SR 422 Benjamin Franklin Highway Resurfacing Project Summary
This proposal report from the Pennsylvania Department of Transportation (PennDOT) outlines a milling and resurfacing project for State Route 422 Section L39 spanning approximately 3.8 miles through Lawrence County in Shenango and Slippery Rock Townships. The project encompasses asphalt pavement milling and resurfacing, base repairs, minor structure work, guide rail installation and replacement, drainage improvements, signing and pavement markings, traffic signal upgrades, and miscellaneous construction work as indicated on approved drawings. The project is divided into over 100 line items covering materials and services ranging from clearing and grubbing to concrete pavement patching, bridge repairs, permanent impact attenuating devices, guard rail work, and pavement markings. The scheduled let date is June 18, 2026, with an anticipated Notice to Proceed of August 3, 2026, and required project completion by January 5, 2029. No pre-bid meeting is required, and prequalification is mandated for bidders. The project type is classified as resurfacing/overlays for a National Highway System (NHS) road.
The contract is estimated between $15,000,000 and $19,999,999.99 and is federally funded, requiring compliance with Federal-Aid Highway Program provisions including Buy America and Build America requirements. A zero percent Disadvantaged Business Enterprise (DBE) set-aside applies. Prevailing wage rates are required for all work. The project includes significant construction operations such as 226,830 square yards of milling, over 226,000 square yards of asphalt wearing course placement, and over 75,000 linear feet of pavement markings. Road User Liquidated Damages (RULD) of $1,700 per hour apply for traffic restrictions exceeding specified times, and $13,300 per weekend for weekend restrictions beyond allowable limits. Special provisions address erosion and sediment control, environmental constraints including restrictions on in-stream work in Slippery Rock Creek and tree clearing near bat hibernacula, worker protection and investment certifications, and coordination with McConnell's Mill State Park access maintenance. All materials must comply with federal Buy America and Build America Act requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL Report - Project 116560
May 21, 2026 15:36:14 PM Page 1 of 90
PROPOSAL REPORT
Project: 116560 Bid
Package: 1
Current Let: 06/18/2026 11:00:00 AM
Version: Current Addendum
Count: 0
District: 11 County: Lawrence
SR/SEC/
Group ID: 422/0/---
Description
SR 422, Benjamin Franklin Hwy
May 21, 2026 15:36:14 PM Page 2 of 90
TABLE OF CONTENTS
BID PACKAGE SUMMARY
PROJECT ITEMS AND QUANTITIES
SPECIAL PROVISIONS
G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW C164A - a00164 CHANGES TO SPECIFICATIONS: SECTION 106 C166A - a00166 CHANGES TO SPECIFICATIONS: SECTIONS 107 AND 608 C167A - a00167 CHANGES TO SPECIFICATIONS: APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
C168A - a00168 CHANGES TO SPECIFICATIONS: SECTIONS 110, 404, AND 507 G312A - a00312 Road Users Liquidated Damages (RULD) G501A - a00501 AIR POLLUTION CONTROL IN AIR BASINS G1601A - a01601 E.E.O. COVERED AREA G2302A - a02302 Worker Protection and Investment G35651B - a35650 Final Structure Files 00 - a35655 Notice to Contractor G35565B - a35660 Requirements for Department Policies Special Provision G35721E - a35665 Resetting Segment Markers G35566A - a35670 Unmanned Aircraft System (UAS) Requirements S1050D - b01050 Section 105.14 - Borrow Areas, Waste Areas and Staging and Storing Areas P1061D - b01061 Electronic Submission of Material Certifications through ECMS P1062D - b01062 Electronic Submission of Material Certifications through ECMS for Lump Sum Component items
00 - b01085 Section 108.05(c)5 Material Transfer Vehicle (MTV) S501A - b0501A Sections 501, 704 and 1042 - Concrete Wearing Surfaces SRL-H S6012B - b06012 - SECTION 601.3(f) BACKFILLING TRENCH S9001D - b09001D Section 901 S1001A - b1001a Section 1001 - Cement Concrete Structures S1040A - b1040a Sections 1040, 1042 and 1090 Cleaning and Preparing Repair Areas 00 - c03130 Item 4313-0537 - Superpave Asphalt Mixture Design, Base Course, PG 64S-22, 3 to < 10 Modified
