
O 8520-0002 S4 Lump Sum 1.0000 N Std
CAST-IN-PLACE REINFORCED CONCRETE BOX CULVERT
9000-0100 S4 Lump Sum 1.0000 N Proj
PRECAST REINFORCED CONCRETE BOX CULVERT
9000-0350 F Lump Sum 1.0000 N Proj
TEMPORARY DRIVEWAY
9000-0410 F Square Yard 38.0000 N Proj
ASPHALT DRIVEWAY ADJUSTMENT
9000-0500 X Dollar 25,000.0000 $1.00 Y Proj
UNFORSEEN ROADWAY REPAIRS
9000-0842 X Dollar 15,000.0000 $1.00 Y Proj
RECOGNIZED QUALIFIED BOG TURTLE SURVEYOR
9000-1908 M2 Linear Foot 26.0000 N Proj
TEMPORARY COFFERDAM
9000-1910 M2 Each 2.0000 N Proj
TEMPORARY COFFERDAM AND PUMP BYPASS SYSTEMS
July 16, 2026 14:35:12 PM Page 12 of 95
9000-1913 M2 Lump Sum 1.0000 N Proj
TEMPORARY PUMP BYPASS SYSTEM
9000-5101 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION AGGREGRATE
9000-5103 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION CONCRETE
July 16, 2026 14:35:12 PM Page 13 of 95
SPECIAL PROVISIONS
Special Provision: G51A - a00051 APPLICABLE DESIGNATED SPECIAL PROVISIONS (STATE) Addendum:
Action:
Item(s) Associated:
Header:
APPLICABLE DESIGNATED SPECIAL PROVISIONS (STATE)
Provision Body:
APPLICABLE DESIGNATED SPECIAL PROVISIONS. The following Designated Special Provisions are found in Appendix C and apply to this bid proposal.
DSP4. Diverse Business (DB) Requirements for Non-Federally Funded Construction Projects.
DSP9. Special Supplement - Anti-Pollution Measures - August 26, 1999.
DSP15. Commonwealth Standard Terms and Conditions.
Project Specific Details:
Special Provision: G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW Addendum:
CONTRACT PROVISIONS - RIGHT TO KNOW LAW
Provision Body:
I. Contract Provisions – Right to Know Law 8-K-1532
a. The Pennsylvania Right-to-Know Law (RTKL), 65 P.S. §§ 67.101-3104, applies to this Contract.
b. If the Department needs assistance in any matter arising out of the RTKL related to this Contract, the Department will notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Department.
c. Upon written notification from the Department that it requires assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor will:
July 16, 2026 14:35:12 PM Page 14 of 95
1. Provide the Department, within 10 calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Department reasonably believes is Requested Information and may be a public record under the RTKL; and
2. Provide such other assistance as the Department may reasonably request, in order to comply with the RTKL with respect to this Contract.
d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, notify the Department and provide, within 7 calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.
e. The Department will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Department determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Department determine that the Requested Information is clearly not exempt from disclosure, provide the Requested Information within 7 calendar days of receipt of written notification of the Department’s determination.
f. Failing to provide the Requested Information within the time period required by these provisions, indemnify and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of this failure, including any statutory damages assessed against the Department.
g. The Department will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.
h. The Contractor may file a legal challenge to any Department decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, indemnify the Department for any legal expenses incurred by the Department as a result of such a challenge and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of the failure, including any statutory damages assessed against the Department, regardless of the outcome of such legal challenge. As between the parties, agree to waive all rights or remedies that may be available as a result of the Department’s disclosure of Requested information pursuant to the RTKL.
i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and continue as long as the Requested Information remains in the Contractor's possession.
Special Provision: C164A - a00164 CHANGES TO SPECIFICATIONS: SECTION 106
CHANGES TO SPECIFICATIONS: SECTION 106
Provision Body:
SECTION 106—CONTROL OF MATERIAL
106.10(a) Buy America Provisions. Revise last paragraph to read as follows:
Products manufactured of foreign steel or iron materials may be used, provided the cumulative cost of such products as they are delivered to the project does not exceed 0.1% of the total contract amount, or $2,500, whichever is greater.
