This is an Invitation for Bids (IFB #161040) issued by the Virginia Department of Transportation (VDOT) Fredericksburg Residency for on-call pumping, hauling, and disposal services of wastewater and solid waste from chemical holding ponds and underground tanks. The work encompasses ten facility locations across Caroline, Spotsylvania, and Stafford Counties, including Area Headquarters and Material Lots. The contractor must provide pumping services for sodium chloride-contaminated water, sediment removal using jet-vac equipment, and proper disposal at authorized wastewater treatment facilities. An optional virtual pre-bid conference is scheduled for June 29, 2026, at 1:00 PM EST. Bids must be submitted electronically through eVA by July 14, 2026, at 10:00 AM EST, with a virtual public bid opening on July 15, 2026, at 10:00 AM EST. The contract runs for one year from the date of award and is renewable. The contractor must be capable of operating up to three commercial pump tanker trucks (minimum 5,000 gallons each) and one truck-mounted jet-vac sewer cleaner (minimum 6,000-gallon tank) simultaneously if needed, with four-hour equipment replacement requirements for breakdowns.

Bidding is open to all qualified firms, though the solicitation includes a small business subcontracting plan requirement for non-certified small businesses. Pricing shall be submitted on a per-gallon basis for water removal and hourly rates for sediment removal, with both rates including operator, fuel, mobilization, and disposal costs. Emergency mobilization fees of $500 per event apply for response within two hours, and night operations (8 PM to 5 AM) incur an additional $500 fee. Prevailing wage rates as determined by the Virginia Commissioner of Labor and Industry apply to all mechanics, laborers, and workers. The contractor must maintain minimum insurance coverage including workers' compensation, employer's liability of $100,000, commercial general liability of $1,000,000 per occurrence with the Commonwealth as additional insured, and automobile liability of $1,000,000 combined single limit. Payment is made within 30 days of invoice receipt and verification of work completion, with manifests and certificates of disposal required prior to payment. The contract includes standard Commonwealth terms regarding debarment, e-Verify participation for contractors with more than 50 employees on contracts exceeding $50,000, and eVA vendor transaction fees of 1 percent capped at $1,500 per order for non-certified small businesses.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative Services/Procurement Fredericksburg Residency Chemical Containment Pond Pumping

IFB #161040

1 | P a g e

Issue Date: 06/16/2026 INVITATION FOR BIDS IFB# 161040

Title: Chemical Containment Pond Pumping Commodity Code(s): 92645, 98808, 96871 Location Where Work Will Be Performed: Fredericksburg Residency

Issuing Agency: Commonwealth of Virginia Virginia Department of Transportation (VDOT) Contract Officer: Kristy Jeter Email: Kristy.Jeter@vdot.virginia.gov Phone: (540) 899-4237

NOTE TO BIDDERS

Prebid Conference: An Optional Virtual Pre-Bid Conference will be held at 1:00PM Eastern Standard Time (EST) on June 29, 2026. Refer to Solicitation Section V. for instructions on how to participate

Solicitation Closing Date and Time: 10:00AM EST on July 14, 2026. Refer to Solicitation Section VIII.1 for Instructions to Bidders.

Virtual Public Bid Opening Date and Time: 10:00AM EST on July 15, 2026. Refer to Solicitation Section VIII.2 for instructions on how to participate.

REMINDERS

1. Be sure to read and follow all instructions in the solicitation. Make certain bid pricing is not unbalanced.

2. Ensure all bid documents are completed and fillable attachments are uploaded with the bid submission. Bid documents and fillable attachments include, but may not be limited to:

A. VA STATE CORPORATION COMMISSION FORM

B. SMALL BUSINESS SUBCONTRACTING PLAN: A Small Business Subcontracting Plan (SBSP) is required for the bid to be considered responsive if the Bidder is not certified as a small business by the Department of Small Business and Supplier Diversity at the time of bid closing. Submit the SBSP on the included Attachment and provide plan value as a percentage not dollar value. See instructions under I. PURPOSE and Special Term and Condition: SBSP, Evidence of Compliance and Subcontractor Reporting.

C. VENDOR QUALIFICATION / EQUIPMENT INVENTORY CERTIFICATION FORM

D. SUBCONTRACTOR APPROVAL REQUEST

E. NORMAL AND EMERGENCY CONTACTS

F. REFERENCES

G. CONTRACTOR LICENSE REQUIREMENTS

H. DISPOSAL SITE OF WASTEWATER

I. VIRGINIA CODE RED OZONE DAYS

J. PREVAILING WAGE RATE DETERMINATION(S)

Note: This public body does not discriminate against faith-based organizations in accordance with the Code of Virginia, § 2.2-4343.1 or against a bidder because of race, religion, color, sex, national origin, age, disability, sexual orientation, gender identity, political affiliation, or veteran status or any other basis prohibited by state law relating to discrimination in employment. Faith-based organizations may request that the issuing agency not include subparagraph 1.f in General Terms and Condition C. Such a request shall be in writing and explain why an exception should be made in that invitation to bid.