00 - c03160 Item 4316-0537 - Superpave Asphalt Mixture Design, Flexible Base Replacement, Modified
00 - c04913 Items 4491-0013/0019 - Milling of Asphalt Pavement Surface 00 - c05041 Item 4504-0001 - Pavement Relief Joint Modified I6091L - c06091 ITEM 0609-0009 - EQUIPMENT PACKAGE 00 - c06190 Item 4619-0459 - Permanent Impact Attenuating Device, Type III, Test Level 3, Modified.. 60 00 - c06231 Item 4623-0301 - Concrete Median Barrier, F-Shape, 32" Height Modified I8021A - c08021 Item 4802-0001 - Topsoil Furnished and Placed Modified
May 21, 2026 15:36:14 PM Page 3 of 90
00 - c09530 Item 4953-0405 - Radio Communication System Modified 00 - c09560 Item 4956-0601 - Radar Detector Modified 00 - c10141 Item 5014-0001 - Steel Bridge Railing Modified 00 - c10901 Item 5090-1017 - Neoprene Strip Seal Gland Replacement Modified I19992A - c19992 ITEM 1999-9999 - TRAINEES 00 - c90001 Item 9000-0001 - Transverse Joint Repair 00 - c90002 Item 9000-0002 - Longitudinal Joint Repair 00 - c90010 Item 9000-0010 - Cleaning of Existing Shoulders 00 - c90020 Item 9000-0020 - Remove Existing Railroad Ties 00 - c90026 Item 9000-0026 - Asphalt Driveway Adjustment 00 - c90027 Item 9000-0027 - Asphalt Driveway Reconstruction 00 - c90030 Item 9000-0030 - Thrie-Beam Guide Rail to Existing Bridge Barrier with Railing Transition
00 - c90051 Item 9000-0051 - Traffic Signal Supports 00 - c90052 Item 9000-0052 - Removal of Existing Traffic Signal Equipment 00 - c90053 Item 9000-0053 - Relocate Existing Radar Detection System 00 - c90100 Item 9000-0100 - Stream Control 00 - c90101 Item 9000-0101 - Intrusion Grout Bag 00 - c90102 Item 9000-0102 - Clean and Flush Bridge Deck and Drainage Systems 00 - c90103 Item 9000-0103 - Bridge Barrier and Joint Sealing 00 - c90104 Item 9000-0104 - Install Missing Sign Asset Tag Column I90250A - c90250 D11 Item 9000-0250 - Locate Existing Underground Facilities 00 - c92051 Item 9000-2051 - Selected Borrow Excavation, PTM 510 Rock I68C - c95101 ITEM 9000-5101 - ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION
AGGREGATE
I70C - c95103 ITEM 9000-5103 - ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION
CONCRETE
00 - c96056 Items 9000-6056/6057 - Core Hole in Inlet Box 00 - c96131 Item 9000-6131 - Stone Inlet Protection I99002B - c99002 Item 9000-9002 - Repair Deteriorated Concrete 00 - c99003 Item 9000-9003 - Repair Deteriorated Concrete on Deck Underside I9011B - c99011 D11 Item 9000-9011 - Off-Duty Uniformed Police Officer I1B - c99013 Items 9000-9012/9013 - 4" Temporary Shadow Line Pavement Markings 00 - c99601 Item 9960-0003 - White Hot Thermoplastic Legend, "Four-Way Intersection Ahead"
May 21, 2026 15:36:14 PM Page 4 of 90
BID PACKAGE SUMMARY
Project: 116560 Bid Package: 1
Project Type: Standard Posted:
Federal Project Status: PENNDOT Oversight NHS State Type of Work: RESURFACING/OVERLAYS
Prequalification Required: Yes Pre-Bid Meeting: None
408 Version: 2026-IE
Scheduled Let: 06/18/2026 11:00:00 AM Project Cost Range: $15,000,000.00 - $19,999,999.99 Anticipated NTP: 08/03/2026 Structure Work: 4.00%
Required Completion: 01/05/2029 DBE: 0% Wage Rates: Yes
Description:
The description and location of the project is as follows:For the milling and resurfacing of asphalt pavement, as directed base repairs, minor structure work, guide rail, drainage, signing and pavement markings, traffic signal upgrades, and other miscellaneous construction as indicated on the approved drawings for STATE ROUTE 422 SECTION L39 in LAWRENCE COUNTY, SHENANGO and SLIPPERY ROCK TOWNSHIPS, Commonwealth of Pennsylvania.This project being situated as follows: From a point approximately 1635 feet east of Willowbrook Road at Segments 0404/0405, Offsets 1049/1134 (Station 161+23) to the Butler County line at Segments 0550/0551, Offsets 1121/1141 (Station 542+12).