July 16, 2026 14:35:12 PM Page 15 of 95
Add 106.11 BUILD AMERICA, BUY AMERICA ACT PROVISIONS.
106.11 BUILD AMERICA, BUY AMERICA ACT PROVISIONS—
(a) Build America, Buy America Act. The Federal Bipartisan Infrastructure Law (Public Law 117-58) includes the Build America, Buy America Act that requires all iron, steel, manufactured products, and construction materials used to be produced in the United States.
The term produced in the United States defined as:
1. Iron or Steel Products. All manufacturing processes from the initial melting stage through the application of coatings occurred in the United States according to Section 106.10(a).
2. Manufactured Product. Final assembly of all manufactured products permanently incorporated into the project must be manufactured in the United States.
2.a A manufactured product, not predominantly steel or iron, is defined as an article, material, or supply that has been processed into a specific form and shape, or combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies.
2.b Predominantly steel or iron is defined as greater than or equal to 50 percent of the total cost of the manufactured product.
2.c Manufactured products that are predominantly steel or iron must comply with Buy America provisions according to Section 106.10(a).
2.d If an article, material, or supply meets this definition but could also be classified as an excluded material or other product category, that article, material, or supply is not a manufactured product.
2.e Mixtures of excluded materials delivered to a work site without final form for incorporation into a project are also not manufactured products.
2.f Manufactured products where the final assembly did not occur in the United States may be used, provided the cumulative cost of such manufactured products is no more than the lesser of $1 million or 5% of total applicable costs for the project.
3. Construction Materials.
3.a All manufacturing processes for construction materials occurred in the United States.
3.b Construction materials includes an article, material, or supply that is or consists primarily of:
non-ferrous metals, plastic and polymer-based products including polyvinylchloride, composite building materials, and polymers used in fiber optic cables, glass including optic glass, lumber, or drywall
Items that consist of two or more of the listed materials that have been combined together through a manufacturing process, and items that include at least one of the listed materials combined with a material that is not listed through a manufacturing process, should be treated as manufactured products, rather than as construction materials.
3.c Limitation with Respect to Aggregates. Shall not include cement and cementitious materials, aggregates such as stone, sand, or gravel, or aggregate binding agents or additives.
3.d Construction materials where all manufacturing processes did not occur in the United States may be used, provided the cumulative cost of such construction materials is no more than the lesser of $1 million of 5% of total applicable costs for the project.
July 16, 2026 14:35:12 PM Page 16 of 95
Special Provision: C166A - a00166 CHANGES TO SPECIFICATIONS: SECTIONS 107 AND 608
CHANGE TO SPECIFICATIONS: SECTIONS 107, AND 608
Provision Body:
SECTION 107—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS. Revise to read as follows:
107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS—Install and maintain erosion and sediment (E&S) pollution control devices as indicated or submit an alternate plan for accomplishing equal or better temporary and permanent erosion and water pollution control. If an alternate plan is submitted, do not start work until the plan is approved by the County Conservation District and the Department. If a National Pollutant Discharge Elimination System (NPDES) Permit is involved, do not start work until the plan is approved by the DEP or the authorized County Conservation District and the Department. Concrete clean out areas, either contractor designed or indicated within the contract documents, are incidental to the contract items.
When a general or individual NPDES Permit is involved:
At the preconstruction conference, submit a Preparedness, Prevention and Contingency (PPC) Plan and identify a licensed professional (Professional Engineer, Geologist, Land Surveyor or Landscape Architect) registered in the Commonwealth and if applicable, their designee to be present onsite and responsible for implementing critical stages of the
Do not start earth disturbance activities until an environmental preconstruction meeting is held with DEP or delegated
CCD.