mailto:Kristy.Jeter@vdot.virginia.gov

Chemical Containment Pond Pumping

2 | P a g e

TABLE OF CONTENTS

PAGE

I. PURPOSE 3

II. QUESTIONS REGARDING THIS INVITATION FOR BID 4

III. GENERAL DEFINITIONS 4

IV. SPECIFICATIONS 4

V. PRE-BID CONFERENCE 11

VI. METHOD FOR PAYMENT 11

VII. INVOICING 11

VIII. BIDDER’S INSTRUCTIONS AND PUBLIC BID OPENING 11

IX. GENERAL TERMS AND CONDITIONS 12

X. SPECIAL TERMS AND CONDITIONS 19

ATTACHMENTS

A. VA State Corporation Commission – Fillable Form

B. Small Business Subcontracting Plan (SBSP) – Fillable Form

C. Vendor Qualification / Equipment Inventory Certification – Fillable Form

D. Subcontractor Approval Request – Fillable Form

E. Normal and Emergency Contacts – Fillable Form

F. References – Fillable Form

G. Contractor License Requirements – Fillable Form

H. Disposal Site of Wastewater – Fillable Form

I. Virginia Code Red Ozone Days

J. Prevailing Wage Rate Determination(s)

REFERENCED TRAININGS

1. General Term and Condition C.1.(d): Link to Referenced Sexual Harassment Training

2. General Term and Condition CC: Link to VDOTU. Log in and search for “VDOT Workplace Civility Training https://www.dhrm.virginia.gov/public-interest/contractor-sexual-harassment-training https://virtualcampus.vdot.virginia.gov/

Chemical Containment Pond Pumping

3 | P a g e

I. PURPOSE:

The Virginia Department of Transportation (herein referred to as “VDOT”) is soliciting bids from qualified firms to provide on-call, as needed pumping, hauling and disposal of wastewater and solid waste (sludge) from chemical holding ponds and underground tanks located at the Area Headquarters within Caroline, Spotsylvania and Stafford Counties in the Fredericksburg District’s Fredericksburg Residency. The Contractor shall provide all labor, equipment and supervision to pump, haul and dispose of chloride-contaminated water and debris from holding ponds to an approved dump site described herein.

Stafford Area Headquarters 164 Wyche Road, Stafford, VA 22554

Eskimo Hill Material Lot 70 State Shop Road, Stafford, VA 22554

Falmouth Area Headquarters 1007 Thomas Lane, Fredericksburg, VA 22405

17 Material Lot (Back of Commuter Lot) 627 Warrenton Road, Fredericksburg, VA 22406

Chancellor Area Headquarters 12321 Corter Avenue, Fredericksburg, VA 22407

Massaponax Area Headquarters 8409 Patriot Hwy, Fredericksburg, VA 22408

Post Oak Area Headquarters 7219 Black Rock Drive, Spotsylvania Courthouse, VA 22551

Thornburg Training Academy 4926 Mudd Tavern Road, Woodford, VA 22580

Farmers Area Headquarters 13257 Fredericksburg Turnpike, Woodford, VA 22580

Port Royal Area Headquarters 25516 Tidewater Trail, Port Royal, VA 22535

Ladysmith Area Headquarters 20030 U.S. Route 1, Ruther Glen, VA 22546

Dawn Material Lot 31220 Camp Road, Dawn, VA 23069

PERIOD OF CONTRACT: From Date of Award through one (1) year. (renewable)

Reminder to Bidders: This solicitation includes the requirement for the Bidder to submit a Small Business Subcontracting Plan (SBSP) Attachment B with the electronic bid response in eVA. Bidders selecting the “I Plan To Complete All Work” box must be certified as a small/micro business by the Commonwealth of Virginia, Department of Small Business and Supplier Diversity (DSBSD) by the due date of this solicitation to participate in the SWaM Program.

Chemical Containment Pond Pumping

4 | P a g e

If the Bidder is not a DSBSD-certified small business, the “I Plan To Use Subcontractors” box must be selected and the Bidder shall identify on the SBSP attachment the portions of the contract that will be subcontracted to DSBSD-certified small business for the initial contract period and any subsequent renewal periods.

II. QUESTIONS REGARDING THIS INVITATION FOR BIDS:

Any questions regarding this invitation for bid shall be addressed to Kristy Jeter at Kristy.Jeter@vdot.virginia.gov. The issuing office shall determine whether any addendum should be issued as a result of any questions or other matters raised.

Provide questions no later than 5:00PM EST on July 7, 2026.

III. GENERAL DEFINITIONS:

For the purpose of clarification, each firm submitting a Bid is referred to as a “Bidder” and the Bidder awarded the contract to supply the services is referred to as a “Contractor.” Virginia Department of Transportation is referred to as “Commonwealth” or “Department” or as “VDOT,” and “Representative” refers to the VDOT Contract Administrator who will be administering the contract. This Invitation for Bids states the instructions for submitting bids, the procedure and criteria by which a contract may be awarded, and the contractual terms which will exclusively govern the contract between VDOT and the Contractor.

IV. SPECIFICATIONS:

Holding Ponds located at each of the Fredericksburg Residency Area Headquarters and Material Lots collect and hold sodium chloride contaminated water until proper disposal is arranged. Storm water run-off also collect in these ponds daily depending on precipitation events. Ponds are similar in size; approximately 30,000 – 40,000-gallon capacity, are generally made from asphalt and are located adjacent to salt storage buildings in order to prevent contamination of soils surrounding these lots. During winter and early spring months, the parts per thousand may be too high for disposal other than at an authorized wastewater treatment facility.

A. SCOPE OF WORK: The contractor shall furnish all qualified supervision, labor and equipment to pump, haul and dispose of wastewater from holding ponds at various locations throughout the Fredericksburg Residency.

1. Contractor’s Capacity to Perform: The Contractor shall provide suitable amounts of equipment and personnel to operate up to three (3) commercial pump tanker trucks and one (1) truck mounted jet/vacuum sewer cleaner, simultaneously, if needed. The Contractor shall have the capability to accurately meter the discharged water and provide manifests to VDOT of the gallons per discharge. The Contractor shall also be able to verify how many gallons are pumped from holding ponds prior to leaving the site and discharging at the wastewater treatment facility. The Contractor shall use a daily ticket that shall be signed off at the Area Headquarters; this shall be signed by VDOT Area Headquarters representative and Contractor representative.

