This file is a Questions and Answers document for the IE4 Power Installation Request for Information (RFI) issued by the Defense Information Systems Agency (DISA). The document addresses industry inquiries regarding the government's procurement approach for comprehensive site power installation services supporting the Defense Information Systems Network (DISN) Global Enterprise and the Department of War Teleport Program Office.
The government anticipates awarding a single prime contractor responsible for the entire global power installation requirement, with individual task orders for separate locations permissible. While small businesses may participate as sub-vendors addressing specific portions of work such as site surveys, mobilization, installation coordination, material logistics, or decommissioning, responses must address the entire RFI requirement to be considered. Security and facility clearance requirements will be determined on a site-by-site basis rather than applied uniformly across the global requirement. The RFI scope is limited to site power installation actions and does not encompass a full installation and implementation scope of work; therefore, responses should focus on the complete power installation services rather than defined supporting-power packages alone. The RFI response date was updated to November 5, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IE4_Power_RFI_Document_Final_10.8.2026.docx | DOCX document | |
| IE4_Power_RFI_Document_Final_10.8.2026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A
| Questions/Comments/Recommendations | Responses |
| Does DISA anticipate a single comprehensive prime contractor responsible for the global requirement, or a structure permitting individual task orders or regional assignments? | Government is anticipating a signle prime vendor to provide power installation services for the entire DISN Global Enterprise. Individual task orders for sperate locations are acceptable. |
| Would the Government find value in responses from small businesses addressing specific portions of the requirement, such as site surveys, mobilization, installation coordination, material logistics, or decommissioning, rather than the complete technical scope? | Yes, the government welcomes sub-vendors; however the objective is to review solicitations and responses addressing the entire RFI requirement. |
| Are facility clearance requirements expected to apply uniformly across the requirement, or will security and access requirements be determined by individual sites and assignments? | Site security and access requirements will be based on individual sites and assignments. |
| Would a response focused on a defined supporting-power package be useful for this RFI, or should that contribution be made only through a team covering the full installation and implementation scope? | This RFI is specifically for site power installation action vs a full installation and implementation scope of work. |