Within 14 days of completing the construction of a stormwater control measure (SCM) as determined by the licensed professional or designee, submit a completed Chapter 102 SCM Construction Certification Form for each SCM to the Representative through PPCC. Form CS-102 has information required to complete the Chapter 102 Form(s). Ensure the General Project and SCM Information, Construction Information, and Licensed Professional Certification sections are completed by the identified licensed professional responsible for overseeing the critical stages of the approved PCSM plan.
Prepare an as-built (record) PCSM Plan to be sealed and signed by the identified licensed professional registered in the Commonwealth. All construction survey, plan preparation, and engineering required for the as-built (record) PCSM Plan will be incidental to the contract items. The as-built (record) PCSM Plan must accurately reflect deviations from the approved PCSM Plan including, but not limited to, plan locations, dimensions, inverts/elevations, materials used and grading. Update the as-built (record) PCSM Plan as construction of the project’s PCSM features progresses. Have the identified licensed professional immediately notify the Representative of all deviations from the approved PCSM Plan. Deviations to the approved PCSM Plan must be submitted for approval. Assist with the determination and documentation if the as-built deviations require a permit amendment or if the PCSM features must be removed and replaced as indicated on the PCSM Plan.
Assist the Representative in performing visual site inspections weekly and after each precipitation event greater than 0.25 inches to ensure the project's E&S Best Management Practices (BMPs) are functioning properly. Immediately initiate corrective actions, at no additional cost to the Department, upon notification by the Representative of noncompliance with the provisions of this section that the Representative has determined requires immediate corrective action under Department policies. For all other notifications of noncompliance, initiate corrective actions within 24 hours. Failure or refusal to promptly comply with such notice upon receipt may, at the Department’s sole discretion, result in: the withholding payment of estimates for work completed until the requirements of the E&S Plan are met, assessment of E&S noncompliance liquidated damages as specified in Section 108.07(d) or issuance of a written order approved Post Construction Stormwater Management (PCSM) Plan.
July 16, 2026 14:35:12 PM Page 17 of 95 stopping all or part of the work until the corrective action has been taken and the requirements of the E&S Plan are met. No claims for extension of time, costs, or damages arising from, related to, or based upon such notices of noncompliance or stop orders will be granted, paid, or considered.
Nothing in this Section is to be interpreted to relieve the Contractor of its obligation to fully and timely comply with all applicable laws and any permits for the project. The time periods set forth in this Section do not supersede any more stringent time periods required by applicable laws or permits for the project.
If corrective action or noncompliance with the provisions of this Section result from design errors/omissions or a precipitation event exceeding the design storm criteria as specified in applicable Department publications; the cost and/or time required for the performance of the corrective actions for noncompliance notices or stop work orders will be considered as specified in Section 110.03 and Section 108.06, as applicable.
Utilize Department, DEP, or other authorized agency’s form(s) included in the contract or project permits unless directed otherwise by the Representative, DEP, the County Conservation District or other authorized regulatory agency.
For the purpose of determining compliance with the provisions of this section, “substantial completion” will be considered to have been attained when all of the following project milestones have been reached:
Either a semi-final or final inspection has been performed, physical work is complete, and an Environmental Commitments and Mitigation Tracking System (ECMTS) Sheet has been executed if applicable to the project.
Earth disturbance activity has been permanently stabilized and sufficient vegetative growth has been achieved to meet permit conditions (uniform 70% perennial vegetative cover) and agreed to by DEP or delegated CCD.
Installation of PCSM SCMs have occurred if applicable. Upon completion of PCSM conversions and facilities, the County Conservation District must approve the removal of all remaining E&S BMPs.
Once a project with a general or individual NPDES Permit has reached substantial completion, submit to the Representative a DEP Notice of Termination (NOT) Form ensuring Sections 2, 3, 4, 7 and 8, are fully executed. The NOT is to be accompanied by the required as-built (record) PCSM Plan, the final certification by the licensed professional and the Contractor’s executed portion of the ECMTS Construction Tracking Signature Sheet.