A signed certificate of disposal certifying the proper disposal of wastewater, by the means of load tickets and/or manifest paperwork provided by the facility, must be given to the VDOT representative prior to any payments being made. No payments will be made until this documentation is received and approved.

2. Frequency of Wastewater Pumping: Pumping will be required when it is determined the holding ponds are at a certain level of salinity and/or have surpassed storage capacity. Total gallons pumped and frequency of pumping will vary per Area Headquarters and may depend on rainfall and frequency of snow removal operations. The Contractor may be required to pump all locations within a short time frame, or pumping may be very infrequent.

3. Handling of Collected Wastewater: All wastewater collected as a result of pumping operations shall be disposed of in accordance with all Federal, State and Local Laws and regulations.

• Testing of Wastewater: Should the Contractor’s disposal facility require testing of the material to be disposed, all testing and any costs incurred, shall be the responsibility of the Contractor.

mailto:Kristy.Jeter@vdot.virginia.gov

Chemical Containment Pond Pumping

5 | P a g e

• Transportation: Contractor shall comply with all HAZMAT regulations associated with the hauling and disposal of aqueous wastewater with high salt concentrations as required by the U.S.

Department of Transportation.

• Means of Disposal: Determining the proper disposal method and/or a location that meets the standards of all applicable governing laws/regulations for Chemical Pond/Tank wastewater shall be the responsibility of the Bidder/Contractor.

• Maximum Quantities: It is the responsibility of the Contractor to ensure that any maximum daily quantities or other limits associated with the wastewater is not exceeded.

4. Manifests: The Contractor shall provide a signed manifest form, with a signature from a representative of the disposal facility certifying the proper disposal of wastewater within all Federal, State and Local Law Regulations for each load disposed of and invoiced for. The completed manifests shall be submitted with each invoice before payment will be made. The manifest must indicate the permitted wastewater treatment facility name, date of disposal and total of gallons disposed.

5. Disposal of Wastewater: Location of disposal site is the responsibility of the Contractor and any additional haul charges will be considered incidental to the contract and included in the bid item. All wastewater collected from the holding ponds shall be transported and discharged by the Contractor at an authorized wastewater treatment facility. It is the responsibility of the Contractor to ensure that maximum daily quantities of discharged water at each plant are not exceeded. In case of exceeding these quantities, it shall be solely the Contractor's responsibility for payment of any additional charges. The Contractor will be responsible for certifying that the material has been properly disposed of by means of load tickets provided by the facility. The tickets must show where the wastewater was discharged and the total gallons per load.

The completed tickets must be submitted with each invoice before payment will be made. Any required applications or samples are the responsibility of the Contractor. Upon request, the Contractor shall supply any copies of tests performed i.e., specific gravity of water collected at site. Contractor shall be responsible for any cost or overhead associated with tests performed.

6. Disposal of Solid Waste/Sludge: All debris collected from performance of this contract is the responsibility of the Contractor. Debris shall be removed from the site and legally disposed of by the Contractor. Contractor shall be responsible for locating a legal disposal site for the proper disposal of all debris (regardless of the size) resulting from the operation. Disposal costs shall be included in hourly bid prices.

7. Handling of Collected Wastewater/Sludge: All wastewater collected as a result of pumping operations associated with deicing chemical ponds shall be disposed of in accordance with all State, Federal Environment Protection Agency (EPA) Laws and regulations.

8. Disposal Site for Wastewater: Bidders shall identify in their bid response on Attachment H the treatment facility/disposal site that will be utilized in disposal of holding pond wastewater. The Contractor shall report in writing any changes in treatment facility/disposal site prior to commencing any pumping services to verify the site is an authorized wastewater treatment / disposal site.

B. SPECIFICATIONS AND STANDARDS:

1. Standards: All work performed shall be in compliance with the applicable parts of the VDOT Road and

Bridge Specifications 2020 or latest edition.

2. Safety Standards, Rules and Regulations: The Contractor shall comply with Occupational Safety & Health Administration (OSHA) and Virginia Occupational Safety & Health (VOSH) standards. Additionally, the Contractor shall remain in compliance with all OSHA and VOSH personnel, equipment, and safety regulations. The Contractor shall ensure that all personnel and equipment comply with all OSHA and VOSH Standards as they apply to the work being done and not create any hazardous conditions with the equipment used. This includes but is not limited to, equipment having vehicular backup alarm systems and flashing lights and equipment that contains a roll-over protection system must be equipped with seat belts that shall

Chemical Containment Pond Pumping

6 | P a g e be worn by the occupants while in use. All Contractor supplied equipment, tools, and personal safety equipment shall meet or exceed the safety standards specified for such items by the American National Standards Institute Manual (ANSI Z133.1-1994). Refer to Special Terms and Conditions for Safety and Health Standards.

3. Contractor shall be in full compliance with all applicable Federal Motor Carrier Safety Administration requirements, laws and standards.

4. Contractor shall be in full compliance with all applicable Virginia State Inspection and Licensing requirements, laws and standards.

C. EQUIPMENT REQUIREMENTS:

1. The Contractor shall possess or have available, at time of bid closing, and throughout the term of the contract, the vehicles and equipment necessary to perform the work under the terms of this contract. Equipment shall be in good working order and capable of performing the work described herein.

2. Wastewater Removal Equipment: The Contractor shall provide a minimum of three (3) commercial pump tanker trucks with a holding capacity of not less than 5,000 gallons. The bidder shall be required to provide with their bid, the make, model and capacity of each piece of equipment, as noted in the Pricing Schedule.