Additional Information:
This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
May 21, 2026 15:36:14 PM Page 5 of 90
PROJECT ITEMS AND QUANTITIES
Alt Item Work Class Code Unit Of
Measure Quantity Unit Price PDP Spec
Prov Add Action
0201-0001 A Lump Sum 1.0000 N
CLEARING AND GRUBBING
0203-0001 C Cubic Yard 3,068.0000 N
CLASS 1 EXCAVATION
0204-0001 C1, H Cubic Yard 7.0000 N
CLASS 2 EXCAVATION
0204-0010 C1, H Linear Foot 1,225.0000 N
CLEANING EXISTING DITCHES EXCAVATION
0205-0264 C1 Cubic Yard 1.0000 N
SELECTED BORROW EXCAVATION ROCK, CLASS R-4
0205-0364 C1 Ton 29.0000 N
SELECTED BORROW EXCAVATION ROCK, CLASS R-4
0205-0381 C1 Ton 69.0000 N
SELECTED BORROW EXCAVATION, COARSE AGGREGATE, NO. 1
0205-0385 C1 Ton 59.0000 N
SELECTED BORROW EXCAVATION, COARSE AGGREGATE, NO. 57
0205-0390 C1 Ton 108.0000 N
SELECTED BORROW EXCAVATION, COARSE AGGREGATE, NO. 2A
0208-0001 C Hour 20.0000 N
SPECIAL ROLLING
0208-0002 C1 Cubic Yard 480.0000 N
EXCAVATION/BACKFILL/COMPACTION
0212-0014 C3, H, M2 Square Yard 2,498.0000 N
GEOTEXTILE, CLASS 4, TYPE A
0212-0016 C3, H, M2 Square Yard 480.0000 N
GEOTEXTILE, CLASS 4, TYPE C
0213-0002 Z Dollar 1,500.0000 $1.00 Y
TEMPORARY PROJECT AIR POLLUTION CONTROL
0220-0010 K1 Cubic Yard 1.0000 N
FLOWABLE BACKFILL, TYPE B
4313-0537 E Ton 34.0000 N Proj SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, 3 TO < 10 MILLION ESALs, 25.0 MM MIX MODIFIED
0316-0537 E, F1 Ton 2,474.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, FLEXIBLE BASE REPLACEMENT, PG 64S-22, 3 TO < 10 MILLION ESALs, 25.0
MM MIX
May 21, 2026 15:36:14 PM Page 6 of 90
4316-0537 E, F1 Ton 6,615.0000 N Proj
SUPERPAVE ASPHALT MIXTURE DESIGN, FLEXIBLE BASE REPLACEMENT, PG 64S-22, 3 TO < 10 MILLION ESALs, 25.0
MM MIX MODIFIED
0404-0012 X Dollar 66,770.0000 $1.00 Y
ASPHALT PAVEMENT RIDE QUALITY INCENTIVE, SCHEDULE B
0413-0286 F Square Yard 69,399.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22, 3 TO < 10 MILLION ESALS, 12.5 MM MIX, 2"
DEPTH, SRL-L
0413-0387 F Square Yard 157,431.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64E-22, 3 TO < 10 MILLION ESALS, 12.5 MM MIX, 2"
DEPTH, SRL-E
0413-1029 F Ton 8,194.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE (SCRATCH), PG 64S-22, 3 TO < 10 MILLION ESALS, 9.5 MM
MIX, SRL-L
0413-7019 F Ton 28,357.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE (LEVELING), PG 64E-22, 3 TO < 10 MILLION ESALS, 19.0 MM
MIX
0413-9999 X Dollar 94,973.0000 $1.00 Y
PERCENT WITHIN LIMITS (PWL) LOT INCENTIVE/DISINCENTIVE
0450-1521 F1 Ton 25.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, MANUAL PATCHING, PG 64S-22, 3 TO < 10 MILLION
ESALS, 9.5 MM MIX, SRL-E
0460-0003 F4 Square Yard 553,608.0000 N
ASPHALT TACK COAT (NTT/CNTT)
0461-0002 F4 Gallon 6,330.0000 N
ASPHALT PRIME COAT
0467-0004 F2 Linear Foot 5,260.0000 N
HEAVY DUTY MEMBRANES 24" WIDTH