608 MOBILIZATION
Section 608.4(b)3. Revise to read as follows:
3. When all physical work has been satisfactorily completed and the following certificates and documents, as required, have been properly furnished, the final payment will be made as specified in Section 608.4(a):
Certified Payroll Records
Final DBE/DB payment amounts and, if necessary, shortfall justification
Material Certifications
Form CS-4225H, Highway Lighting In-Service Guarantee Notification
As built drawings for Design/Build projects
Form RW-397A, Right to Enter (a property) and Release Form from property owner, if applicable
Form CS-4345, Borrow and/or Waste Management
Contractor Evaluations of the design of the project; and
Work Order Information (i.e. Force Account documentation)
Post Construction Stormwater Management As-built drawings and all documentation required for submission of the Notice of Termination for projects with NPDES permits.
July 16, 2026 14:35:12 PM Page 18 of 95
Special Provision: C167A - a00167 CHANGES TO SPECIFICATIONS: APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
Addendum:
CHANGES TO SPECIFICATIONS : APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
Provision Body:
APPENDIX C—DESIGNATED SPECIAL PROVISIONS. Revise to read as follows:
APPENDIX C
DESIGNATED SPECIAL PROVISIONS
General: This appendix to Publication 408 contains standard required provisions. The Contractor shall comply with the below appendices, as applicable.
Standard Documents: Designated Special Provisions (DSPs) that are referenced in this Appendix are:
DSP4. Diverse Business (DB) Requirements for Non-Federally Funded Construction Projects. This provision is applicable to contracts funded with state funds, without federal funds.
DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects. This provision is applicable to any Federally-funded (in part or whole) contract for a construction project.
DSP8. F. A. R.—Required Contract Provisions Federal-Aid Construction Contracts – FHWA-1273 (Revised October 23, 2023). See attachments to the Proposal. This provision is applicable to any federally funded (in part or whole) contract for a construction project.
DSP9. Special Supplement—Anti-Pollution Measures – August 26, 1999. This provision is applicable to all contracts.
DSP12. Executive Order 11246, with Appendices A and B. This provision is applicable to contracts with federal funds (in part or whole).
DSP13. Buy America. This provision is applicable to contracts with federal funds (in part or whole, and to state-funded projects when any federal funds were allocated at any phase of the work on the overall-project but not under the current contract (for example, design), even if the construction contract is 100% state-funded.
DSP15. Commonwealth Standard Terms and Conditions. This provision is applicable to all contracts.
DSP16. Lobbying Certification Form. This provision is applicable to contracts with federal funds and a contract amount $100,000 or greater. If applicable, the Contractor shall complete this form and return it to PennDOT during contract execution. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).
DSP17. Federal Audit Clause. This provision is applicable to contracts with federal funds. As used in this DSP, “[Name of Subrecipient]” refers to the Contractor.
DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances. This provision is applicable to contracts with federal funds. The Contractor’s signature on an agreement will be deemed a signature on this exhibit.
As used in this DSP, the term “Subrecipient” refers to the Contractor.
DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities. This provision is applicable to contracts with federal funds (in part or whole).
July 16, 2026 14:35:12 PM Page 19 of 95
• APPENDIX C—DESIGNATED SPECIAL PROVISION 20 (DSP20) FAR 52.240-1 - PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN ENTITIES (NOV 2024). Revise to read as follows:
APPENDIX C
DESIGNATED SPECIAL PROVISION 20 (DSP20)
FAR 52.240-1 -PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED
BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN ENTITIES (NOV 2024)
(a) Definitions. As used in this clause—
American Security Drone Act-covered foreign entity means an entity included on a list developed and maintained by the Federal Acquisition Security Council (FASC) and published in the System for Award Management (SAM) at https://www.sam.gov (section 1822 of the National Defense Authorization Act for Fiscal Year 2024, Pub. L. 118-31, 41 U.S.C. 3901 note prec.).