Reference to the Attachment titled Vendor Qualification/Equipment Inventory Certification Form. A pre award meeting may be conducted to inspect all equipment and verify personnel requirements prior to posting the Notice of Intent to Award. No compensation will be given for this meeting The Contractor shall provide any accessories that are necessary to operate the needed equipment efficiently. This shall include, but is not limited to, all hand tools and safety supplies.

3. Sediment/Sludge Removal Equipment: The Contractor shall have the capacity to provide a minimum of one (1) Truck Mounted Jet/Vacuum Pipe/Sewer Cleaner with adequate number of operators to safely and effectively run the Jet-Vac and accomplish solid waste removal in the wastewater holding ponds. The pipe/sewer cleaner shall also have a minimum 6,000-gallon tank, 500-foot-high pressure sewer cleaning hose with a minimum of 2500 PSI and 800 CFB vacuum system with various size sewer nozzles and shall be equipped with a minimum twelve (12) cu. yd. debris bucket, and an independent water/vacuum system for solid waste (sludge) removal. The bidder shall be required to provide, with their bid, the make, model and capacity of each piece of equipment, as noted in the Pricing Schedule. Reference to the Attachment titled Vendor Qualification/Equipment Inventory Certification Form. A pre award meeting may be conducted to inspect all equipment and verify personnel requirements prior to posting the Notice of Intent to Award. No compensation will be given for this meeting The Contractor shall provide any accessories that are necessary to operate the needed equipment efficiently. This shall include, but is not limited to, all hand tools and safety supplies.

4. Maintaining Equipment: The Contractor shall maintain and operate equipment designed for the operation(s) described herein and shall ensure the equipment is maintained in good repair and operating condition. If a breakdown occurs, the equipment must be in operable condition within four (4) hours, or a replacement piece of equipment shall arrive within four (4) hours, if it is deemed essential by VDOT. No payment time shall be allowed for equipment breakdowns.

5. Vehicle Requirements: All Contractor vehicles shall have a current inspection and registration from the state where the vehicle is registered and must be properly insured in accordance with that State’s requirements. Contractor’s equipment and operators shall be in compliance with all applicable DMV and State and Federal regulations regarding the conditions and operations of the requested vehicles. The name of the company must be displayed on both sides of all work vehicles while on state right of way. The contractor shall be responsible for having secured all equipment and materials on their vehicles when in transit to and from work assignment.

Chemical Containment Pond Pumping

7 | P a g e

6. Fueled and Ready: The Contractor at their own expense shall have equipment fueled and ready to begin operations prior to reporting to work site.

7. Salt Pond Water Removal: The Contractor shall arrive at the site (empty) and leave the site (each time) full to facilitate the gallon count. The Contractor shall ensure the equipment is in good mechanical and operating condition and meet all applicable safety requirements to include working backup alarms and lights.

8. Commercial Driver's License: When required by the equipment being operated, the operator of each piece of equipment shall possess a valid Commercial Driver's License with the proper endorsement.

9. Bid Prices: The unit bid price for all required equipment shall be paid by the gallon for the removal of water from the salt pond and the hourly rate for the removal of sediment/sludge; both units of measure shall include the operator, fuel, cost for mobilization and disposal. VDOT will pay only per gallon of water removed as determined by the manifest ticket and hourly for the removal of sediment/sludge. The hourly rate will be paid for actual hours worked to the nearest ¼ (one quarter) of an hour in compliance of the Contractor’s hourly bid price. No travel time will be allowed to or from the job site or from job site to job site.

D. PERSONNEL REQUIREMENTS:

1. Experienced, Qualified Operators: The Contractor shall provide experienced, properly trained, qualified operators for equipment listed. The operator of each piece of equipment shall possess a valid Commercial Driver’s License (CDL) with the proper endorsements. when required for the equipment being operated.

The Contractor shall comply with all environmental regulations necessary to complete the project.

To ensure the overall safety of all personnel and VDOT property involved, the Contractor shall be required to provide employees that are able to communicate in the English language. The employees shall be required to demonstrate that they are capable of understanding directions and task requests in English for safe and effective operations.

2. Safety References: All work performed shall conform to all applicable state codes, specifications, and standards, including VOSH, OSHA, NCHRP 350 and Virginia Work Area Protection Manual.

a. All personnel shall at all times wear approved protective clothing, and any other equipment required to meet OSHA and VOSH Standards. The contractor shall verify site conditions prior to starting work.

b. All Contractor supplied equipment, tools, and personal safety equipment shall meet or exceed the safety standards specified for such items by the American National Standards Institute Manual

(ANSI Z133.1-1994).

c. A copy of the Virginia Work Area Protection Manual can be obtained by contacting the Office of the State Traffic Engineer, at 1401 East Broad Street, Richmond, Virginia 23219 or online.

3. Safety Equipment: The Contractor shall provide and ensure all employees wear the proper safety equipment while on the work site in accordance with the OSHA and VOSH standards. Necessary safety supplies and equipment shall include, but is not limited to, hardhats, safety vests, steel-toed shoes, gloves, glasses, etc.

Failure to comply with the safety requirement constitutes reason to restrict work being performed under this contract. In addition, no hardhat or safety vest shall have the Virginia state seal or any reference to the Virginia Department of Transportation or VDOT.

4. Authority to Suspend Work: During the execution of the work, the Contract Administrator, will have the authority to suspend the work fully or in part due to the failure of the Contractor to correct conditions unsafe for the workers and/or general public, failure to carry out orders for such period, and as may be deemed

Chemical Containment Pond Pumping

8 | P a g e necessary due to unsuitable weather, conditions unsuitable for the execution of work, or for any other conditions or reasons deemed to be in the public’s interest.