4491-0013 F3 Square Yard 53,592.0000 N Proj MILLING OF ASPHALT PAVEMENT SURFACE, 2" DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR MODIFIED
4491-0019 F3 Square Yard 173,238.0000 N Proj
MILLING OF ASPHALT PAVEMENT SURFACE, VARIABLE DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR
MODIFIED
4504-0001 G1, G4 Linear Foot 96.0000 N Proj
PAVEMENT RELIEF JOINT MODIFIED
0512-0001 G1, G4 Linear Foot 504.0000 N
LONGITUDINAL JOINT CLEANING AND SEALING
0515-0001 G1, G4 Linear Foot 35,738.0000 N
SAWING AND SEALING OF ASPHALT OVERLAYS
0516-2007 G1, G4 Linear Foot 2,564.0000 N
May 21, 2026 15:36:14 PM Page 7 of 90
PATCHING JOINT
0516-2009 G1, G4 Linear Foot 744.0000 N
NEW PAVEMENT JOINT, NON-SKEWED
0516-2021 C1, E, G1 Cubic Yard 463.0000 N
SUBBASE MATERIAL FOR CONCRETE PAVEMENT PATCHING
0516-2033 G1 Square Yard 516.0000 N
CONCRETE PAVEMENT PATCHING, TYPE A, 9" DEPTH
0516-2034 G1 Square Yard 414.0000 N
CONCRETE PAVEMENT PATCHING, TYPE A, 10" DEPTH
0516-2036 G1 Square Yard 570.0000 N
CONCRETE PAVEMENT PATCHING, TYPE A, 12" DEPTH
0516-2043 G1 Square Yard 338.0000 N
CONCRETE PAVEMENT PATCHING, TYPE B, 9" DEPTH
0516-2044 G1 Square Yard 140.0000 N
CONCRETE PAVEMENT PATCHING, TYPE B, 10" DEPTH
0516-2046 G1 Square Yard 354.0000 N
CONCRETE PAVEMENT PATCHING, TYPE B, 12" DEPTH
0601-5901 H1 Linear Foot 303.0000 N
CLEANING EXISTING PIPE CULVERTS, DIAMETERS UP TO AND INCLUDING 36"
0605-1300 C1, H1 Each 57.0000 N
CLEANING DRAINAGE STRUCTURES
0605-2701 K Each 56.0000 N
BICYCLE SAFE INLET GRATE
0605-2730 K Set 2.0000 N
TYPE M CONCRETE TOP UNIT AND GRATE
0605-2731 K Set 10.0000 N
TYPE M CONCRETE TOP UNIT AND BICYCLE SAFE GRATE
0605-2741 K Set 8.0000 N
TYPE S CONCRETE TOP UNIT AND BICYCLE SAFE GRATE
0605-2850 K Each 3.0000 N
STANDARD INLET BOX, HEIGHT < /= 10'
0606-0050 C1, K Set 2.0000 N
GRADE ADJUSTMENT OF EXISTING INLETS
0607-0013 K Vertical Foot 28.0000 N
REBUILT INLET BOX
0608-0001 X Lump Sum 1.0000 N
MOBILIZATION
May 21, 2026 15:36:14 PM Page 8 of 90
0609-0003 X Lump Sum 1.0000 N
INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES, TYPE B
0609-0009 X Lump Sum 1.0000 N Std
EQUIPMENT PACKAGE
0613-0001 C1, H Cubic Yard 45.0000 N
STONE BACKFILL FOR MISCELLANEOUS DRAINAGE
0619-0459 J1, J3 Each 98.0000 N
PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 3, TANGENT (MASH)
4619-0459 J1, J3 Each 1.0000 N Proj PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 3, TANGENT (MASH) MODIFIED
0619-0744 J3 Each 1.0000 N
PERMANENT IMPACT ATTENUATING DEVICE, TYPE V, TEST LEVEL 3, MASH, WIDTHS LESS THAN OR EQUAL TO 36
INCHES
0620-0503 C1, J Linear Foot 26,578.0000 N
REMOVE EXISTING GUIDE RAIL (CONTRACTOR'S PROPERTY)
0620-0872 J Each 1.0000 N
BURIED-IN-BACKSLOPE TERMINAL, SINGLE PANEL
0620-1600 J Linear Foot 20,780.0000 N
TYPE 31-S GUIDE RAIL
0620-1625 J Linear Foot 75.0000 N
TYPE 31-SC GUIDE RAIL
0620-1635 J Linear Foot 688.0000 N
TYPE 31-SCC GUIDE RAIL
0620-1680 J Linear Foot 175.0000 N
TYPE 31-S GUIDE RAIL TO TYPE 31-SCC GUIDE RAIL TRANSITION