FASC-prohibited unmanned aircraft system means an unmanned aircraft system manufactured or assembled by an American Security Drone Act-covered foreign entity.
Unmanned aircraft means an aircraft that is operated without the possibility of direct human intervention from within or on the aircraft (49 U.S.C. 44801(11)).
Unmanned aircraft system means an unmanned aircraft and associated elements (including communication links and the components that control the unmanned aircraft) that are required for the operator to operate safely and efficiently in the national airspace system (49 U.S.C. 44801(12)).
(b) Prohibition. The Contractor is prohibited from—
(1) Delivering any FASC-prohibited unmanned aircraft system, which includes unmanned aircraft (i.e., drones) and associated elements (sections 1823 and 1826 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.);
(2) On or after December 22, 2025, operating a FASC-prohibited unmanned aircraft system in the performance of the contract (section 1824 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.); and
(3) On or after December 22, 2025, using Federal funds for the procurement or operation of a FASC-prohibited unmanned aircraft system (section 1825 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.).
(c) Procedures. The Contractor shall search SAM at https://www.sam.gov for the FASC-maintained list of American Security Drone Act-covered foreign entities prior to proposing, or using in performance of the contract, any unmanned aircraft system. Additionally, the Contractor shall ensure any effort or expenditure associated with a FASC-prohibited unmanned aircraft system is consistent with a corresponding exemption, exception, or waiver determination expressly stated in the contract.
(d) Exemptions, exceptions, and waivers. The prohibitions in this clause do not apply where the agency has determined an exemption, exception, or waiver applies and the contract indicates that such a determination has been made. [See sections 1823 through 1825 and 1832 of Public Law 118-31 (41 U.S.C. 3901 note prec.) for statutory requirements pertaining to exemptions, exceptions, and waivers.].
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.
Special Provision: C168A - a00168 CHANGES TO SPECIFICATIONS: SECTIONS 110, 404, AND 507
July 16, 2026 14:35:12 PM Page 20 of 95
CHANGE TO SPECIFICATIONS: SECTIONS 110, 404, AND 507
Provision Body:
SECTION 110—PAYMENT
Section 110.06 MATERIAL STORED OR ON HAND. Revise to read as follows:
110.06 MATERIAL STORED OR ON HAND—
(a) Stored Material. The Representative may authorize payment for certain material, using Form CS-110, before its incorporation into the work. Upon the Contractor's request submitted through the PennDOT Project Collaboration Center’s (PPCC) Material-Stored Material (CS-110) workflow and the Representative's acceptance in PPCC, the Contractor may be paid 100% of the cost of the material, less the pro‑rata share of the retainage, if any; provided the quantity of stored material does not exceed the total estimated quantity required to complete the project and the cost is at least $1,000 but does not exceed 90% of the contract price of the applicable contract item or component item. Load-Transfer Units are only eligible for 90% of the cost of the material. The cost of the material is that amount to be paid by the Contractor as evidenced by invoices. Fabricated structural steel that is to receive a protective coating may be approved for prepayment at 75% of the contract price of the applicable contract item or component item, before application of the coating, provided the structure has been fully fabricated and preassembly of field connections has been made.
Payment for stored material will not be authorized until the material has been delivered to the project site or an approved location in the vicinity of the project, is inspected by the Representative to ensure the material is in a satisfactory condition and of sufficient quantity, is stored in an approved manner, and conforms to the requirements specified in this Section and Section 106.03. Identify stored material by project designation and set apart from other materials. Fabricated precast/prestressed bridge structure elements indicated on an S-number structure plan are eligible for prepayment when they are approved to ship. Other materials to be stored less than 30 days are not eligible for prepayment. In determining eligibility for prepayment, the beginning date for evaluating whether the required 30-day minimum storage period will be met will be the date the material is delivered to the project or approved storage location, or the date the invoice is submitted to the Department, whichever is the latter. Material originally determined to be ineligible for prepayment due to the minimum storage period requirement, that is then stored for more than 30 days, is eligible for prepayment on the next estimate, provided the invoice has been submitted to the Department. If the Representative determines, because of required fabrication at an off‑site location, that it is not feasible or practicable to store material in the vicinity of the project, the material may be stored at an approved location, which is not in the vicinity of the project, at the Contractor’s expense.