5. Contractor's Conduct: The Contractor shall be responsible for the conduct of all personnel while on the work site. All personnel involved with the work being performed shall obey all the rules and regulations of VDOT. Inappropriate behaviors displayed by the Contractor's employees, including but not limited to, addressing stopped motorists for personal gain, whistling or leering at motorists will not be tolerated. Any employees of the Contractor exhibiting inappropriate behavior will be barred from work sites permanently.

Repeated incidents with inappropriate behavior from Contractor's employees shall be grounds for termination of this contract and purchase orders associated with this contract at the discretion of VDOT.

6. Crew Supervision: The Contractor shall provide supervision for employees at all times to include onsite visits. All crewmembers shall wear a minimum of short sleeve shirt and full-length pants while performing work under this contract.

7. Contact Person: The Contractor shall assign a Supervisor as the Contract Representative, who will have the authority to execute the work. The Representative’s name and phone number as well as alternate contact information, shall be provided on the bid response on Attachment E (Normal and Emergency Contacts). The Contractor shall at all times keep a cellular phone capable of operating throughout the area covered by the contract. The Supervisor shall be available during the specified working areas for immediate contact and have the authority to take immediate action to correct conditions determined by VDOT to be unsafe, or otherwise not in accordance with the terms of the contract. The Contractor must be able to communicate with VDOT personnel at all times. Changes in Supervisor shall be reported to VDOT in a timely manner to prevent loss of communication with the Contractor.

8. Sanitary Facilities: Contractor will provide access to toilet facilities while working on projects. It is the responsibility of the Contractor to accommodate their employee's bathroom and/or relief breaks, if necessary, at no additional cost to VDOT.

9. Accident and Injuries: The Contractor shall immediately notify the Contract Administrator for any accident that occurs within the work zone or for any personal injury which requires off-site medical treatment.

E. MOBILIZATION REQUIREMENTS:

1. Regular, scheduled mobilization will be included in the bid price.

2. Emergency Mobilization: A one-time, per event, payment of $500 per project. Contractors must report to the project site within two (2) hours of VDOT contacting them. One-time price for emergency mobilization of requested equipment and personnel. If the Contractor is unable to provide services within two (2) hours, VDOT may procure these services from another source and no emergency mobilization payment will be paid to the Contractor.

3. Night Operations Mobilization: A one-time, per event, payment of $500 per scheduled project. Hours of operation are 8pm – 5am.

F. BILLABLE TIME:

1. Hours of Operation: Work will be assigned on an as-needed basis, as determined by the Contract Administrator. Sarting times and work schedules may vary and will be at the discretion of the Contract Administrator. Most scheduled hours will begin at 7:00am (EST) and end at 6:00pm (EST) or in accordance with the VDOT Fredericksburg District’s Allowable Lane Closures; however, the Contract Administrator reserves the right to alter work schedules as needed. There may be circumstances under which the Contractor may be required to work extended hours, nighttime hours, or weekends to complete the ordinary maintenance

Chemical Containment Pond Pumping

9 | P a g e work and planned scheduled work. VDOT will inform the Contractor of seasonal hours or temporary or permanent schedule changes in a timely manner

2. Holidays: Except as is necessary to maintain traffic, work shall not be performed on Sundays or the following holidays without the permission of the Engineer: January 1, Martin Luther King, Jr. Day, George Washington Day, Easter, Memorial Day, Juneteenth, July 4, Labor Day, Columbus Day, Election Day, Veterans Day, shall be considered the holiday. In addition to the Sunday or Holiday work limitations, mobile, short duration, short-term stationery, or intermediate-term stationary temporary traffic control zone (as defined in the VWAPM) lane closures on mainline lanes, shoulders, or ramps shall not be performed during the following Holiday time periods without the written permission of the Engineer. Additionally, a long-term stationary temporary traffic control zone (as defined in the VWAPM) shall not be initially put in place, adjusted, or removed during the following Holiday time periods without the written permission of the Engineer:

• January 1: From Noon on the preceding day until Noon on the following day, except as indicated below for Holidays occurring on a Friday/Saturday or Sunday/Monday.

• Easter: As indicated below for Holidays occurring on a Sunday.

• Memorial Day: As indicated below for Holidays occurring on a Monday.

• July 4: From Noon on the preceding day until Noon on the following day, except as indicated below for Holidays occurring on a Friday/Saturday or Sunday/Monday.

• Labor Day: As indicated below for Holidays occurring on a Monday

• Thanksgiving Day: From Noon on the Wednesday preceding Thanksgiving Day until Noon on the Monday following Thanksgiving Day.

• Christmas Day: From Noon on the preceding day until Noon on the following day, except as indicated below for Holidays occurring on a Friday/Saturday or Sunday/Monday.

• If the Holiday occurs on a Friday or Saturday: From Noon on the preceding Thursday to

Noon on the following Monday.

• If the Holiday occurs on a Sunday or Monday: From Noon on the preceding Friday to Noon on the following Tuesday.

G. METHOD OF ORDERING WORK – WORK ORDER (WO) Estimates:

1. VDOT Contract Administrator will request an estimate from the Contractor for each project. Contractor has five (5) business days to respond.

2. A purchase order will be issued for billing purposes only based on estimated usage during the defined period and shall not be interpreted as a notice to proceed.

3. VDOT Contract Administrator will coordinate with the Contractor via phone to schedule the daily operations of each project. VDOT Contract Administrator will then issue a numbered and dated WO/Notice to Proceed outlining the daily operations of each project to include location, description and start/commencement date and required completion date of operations. Contractor has two (2) business days to confirm or reschedule.

4. VDOT shall be advised, at its request, as to the status of the work being performed by the Contractor and of the details there to. Coordination will be maintained by the Contractor with the Contract Administrator.