0623-0275 J1 Linear Foot 11.0000 N
REMOVAL OF EXISTING CONCRETE MEDIAN BARRIER
4623-0301 J1 Linear Foot 11.0000 N Proj
CONCRETE MEDIAN BARRIER, F-SHAPE, 32" HEIGHT MODIFIED
0630-0041 K Linear Foot 288.0000 N
PLAIN CEMENT CONCRETE CURB, 8" HEIGHT
0659-0001 F4 Square Yard 3,007.0000 N
HIGH FRICTION SURFACE TREATMENT (HFST)
0660-0002 F3 Linear Foot 75,779.0000 N
MILLED ASPHALT PAVEMENT CENTERLINE RUMBLE STRIPS TYPE 2
0660-0003 F3 Linear Foot 75,779.0000 N
MILLED ASPHALT PAVEMENT SHOULDER RUMBLE STRIPS
0677-0001 C1, E Cubic Yard 134.0000 N
SELECTED MATERIAL SURFACING
May 21, 2026 15:36:14 PM Page 9 of 90
0686-0040 X Lump Sum 1.0000 N
CONSTRUCTION SURVEYING, TYPE C
0689-0005 X Lump Sum 1.0000 N
CPM SCHEDULE, WITH UPDATES
0690-0001 X Dollar 5,000.0000 $1.00 Y
INTERNAL FACILITATION
0703-0020 C1, H Cubic Yard 2,018.0000 N
NO. 1 COARSE AGGREGATE
0703-0024 C1, H Cubic Yard 23.0000 N
NO. 2A COARSE AGGREGATE
4802-0001 C1, M Cubic Yard 1,840.0000 N Std
TOPSOIL FURNISHED AND PLACED MODIFIED
0804-0025 M3 Pound 333.0000 N
SEEDING AND SOIL SUPPLEMENTS - FORMULA B RESIDENTIAL MIX, INCLUDING MULCH
0804-0027 M3 Pound 50.0000 N
SEEDING AND SOIL SUPPLEMENTS - FORMULA L CLEAR ZONE MIX, INCLUDING MULCH
0810-0026 M1 Linear Foot 1,233.0000 N
TREE TRIMMING TO A MAX HEIGHT OF 20'
0845-0001 M2 Dollar 5,000.0000 $1.00 Y
UNFORESEEN WATER POLLUTION CONTROL
0851-0001 C1 Each 1.0000 N
ROCK ENERGY DISSIPATOR
0860-0000 M2 Each 25.0000 N
INLET FILTER BAG FOR TYPE M INLET
0860-0001 M2 Each 25.0000 N
INLET FILTER BAG FOR TYPE S INLET
0867-0012 M2 Linear Foot 150.0000 N
COMPOST FILTER SOCK, 12" DIAMETER
0901-0001 Q Lump Sum 1.0000 N
MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION
0901-0231 Q Day 15.0000 N
ADDITIONAL WARNING LIGHTS, TYPE B
0901-0232 Q Day 15.0000 N
ADDITIONAL WARNING LIGHTS, TYPE C
0901-0240 Q, R Square Foot 50.0000 N
ADDITIONAL TRAFFIC CONTROL SIGNS
0901-0320 O Linear Foot 228,000.0000 N
May 21, 2026 15:36:14 PM Page 10 of 90
4" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, YELLOW
0901-0331 O Linear Foot 228,000.0000 N
6" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, WHITE
0910-2014 P8 Each 1.0000 N
20-FOOT BRACKET ARM
0910-5171 C1, P8 Linear Foot 200.0000 N
1" EXPOSED CONDUIT
0910-5179 C1, P8 Linear Foot 150.0000 N
3" EXPOSED CONDUIT
0930-0004 R Square Foot 342.0000 N
POST MOUNTED SIGNS, TYPE A
0931-0003 R Square Foot 790.0000 N
POST MOUNTED SIGNS, TYPE B, STEEL SQUARE POST
0934-0002 R Square Foot 25.0000 N
POST MOUNTED SIGNS, TYPE E
0935-0001 R Square Foot 203.0000 N
POST MOUNTED SIGNS, TYPE F
0935-0360 P8 Each 2.0000 N
LED BORDER LIT SIGN
0936-0200 R Square Foot 44.0000 N
STRUCTURE MOUNTED FLAT SHEET ALUMINUM SIGNS
0937-0106 J, R Each 374.0000 N
GUIDE RAIL MOUNTED DELINEATOR TYPE B, (W/B)
0937-0113 J, R Each 374.0000 N
GUIDE RAIL MOUNTED DELINEATOR TYPE D, (W/B)
0937-0201 J1, R Each 28.0000 N
