832674426-Post-Site Survey Q and A Final.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Flooring Tile Epoxy Application Services
- Solicitation number
- 832674426
- Issued by
-
Defense Information Systems Agency
About this file
This is a Post-Site Survey Questions and Answers document that addresses contractor inquiries related to solicitation 832674426 for flooring tile epoxy application services at Letterkenny Army Depot in Chambersburg, Pennsylvania. The document serves as a supplementary reference guide providing clarifications on project specifications and requirements discussed during the mandatory site visit. Rather than presenting specific products or services pricing, response dates, or award information, this Q&A document focuses on clarifying technical and administrative details that contractors must understand to develop accurate proposals for the approximately 900 square feet of polymer resin tiling application in the DISA facility break room. The polymer resin material must possess abrasion, slip, and stain-resistant properties to withstand spills, scratches, and other typical break room hazards. The labor category applicable to this effort is 23760 Painter, Maintenance, with wages and benefits determined by SCA WD 2015-4245 revision 31 for York County, Pennsylvania.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC102826R0038002.pdf | ||
| HC102826R0038001.pdf | ||
| Attachment 4-QASP.docx | DOCX document | |
| Attachment 2-Break Room Diagram.pdf | ||
| HC102826R0038.pdf | ||
| Attachment 3-CDRL A001.pdf | ||
| Attachment 1-EPL.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 832674426-Flooring Epoxy-Post Site Survey Questions and Answers (Q&A)
| Contractor Questions | Government Answers | |
| 1 | The PWS and CLIN identify approximately 900 SF, but the drawing appears to be closer to approximately 610 SF. Please confirm the correct square footage to be priced. | Actual SF is closer to 800-900 SF. (NOTE: This is why we had the site visit. I don’t remember this entity coming by. We only had two vendors visit when the window was open. |
| 2 | Please confirm whether the scope includes removal and replacement of any wall/cove base. If yes, please provide the required base type and height. | Base board will not be factored in. |
File details come from the government source that posted it. Updated .