5. The actual quantities of purchase orders to be utilized during the term of the awarded contract are unknown and will be estimates only. Factors that may determine the actual quantities, frequencies of service and/or level of service may include but are limited to; Executive Orders and Department directives affecting funding allocated for the services described in this solicitation. At VDOT’s sole discretion, none or all of the Contractor’s equipment/laborers may be utilized; any or all of the quantities may be eliminated; by signing this invitation for bid, the Bidder agrees that no claims for contractor costs or damages will be

Chemical Containment Pond Pumping

10 | P a g e allowed for a decrease or elimination of the estimated quantities, or the failure of their company being utilized by a Commonwealth of Virginia entity.

6. Continuous Operation Requirement: The Contractor shall provide a continuous operation once work has commenced, with the exception of interruptions caused by weather or delays authorized by the Contract Administrator. The Contractor shall provide sufficient equipment and personnel to complete the work within the timeframe specified. Performing maintenance or repairs of the Contractor’s equipment or re-fueling equipment shall not cause interruptions. If this is not done, a Vendor Complaint Form may be issued, which may ultimately result in the default of the contract.

H. CONTRACTOR RESPONSE REQUIREMENTS:

1. Commencement of Work: The Contractor shall be capable of commencing work within ten (10) days after contract award, unless otherwise noted.

2. Upon submission of Work Order, the Contractor shall have five (5) business days to commence work, unless otherwise scheduled with the Contract Administrator. Contractor shall give VDOT notice of when work will commence, no later than 24 hours prior to reporting to work locations. Contractor shall contact each Area Headquarters Superintendent 24 hours prior to arriving at their location.

If the Contractor is actively prosecuting work under this contract on previously scheduled locations when VDOT notifies the Contractor of additional locations, the time limit for the additional locations may begin upon completion of the work underway in that particular Area Headquarters or as approved by the VDOT, unless the new assignment is deemed urgent.

3. Critical Need / Immediate Response: When there is a requirement for critical mobilization, the Contractor shall confirm within two (2) hours after being contacted by the Contract Manager and work shall begin within eight (8) hours. The Contractor may, at the time of the notification, request an additional time to respond. Approval of additional response time will be decided on a case-by-case basis. Service under this contract may be required for emergency situations (floods, etc.), which would require a response time per the emergency situation. In cases of emergency, VDOT may contract services elsewhere if the Contractor cannot respond as needed.

4. Critical/Immediate Mobilization: In the event of a critical/immediate need, the Contract Manager, may request the Contractor furnish any or all listed equipment within eight (8) hours of notification. If the Contractor is unable to provide the services within the required timeframe, VDOT may procure these services from another source. A critical mobilization fee shall apply of $500.00.

5. Contractor's Failure to Report: If the Contractor fails to commence work at the mutually agreed upon time, a Procurement Complaint Form may be issued against the Contractor. It shall address the deficiency and corrective action needed. If corrective actions are not acquired by the deadline stated in the cure letter, VDOT may have the work accomplished by another source and the Contractor may be held responsible for any resulting additional purchase and administrative costs in accordance with General Terms and Conditions Paragraph P.

6. Service Under this contract may be required for emergency situations (floods, etc.), which would require an immediate response time per the emergency. In cases of emergency, VDOT may contract services elsewhere if the Contractor cannot respond as needed.

QUALITY CONTROL - FINAL INSPECTION: At the completion of each assigned project, the Contractor shall demonstrate to the VDOT representative that the work is in compliance with the specifications set herein and any codes applicable. Any deficiencies shall be corrected by the Contractor at the Contractor's sole expense within 48 hours and prior to the final acceptance of the work. A final inspection

Chemical Containment Pond Pumping

11 | P a g e result of satisfactory is required prior to billing for the work. Final inspection results will be returned to the Contractor via the completed Purchase Order form, signed by an authorized VDOT representative.

V. OPTIONAL PRE-BID CONFERENCE:

An optional virtual pre-bid conference will be hosted by the Contract Officer at 1:00PM EST on June 29, 2026. The purpose of this conference is to allow potential bidders an opportunity to present questions and obtain clarification relative to any facet of this solicitation. While attendance at this conference will not be a prerequisite to submitting a bid, bidders who intend to submit a bid are encouraged to attend.

The conference will begin promptly at the time indicated. At the start of the conference the Contract Officer will conduct an attendance roll call to identify the individuals participating. Participants will be requested to provide their individual name, company name and contact information during the roll call.

This Microsoft Teams Virtual Meeting conference can be accessed with the below information:

Microsoft Teams meeting Join: https://teams.microsoft.com/meet/24811844346085?p=FlBNA9sK54xNFaPbWr Meeting ID: 248 118 443 460 85 Passcode: iw7SC79r

Need help? | System reference Dial in by phone +1 434-230-0065,,509140315# United States, South Hill Find a local number Phone conference ID: 509 140 315#

Have a copy of the solicitation with you. Any changes resulting from this conference will be issued in a written addendum to the solicitation.

VI. METHOD FOR PAYMENT:

Payment will be made (in accordance with the Virginia Prompt Payment Act) within 30 days after receipt of valid invoice and verification of satisfactory goods received and/or completion of work. Invoices shall be submitted to the address listed below for all items completed within the designated billing period.

Payment will be made via check, ACH, or EDI. Payment may also be made via P-Card for invoices within the P-Card limit if the Contractor accepts the State’s Small Purchase Charge Card. For questions about eVA please contact eVA Customer Care center at eVACustomerCare@DGS.Virginia.gov. For questions about electronic payments please contact DOA at (804) 692- 0473 or via email at: edi@doa.virginia.gov

VII. INVOICING:

Invoices shall be submitted once the project is done, to the address listed below. Invoices shall include the contract number, purchase order number, itemized quantities, unit price, and extended costs based on the contract pricing schedule. No payment will be made for work in progress on the prescribed payment dates. Work completed will be verified in writing by a VDOT Representative and Contractor Foreman on an agreeable format.