With the exception of structural steel to be incorporated into fabricated structural steel components for main bridge members, as specified in Section 110.06(a)1., only end product manufactured material or fully fabricated products that are awaiting installation and/ or incorporation into the finished work are eligible for prepayment. Ingredients of a finished product are not eligible for prepayment.
Aggregates, cements, and other bulk material are not eligible for prepayment. Beams containing precast components or secondary precast elements detailed on the structure component item schedule or both are eligible for prepayment. Living or perishable plant materials are not eligible for prepayment before planting.
Assume full control and responsibility for the protection of the stored material from the elements and against loss or damage by any cause. In the event any stored material becomes lost, stolen, impaired, or damaged while stored, the monetary value of the lost, stolen, impaired, or damaged material as may have been paid for in a current estimate will be deducted from a subsequent estimate.
Retain the title to the prepaid material until issuance of the acceptance certificate.
Payment for acceptable stored material will be made on current estimates against the applicable contract item. The amount paid will be proportionately recouped as the material is incorporated into the work. The cost of surplus stored material previously paid on a current estimate but not ultimately incorporated in the final measured work will not be included in the final payment. Surplus stored material is the property of the Contractor. Remove surplus material from the project and dispose of in a satisfactory manner.
Pay the material provider the amount due, as shown on the invoices within 7 calendar days of receipt of payment from the Department. Provide evidence of payment upon request. Failure to make invoice payments as specified will cause the appropriate monies to be deducted from future estimates and will cause the disapproval of further prepayment requests.
1. Prepayment for Structural Steel. Structural steel to be incorporated into fabricated structural steel components for main bridge members may be approved for payment up to 60% of the contract price of the applicable contract item or component item; provided the quantity, cost, delivery, inspection, and storage requirements of Section 110.06(a) are met. The cost of the structural steel is that amount to be paid by the Fabricator as evidenced by invoices. Invoices for approved structural steel are to include the material quantity and Department project identification (i.e., ECMS number, SR & Section, and county), and must be accompanied by
July 16, 2026 14:35:12 PM Page 21 of 95 certification, as specified in Section 106.03(b)3., and proof of payment (e.g., a copy of a canceled check or receipt, or a certified letter from the structural steel supplier acknowledging receipt of payment).
Payment for approved structural steel will be made on current estimates against the applicable contract item. The amount paid will be proportionately recouped as the fabricated structural steel components are incorporated into the work. Pay the Fabricator the amount due, as shown on the invoices, within 7 calendar days of receipt of payment from the Department. When payment is made, the structural steel becomes the property of the Department. Have the Fabricator furnish a transfer of ownership document within 7 calendar days of receipt of payment and promptly submit the documentation to the Department.
Only approved structural steel to be incorporated into fabricated structural steel components for main bridge members is eligible for prepayment. Handling, transportation, and storage of structural steel materials including, but not limited to, any storage site rental, security, and weather protection, are to be borne by the Contractor and included in the contract price for the applicable contract item.
SECTION 404—EVALUATION OF ASPHALT PAVEMENT RIDE QUALITY AND PAYMENT OF INCENTIVE
Section 404.1 DESCRIPTION. Revise to read as follows:
404.1 DESCRIPTION. This work evaluates an asphalt pavement surface profile and determines the ride-quality incentive associated with the pavement surface profile.
(a) General Requirements. Determine the ride quality of finished pavement surfaces, including overlaid bridge approach slabs and overlaid bridge decks. At least two of the following construction operations must be indicated in areas included in ride-quality lot measurements:
Profile milling as specified in Section 492.