BARRIER MOUNTED DELINEATOR, SIDE-MOUNT TYPE R, (W/B)
0937-0211 J1, R Each 28.0000 N
BARRIER MOUNTED DELINEATOR, TOP-MOUNT TYPE S, (W/B)
0937-0330 R Each 550.0000 N FLEXIBLE DELINEATOR POST, GROUND-MOUNT TYPE GM-2, WHITE POST WITH WHITE/BLANK SHEETING
0937-0337 R Each 75.0000 N FLEXIBLE DELINEATOR POST, GROUND-MOUNT TYPE GM-2, RED POST WITH RED/WHITE SHEETING
0950-0002 P Dollar 20,000.0000 $1.00 Y
UNFORESEEN TRAFFIC SIGNAL WORK
0951-4020 P Each 5.0000 N
PEDESTRIAN STUB POLE
May 21, 2026 15:36:14 PM Page 11 of 90
0952-1021 P Each 1.0000 N
NEMA TS-1 CONTROLLER ASSEMBLY, TYPE 2 MOUNTING
4953-0405 P Lump Sum 1.0000 N Proj
RADIO COMMUNICATIONS SYSTEM MODIFIED
0954-0011 P8 Linear Foot 600.0000 N
1 INCH CONDUIT
0954-0151 C1, P8 Linear Foot 160.0000 N
TRENCH AND BACKFILL, TYPE I
0954-0201 P8 Linear Foot 1,700.0000 N
SIGNAL CABLE, 14 AWG, 3 CONDUCTOR
0954-0202 P8 Linear Foot 2,000.0000 N
SIGNAL CABLE, 14 AWG, 5 CONDUCTOR
0954-0203 P8 Linear Foot 1,000.0000 N
SIGNAL CABLE, 14 AWG, 7 CONDUCTOR
0954-0402 P8 Each 1.0000 N
ELECTRICAL SERVICE, TYPE B
0955-3208 P Each 6.0000 N
VEHICULAR SIGNAL HEAD, THREE 12" SECTIONS
0955-3209 P Each 4.0000 N
VEHICULAR SIGNAL HEAD, FOUR 12" SECTIONS
0955-3722 P Each 6.0000 N
LED COUNTDOWN PEDESTRIAN SIGNAL HEAD, TYPE A
0956-0500 P Each 6.0000 N
PEDESTRIAN PUSH BUTTON
4956-0601 P Each 2.0000 N Proj
RADAR DETECTOR MODIFIED
0960-0002 O2 Linear Foot 75,779.0000 N
4" YELLOW HOT THERMOPLASTIC PAVEMENT MARKINGS
0960-0005 O2 Linear Foot 75,779.0000 N
6" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS
0960-0008 O2 Linear Foot 2,440.0000 N
8" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS
0960-0021 O2 Linear Foot 4,020.0000 N
24" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS
0960-0022 O2 Linear Foot 9,293.0000 N
24" YELLOW HOT THERMOPLASTIC PAVEMENT MARKINGS
0960-0101 O2 Each 32.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "ONLY", 8' - 0"
May 21, 2026 15:36:14 PM Page 12 of 90
0960-0143 O2 Each 2.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "SLOW", 8' - 0"
0960-0222 O2 Each 4.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "RIGHT ARROW", 12' - 0" X 3' - 0"
0960-0224 O2 Each 134.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "LEFT ARROW", 12' - 0" X 3' - 0"
0960-0233 O2 Each 3.0000 N WHITE HOT THERMOPLASTIC LEGEND, "LANE REDUCTION TRANSITION ARROW - LEFT T LANE", 18' - 0" X 5' - 6"
0963-0001 O2, O3 Square Foot 192,358.0000 N
PAVEMENT MARKING REMOVAL
0966-0011 O1 Each 800.0000 N
SNOWPLOWABLE RAISED PAVEMENT MARKER TWO WAY HOLDER WITH REFLECTOR (Y/Y)
0966-0017 O1 Each 450.0000 N
SNOWPLOWABLE RAISED PAVEMENT MARKER TWO WAY HOLDER WITH REFLECTOR (Y/B)
0966-0018 O1 Each 225.0000 N
SNOWPLOWABLE RAISED PAVEMENT MARKER TWO WAY HOLDER WITH REFLECTOR (W/B)
5014-0001 J2, S4 Linear Foot 25.0000 N Proj
STEEL BRIDGE RAILING MODIFIED
1040-0002 S9 Square Foot 25.0000 N
CONCRETE BRIDGE DECK REPAIR, TYPE 2
1040-0200 S9 Square Foot 30.0000 N