Virginia Department of Transportation

86 Deacon Road Fredericksburg, VA 22405

In lieu of mailing, invoices may be submitted as an attachment via email to Fredresidencybusinessoffice@vdot.virginia.gov https://teams.microsoft.com/meet/24811844346085?p=FlBNA9sK54xNFaPbWr https://aka.ms/JoinTeamsMeeting?omkt=en-US https://teams.microsoft.com/l/meetup-join/19%3ameeting_YjI4NDhlMjktOWFkMy00OGI4LTkwZTAtZjM3Nzk4ODI2OWYx%40thread.v2/0?context=%7b%22Tid%22%3a%22620ae5a9-4ec1-4fa0-8641-5d9f386c7309%22%2c%22Oid%22%3a%222f07af06-9f9d-4602-b4fa-0dc5655a080e%22%7d tel:+14342300065,,509140315 https://dialin.teams.cloud.microsoft/69fbdf03-a314-4206-b210-d4d007632545?id=509140315 mailto:edi@doa.virginia.gov mailto:Fredresidencybusinessoffice@vdot.virginia.gov

Chemical Containment Pond Pumping

12 | P a g e

VIII. BIDDER’S INSTRUCTIONS AND PUBLIC BID OPENING:

1. BID SUBMISSION – INSTRUCTIONS:

All bids must be submitted electronically online via eVA using the Bidder’s established eVA Supplier Account. The entire bid response including any / all attachments and any / all addenda must be submitted electronically in eVA no later than the closing date and time stated on the electronic solicitation posting. Faxed, emailed, mailed or hand-delivered bids will not be accepted.

To learn how to submit an online bid in eVA please refer to the online supplier training page at:

https://eva.virginia.gov/supplier-training-materials.html

The link to the video “Viewing and Responding to Solicitations” can be found on the Supplier Training Materials page at:

https://www.youtube.com/watch?v=KSxcAkOekW0

It is the responsibility of the Bidder to ensure the bid and all required attachments are properly completed, readable and uploaded to eVA by the date and time deadline stated on the electronic solicitation posting. Bidders should allow sufficient time to account for any technical difficulties they may encounter during online submission or uploading of documents.

In the event of technical difficulties, suppliers should contact eVA Customer Care at 1-866-289-7367 or via email at eVACustomerCare@DGS.Virginia.gov.

2. PUBLIC BID OPENING:

Bids will be opened at the time stated on the electronic posting and the reminders page of this solicitation, and their contents per the Virginia Public Procurement Act and Commonwealth of Virginia Vendors Manual, will be made public for the information of bidders and others interested.

A virtual public bid opening will be hosted by a VDOT representative at 10:00AM EST on July 15, 2026.

Microsoft Teams meeting Join: https://teams.microsoft.com/meet/276469407760548?p=prL0AIhEU6rGsAR2W7 Meeting ID: 276 469 407 760 548 Passcode: 6qY6fh6o

Need help? | System reference Dial in by phone +1 434-230-0065,,46595884# United States, South Hill Find a local number Phone conference ID: 465 958 84#

The bid opening will begin promptly at the time indicated. At the start of the conference the VDOT Representative will conduct a roll call to identify the individuals participating on the call. Participants will be requested to provide their individual name, company name and contact information during the roll call.

If you are unable to access the teleconference at the scheduled time, please contact the Contract Officer via email and a bid reading will be provided.

The provisions of § 2.2-4342 of the Code of Virginia, as amended, shall be applicable to the inspection of bids received.

https://eva.virginia.gov/index.html https://eva.virginia.gov/supplier-training-materials.html https://www.youtube.com/watch?v=KSxcAkOekW0 mailto:eVACustomerCare@DGS.Virginia.gov https://teams.microsoft.com/meet/276469407760548?p=prL0AIhEU6rGsAR2W7 https://aka.ms/JoinTeamsMeeting?omkt=en-US https://teams.microsoft.com/l/meetup-join/19%3ameeting_NzA1YmJjMzEtYzA2MC00MWI4LTgxZTEtNDhjZGE4NmNkYzEx%40thread.v2/0?context=%7b%22Tid%22%3a%22620ae5a9-4ec1-4fa0-8641-5d9f386c7309%22%2c%22Oid%22%3a%222f07af06-9f9d-4602-b4fa-0dc5655a080e%22%7d tel:+14342300065,,46595884 https://dialin.teams.cloud.microsoft/69fbdf03-a314-4206-b210-d4d007632545?id=46595884

Chemical Containment Pond Pumping

13 | P a g e

IX. GENERAL TERMS AND CONDITIONS:

A. VENDORS MANUAL: This solicitation is subject to the provisions of the Commonwealth of Virginia Vendors Manual and any changes or revisions thereto, which are hereby incorporated into this contract in their entirety. The process for filing a complaint about this solicitation is in section 7.13 of the Vendors Manual. (Note section 7.13 does not apply to protests of awards or formal contractual claims.) The procedure for filing contractual claims is in section 7.19 of the Vendors Manual. A copy of the manual is normally available for review at the purchasing office and is accessible on the Internet at eva.virginia.gov under “I Sell To Virginia”.

B. APPLICABLE LAWS AND COURTS: This solicitation and any resulting contract shall be governed in all respects by the laws of the Commonwealth of Virginia, without regard to its choice of law provisions, and any litigation with respect thereto shall be brought in the circuit courts of the Commonwealth. The agency and the contractor are encouraged to resolve any issues in controversy arising from the award of the contract or any contractual dispute using Alternative Dispute Resolution (ADR) procedures (Code of Virginia, § 2.2-4366). ADR procedures are described in Chapter 9 of the Vendors Manual. The contractor shall comply with all applicable federal, state and local laws, rules and regulations.