Asphalt Base course.
Asphalt Scratch course.
Asphalt Leveling course.
Asphalt Binder course.
Asphalt Wearing course.
In the presence of the Representative, measure the pavement surface profile according to PTM No. 428. Provide daily calibration results to the Representative before taking any measurements. Provide the raw unfiltered data files and a summary printout of the resultant International Roughness Index (IRI) data and Mean Roughness Index (MRI) values to the Representative within 24 hours of taking measurements. The Representative will determine payment for each ride-quality lot based on the MRI.
Measure the pavement surface of the following excluded areas separate from the pavement surface profile of ride-quality lots. The Representative will not include measurements from excluded areas to determine lot incentive payment.
Pavement surfaces not constructed as a full-depth overlay, as indicated, such as the vertical transition areas at the limits of paving and at the approaches to bridges.
Bridge decks unless overlaid.
Ramps less than 1,500 feet in length and less than 12 feet wide.
Tapered pavements.
Shoulders, medians, and other pavement surfaces indicated.
Pavement from 5 feet before and up to 5 feet after any appurtenances such as water boxes, manholes, railroad tracks, and inlets extending out into the pavement.
Partial lots less than 100 feet
Roadways with a posted speed limit of 40 miles per hour or lower.
(b) Lot Size. A full lot is 528 feet of a single pavement lane. The Representative will designate lots starting at the beginning limit of paving and continuing to the ending limit of paving for each pavement lane and ramp that is 12 feet or wider. Do not include the length of excluded areas in the 528-foot lot.
July 16, 2026 14:35:12 PM Page 22 of 95
The Representative will designate a partial lot at the ending limit of paving and at an excluded area, when the lot length is less than 528 feet. The Representative will evaluate a partial lot as a percentage of a full lot.
Section 404.3(a) Equipment and Operator. Revise to read as follows:
(a) Equipment and Operator. Provide pavement surface profile measuring equipment that has been verified by the Department according to PTM No. 428. In the presence of the Representative, calibrate the distance sensor and check the profile system calibration before each day’s testing.
Provide an operator that is Department certified according to PTM No. 428. The operator must carry their valid PennDOT certification card during pavement surface profiling.
Section 404.3(b) Testing. Revise to read as follows:
(b) Testing.
1. Lots. Provide the traffic control and station marking necessary to accommodate testing. Remove objects and equipment from the surface and sweep the surface as necessary to remove debris. For projects identified for verification as specified in Section 404.3(f), identify and delineate the profiling limits and excluded areas on the day of the verification. The Representative will verify the profiling limits are correct. Use traffic cones with reflective tape and reflective tape on the pavement at the beginning and end of each lane and excluded areas for triggering the start and stop locations of the profiler. In the presence of the Representative, determine the pavement surface profile for each lot according to PTM No. 428. At the completion of testing, immediately submit the lot IRI data and MRI values, according to PTM No. 428, to the Representative.
2. Excluded Areas. Provide the traffic control necessary to accommodate testing. Test the entire surface of each excluded area in stages using a 12-foot straightedge. At each stage, hold the straightedge in contact with the surface and parallel to the roadway centerline and, in successive positions, test the pavement surface profile from one side of the excluded area to the other. Advance the test location to the next stage by moving the straightedge along the roadway centerline not more than 6 feet.
Section 404.3(c)1. Lots. Revise to read as follows:
1. Lots. The Representative will compare the lot MRI to Table A in Section 404.4 to determine if the lot requires corrective action.
Additionally, perform corrective action on any individual bump (must grind) where the irregularity is more than 3/16 inch when tested with a 12-foot straightedge.
Section 404.3(d) Corrective Action. Revise to read as follows:
(d) Corrective Action. Do not produce a deviation, such as a ridge or valley with the adjacent pavement, of more than 1/8 inch when measured on the transverse profile.