This is a Request for Proposal (RFP) document issued by the Fort Pierce Utilities Authority for turnkey predesigned blast wall enclosure installation services. The agency seeks qualified, licensed, and insured contractors to design and construct two independent blast wall enclosures for fuel tank protection at the Energy Services Center located at 1701 South 37th Street, Fort Pierce, Florida 34947. The project scope includes one enclosure for above-ground gasoline/diesel fuel tanks and one for a liquefied natural gas fueling station tank, along with comprehensive hazard modeling (blast, thermal, and dispersion analysis), structural and civil design, permitting and regulatory submittals, construction, commissioning, and system turnover. The RFP was broadcast on June 22, 2026, with proposals due on August 11, 2026, at 11:00 AM EDT. A non-mandatory pre-proposal conference and site visit is scheduled for Tuesday, July 7, 2026, at 8:30 AM EST at the Energy Services Center. The project has an anticipated completion date of March 1, 2027.
All work must comply with federal, state, and local standards including HUD environmental review conditions, 24 CFR Part 51 Subpart C, HUD Barrier Design Guide 6600.G, NFPA 30, NFPA 59A, UFC, API RP 752/753, and Florida Building Code wind-borne debris requirements. The commodity codes associated with this procurement include wall ties and rafters, ballistic and break-resistant laminates, concrete bunker panels, and precast concrete products. Six planholders have registered for the bid, including DiPompeo Construction Corporation, Paul Jacquin & Sons Inc., RF Concrete Construction Inc., and SGM Engineering Inc. No bid bond or performance bond information is specified in the available documentation, and blueprints have not been distributed with the bid package.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6/23/26, 10:34 AMSOUTH SEWALL’S POINT RIO VISTA SUBDIVISION PRIVATE LOT GRAVITY SEWER LINE CONNECTION SERVICES - DemandStar
Page 1 of 3https://www.demandstar.com/app/suppliers/bids/537862/details
Bid Details Planholders Similar Bids Required Actions
Active
! Download Bid Package " Watch
Bid Details
Agency Name Fort Pierce Utilities Authority
Bid Writer Nancy Palka
Bid ID RFP-RFP26-15-0-2026/NJP
Bid Type RFP - Request for Proposal
Broadcast Date Jun 22, 2026 5:00pm (EDT)
Fiscal Year 2026
Due Aug 11, 2026 11:00am (EDT)
Bid Status Text None
Additional Registration
(NEW)
NONE
Scope of Work
1. BACKGROUND Fort Pierce Utilities Authority (FPUA) operates a critical above ground fuel infrastructure, including gasoline/diesel tanks and a liquefied natural gas (LNG)
Turnkey Predesigned Blast Wall Enclosure(s) Installation for Fuel Tank Protection at Energy Services Center (ESC)
View more #
Upgrade Subscription
Similar Bids (1)
RFQS # 6000001282…
Port Authority of NY & NJ, New York, NY
Planholders (6)
DiPompeo Construction Corporation
Dodge Data
Paul Jacquin & Sons, Inc.
RF Concrete Construction, Inc.
SGM Engineering, Inc.
https://www.demandstar.com/app/suppliers/bids/469664/details https://www.demandstar.com/app/subscription/renewal
6/23/26, 10:34 AMSOUTH SEWALL’S POINT RIO VISTA SUBDIVISION PRIVATE LOT GRAVITY SEWER LINE CONNECTION SERVICES - DemandStar
Page 2 of 3https://www.demandstar.com/app/suppliers/bids/537862/details
Show Less $ system. Assessments, internal studies, and coordination with stakeholders have confirmed that protective blast rated barriers are required to safeguard adjacent neighbors, nearby structures, and essential FPUA operational assets.
These requirements reference HUD environmental review conditions and Acceptable Separation Distance (ASD) criteria outlined in 24 CFR Part 51 Subpart C and the HUD
Barrier Design Guide 6600.G. FPUA seeks a single turnkey provider for hazard modeling, engineering, permitting, materials procurement, construction, commissioning, and closeout of two independent blast wall enclosures. 2.
OBJECTIVE OF PROPOSAL Fort Pierce Utilities Authority
(FPUA) is accepting proposals from qualified, licensed and insured contractors to provide a Turnkey Predesigned Blast
Wall Enclosure(s) Installation for Fuel Tank Protection at
Energy Services Center (ESC) located at 1701 South 37th
Street, Fort Pierce, Florida 34947. FPUA to select qualified contractor to deliver complete, design built, HUD compliant blast wall systems, including: • One enclosure for the above ground gasoline/diesel fuel tanks • One enclosure for the
Liquified Natural Gas (LNG) fueling station tank • Full hazard modeling (blast, thermal, dispersion) • Full structural and civil design • All permitting and regulatory submittals •
Complete construction, commissioning, and turnover of finished systems • FPUA anticipates an approximate project completion date of March 1, 2027. All work must meet or exceed current federal, state, and local standards, including
HUD, NFPA 30, NFPA 59A, UFC, API RP 752/753, and Florida
Building Code wind borne debris requirements.
Documents
% Download all documents
FilenameType File Type
File Size
Date Modified Status
R… Bid Document Specifications
PDF 1.30
MB
Jun 22, Complete
Distribution Info https://www.demandstar.com/app/suppliers/bids/537862/order
6/23/26, 10:34 AMSOUTH SEWALL’S POINT RIO VISTA SUBDIVISION PRIVATE LOT GRAVITY SEWER LINE CONNECTION SERVICES - DemandStar
Page 3 of 3https://www.demandstar.com/app/suppliers/bids/537862/details
Show More &
Bid Bond Performance Bond
Plan (blueprint) None eBidding No
Distributed By DemandStar
Distribution Method Download
Distribution Options Bid has no blueprints associated with it
Publications
St. Lucie News Tribune
View Legal Ad
Pre-Bid Conference
NON-MANDATORY Non-Mandatory Pre-Proposal Conference and Site-Visit Date:
Tuesday, July 7, 2026 at 8:30AM EST
Non-Mandatory Pre-Proposal Conference and Site-Visit Location:
Fort Pierce Utilities Authority
Energy Services Center - War Room
1701 South 37th Street
Fort Pierce, FL 34947
Commodity Code
[005-150-81] Ties, Wall and Ra!er, Not Concrete Form
[005-665-41] Laminates, Polycarbonate: Ballistic, Break- Resistant and Forced Entry Types
[013-210-17] Concrete Bunker Panels
[013-750-30] Concrete, Precast
[018-906-07] Architect Services, Professional, (Not Otherwise Classified), Including Consulting