C. ANTI-DISCRIMINATION: By submitting their bids, bidders certify to the Commonwealth that they will conform to the provisions of the Federal Civil Rights Act of 1964, as amended, as well as the Virginia Fair Employment Contracting Act of 1975, as amended, where applicable, the Virginians With Disabilities Act, the Americans With Disabilities Act and § 2.2-4311 of the Virginia Public Procurement Act (VPPA). If the award is made to a faith-based organization, the organization shall not discriminate against any recipient of goods, services, or disbursements made pursuant to the contract on the basis of the recipient's religion, religious belief, refusal to participate in a religious practice, or on the basis of race, age, color, gender sexual orientation, gender identity, or national origin and shall be subject to the same rules as other organizations that contract with public bodies to account for the use of the funds provided; however, if the faith-based organization segregates public funds into separate accounts, only the accounts and programs funded with public funds shall be subject to audit by the public body. (Code of Virginia, § 2.2-4343.1(E)).

In every contract over $10,000 the provisions in 1. and 2. below apply:

1. During the performance of this contract, the contractor agrees as follows:

a. The contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, sexual orientation, gender identity, national origin, age, disability, or any other basis prohibited by state law relating to discrimination in employment, except where there is a bona fide occupational qualification reasonably necessary to the normal operation of the contractor. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause.

b. The contractor, in all solicitations or advertisements for employees placed by or on behalf of the contractor, will state that such contractor is an equal opportunity employer.

c. Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this section.

d. If the contractor employs more than five employees, the contractor shall (i) provide annual training on the contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the Department of Human Resource Management, and (ii) post the contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the contractor owns or leases for business purposes and (b) the contractor's employee handbook.

e. The requirements of these provisions 1. and 2. are a material part of the contract. If the Contractor violates one of these provisions, the Commonwealth may terminate the affected part of this contract for breach, or at its option, the whole contract. Violation of one of these provisions may also result in debarment from State contracting regardless of whether the specific contract is terminated.

http://www.eva.virginia.gov/

Chemical Containment Pond Pumping

14 | P a g e

f. In accordance with Executive Order 61 (2017), a prohibition on discrimination by the contractor, in its employment practices, subcontracting practices, and delivery of goods or services, on the basis of race, sex, color, national origin, religion, sexual orientation, gender identity, age, political affiliation, disability, or veteran status, is hereby incorporated in this contract.

2. The contractor will include the provisions of 1. above in every subcontract or purchase order over $10,000, so that the provisions will be binding upon each subcontractor or vendor.

D. ETHICS IN PUBLIC CONTRACTING: By submitting their bids, bidders certify that their bids are made without collusion or fraud and that they have not offered or received any kickbacks or inducements from any other bidder, supplier, manufacturer or subcontractor in connection with their bid, and that they have not conferred on any public employee having official responsibility for this procurement transaction any payment, loan, subscription, advance, deposit of money, services or anything of more than nominal value, present or promised, unless consideration of substantially equal or greater value was exchanged.

E. IMMIGRATION REFORM AND CONTROL ACT OF 1986: Applicable for all contracts over $10,000:

By entering into a written contract with the Commonwealth of Virginia, the Contractor certifies that the Contractor does not, and shall not during the performance of the contract for goods and services in the Commonwealth, knowingly employ an unauthorized alien as defined in the federal Immigration Reform and Control Act of 1986.

F. DEBARMENT STATUS: By participating in this procurement, the vendor certifies that they are not currently debarred by the

Commonwealth of Virginia from submitting a response for the type of goods and/or services covered by this solicitation. Vendor further certifies that they are not debarred from filling any order or accepting any resulting order, or that they are an agent of any person or entity that is currently debarred by the Commonwealth of Virginia.

If a vendor is created or used for the purpose of circumventing a debarment decision against another vendor, the non-debarred vendor will be debarred for the same time period as the debarred vendor.

G. ANTITRUST: By entering into a contract, the contractor conveys, sells, assigns, and transfers to the Commonwealth of Virginia all rights, title and interest in and to all causes of action it may now have or hereafter acquire under the antitrust laws of the United States and the Commonwealth of Virginia, relating to the particular goods or services purchased or acquired by the Commonwealth of Virginia under said contract.

H. MANDATORY USE OF STATE FORM AND TERMS AND CONDITIONS FOR IFBs: Failure to submit a bid on the official state form provided for that purpose shall be a cause for rejection of the bid. Modification of or additions to any portion of the Invitation for Bids may be cause for rejection of the bid; however, the Commonwealth reserves the right to decide, on a case-by-case basis, in its sole discretion, whether to reject such a bid as nonresponsive. As a precondition to its acceptance, the Commonwealth may, in its sole discretion, request that the bidder withdraw or modify nonresponsive portions of a bid which do not affect quality, quantity, price, or delivery. No modification of or addition to the provisions of the contract shall be effective unless reduced to writing and signed by the parties.

I. CLARIFICATION OF TERMS: If any prospective (bidder has questions about the specifications or other solicitation documents, the prospective bidder should contact the buyer whose name appears on the face of the solicitation no later than five working days before the due date. Any revisions to the solicitation will be made only by addendum issued by the buyer.

J. PAYMENT:

1. To Prime Contractor:

a. Invoices for items ordered, delivered and accepted shall be submitted by the contractor directly to the payment address shown on the purchase order/contract. All invoices shall show the state contract number and/or purchase order number;

social security number (for individual contractors) or the federal employer identification number (for proprietorships, partnerships, and corporations).

Chemical Containment Pond Pumping

15 | P a g e

b. Any payment terms requiring payment in less than 30 days…