CONCRETE BRIDGE BARRIER REPAIR, TYPE 2
1090-1017 T5 Linear Foot 174.0000 N
NEOPRENE STRIP SEAL GLAND REPLACEMENT
5090-1017 T5 Linear Foot 58.0000 N Proj
NEOPRENE STRIP SEAL GLAND REPLACEMENT MODIFIED
1999-9999 Z Hour 1,000.0000 N Std
TRAINEES
9000-0001 G1, G4 Square Yard 4,934.0000 N Proj
TRANSVERSE JOINT REPAIR
9000-0002 F1, F2 Square Yard 500.0000 N Proj
LONGITUDINAL JOINT REPAIR
9000-0010 C1 Linear Foot 7,322.0000 N Proj
CLEANING OF EXISTING SHOULDERS
9000-0020 X Dollar 1.0000 $1.00 Y Proj
REMOVE EXISTING RAILROAD TIES
9000-0026 F, F1 Square Yard 3,069.0000 N Proj
May 21, 2026 15:36:14 PM Page 13 of 90
ASPHALT DRIVEWAY ADJUSTMENT
9000-0027 E, F Square Yard 523.0000 N Proj
ASPHALT DRIVEWAY RECONSTRUCTION
9000-0030 J Each 4.0000 N Proj
THRIE-BEAM GUIDE RAIL TO EXISTING BRIDGE BARRIER WITH RAILING TRANSITION
9000-0051 P Lump Sum 1.0000 N Proj
TRAFFIC SIGNAL SUPPORTS
9000-0052 P Lump Sum 1.0000 N Proj
REMOVAL OF EXIST TRAFFIC SIGNAL EQUIPMENT
9000-0053 P Lump Sum 1.0000 N Proj
RELOCATE EXISTING RADAR DETECTION SYSTEM
9000-0100 C1, M2 Lump Sum 1.0000 N Proj
STREAM CONTROL
9000-0101 M2 Cubic Foot 30.0000 N Proj
INTRUSION GROUT BAG
9000-0102 S2, T7 Lump Sum 1.0000 N Proj
CLEAN AND FLUSH BRIDGE DECK AND DRAINAGE SYSTEMS
9000-0103 S2 Square Yard 603.0000 N Proj
BRIDGE BARRIER AND JOINT SEALING
9000-0104 R1 Each 1.0000 N Proj
INSTALL MISSING SIGN ASSET TAG COLUMN
9000-0250 C1, P8 Dollar 5,000.0000 $1.00 Y Std
LOCATE EXISTING UNDERGROUND FACILITIES
9000-2051 C1 Ton 103.0000 N Proj
SELECTED BORROW EXCAVATION, PTM 510 ROCK
9000-5101 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION AGGREGATE
9000-5103 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION CONCRETE
9000-6056 K Each 5.0000 N Proj
CORE HOLE IN INLET BOX, 4" TO 12" DIAMETER
9000-6057 K Each 4.0000 N Proj
CORE HOLE IN INLET BOX, 15" TO 24" DIAMETER
9000-6131 K Each 12.0000 N Proj
STONE INLET PROTECTION
9000-9002 S2 Cubic Foot 454.0000 N Std
REPAIR DETERIORATED CONCRETE
May 21, 2026 15:36:14 PM Page 14 of 90
9000-9003 S2 Cubic Foot 540.0000 N Proj
REPAIR DETERIORATED CONCRETE ON DECK UNDERSIDE
9000-9011 X Dollar 10,000.0000 $1.00 Y Std
OFF DUTY UNIFORMED POLICE OFFICER
9000-9012 O Linear Foot 37,890.0000 N Std
4" TEMPORARY SHADOW LINE PAVEMENT MARKINGS, PAINT AND BEADS, YELLOW
9000-9013 O Linear Foot 37,890.0000 N Std
4" TEMPORARY SHADOW LINE PAVEMENT MARKINGS, PAINT AND BEADS, WHITE
9960-0003 O2 Each 4.0000 N Proj
WHITE HOT THERMOPLASTIC LEGEND, "FOUR-WAY INTERSECTION AHEAD"
May 21, 2026 15:36:14 PM Page 15 of 90
SPECIAL PROVISIONS
Special Provision: G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) Addendum:
Action:
Item(s) Associated:
Header:
APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL)
Provision Body:
APPLICABLE DESIGNATED SPECIAL PROVISIONS. The following Designated Special Provisions are found in Appendix C and apply to this bid proposal.
DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects.
DSP8. F.A.R. - Required Contract Provisions Federal-Aid Construction Contracts FHWA-1273 (Revised October 23, 2023). Also attached to the Proposal/Contract.
DSP9. Special Supplement - Anti-Pollution Measures - August 26, 1999.
DSP12. Executive Order 11246, with Appendix A and B.
DSP13. Buy America.
DSP15. Commonwealth Standard Terms and Conditions.
DSP16. Lobbying Certification Form. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).
DSP17. Federal Audit Clause.
DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances.
DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities.
Project Specific Details:
Special Provision: G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW Addendum:
CONTRACT PROVISIONS - RIGHT TO KNOW LAW
Provision Body:
May 21, 2026 15:36:14 PM Page 16 of 90
I. Contract Provisions – Right to Know Law 8-K-1532
a. The Pennsylvania Right-to-Know Law (RTKL), 65 P.S. §§ 67.101-3104, applies to this Contract.
b. If the Department needs assistance in any matter arising out of the RTKL related to this Contract, the Department will notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Department.
c. Upon written notification from the Department that it requires assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor will:
1. Provide the Department, within 10 calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Department reasonably believes is Requested Information and may be a public record under the RTKL; and
2. Provide such other assistance as the Department may reasonably request, in order to comply with the RTKL with respect to this Contract.
d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, notify the Department and provide, within 7 calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.
e. The Department will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Department determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Department determine that the Requested Information is clearly not exempt from disclosure, provide the Requested Information within 7 calendar days of receipt of written notification of the Department’s determination.
f. Failing to provide the Requested Information within the time period required by these provisions, indemnify and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of this failure, including any statutory damages assessed against the Department.
g. The Department will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.
h. The Contractor may file a legal challenge to any Department decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, indemnify the Department for any legal expenses incurred by the Department as a result of such a challenge and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of the failure, including any statutory damages assessed against the Department, regardless of the outcome of such legal challenge. As between the parties, agree to waive all rights or remedies that may be available as a result of the Department’s disclosure of Requested information pursuant to the RTKL.
i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and continue as long as the Requested Information remains in the Contractor's possession.
Special Provision: C164A - a00164 CHANGES TO SPECIFICATIONS: SECTION 106
May 21, 2026 15:36:14 PM Page 17 of 90
Header:
CHANGES TO SPECIFICATIONS: SECTION 106
Provision Body:
SECTION 106—CONTROL OF MATERIAL
106.10(a) Buy America Provisions. Revise last paragraph to read as follows:
Products manufactured of foreign steel or iron materials may be used, provided the cumulative cost of such products as they are delivered to the project does not exceed 0.1% of the total contract amount, or $2,500, whichever is greater.
Add 106.11 BUILD AMERICA, BUY AMERICA ACT PROVISIONS.
106.11 BUILD AMERICA, BUY AMERICA ACT PROVISIONS—
(a) Build America, Buy America Act. The Federal Bipartisan Infrastructure Law (Public Law 117-58) includes the Build America, Buy America Act that requires all iron, steel, manufactured products, and construction materials used to be produced in the United States.
The term produced in the United States defined as:
1. Iron or Steel Products. All manufacturing processes from the initial melting stage through the application of coatings occurred in the United States according to Section 106.10(a).
2. Manufactured Product. Final assembly of all manufactured products permanently incorporated into the project must be manufactured in the United States.
2.a A manufactured product, not predominantly steel or iron, is defined as an article, material, or supply that has been processed into a specific form and shape, or combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies.
2.b Predominantly steel or iron is defined as greater than or equal to 50 percent of the total cost of the manufactured product.
2.c Manufactured products that are predominantly steel or iron must comply with Buy America provisions according to Section 106.10(a).
2.d If an article, material, or supply meets this definition but could also be classified as an excluded material or other product category, that article, material, or supply is not a manufactured product.
2.e Mixtures of excluded materials delivered to a work site without final form for incorporation into a project are also not manufactured products.
2.f Manufactured products where the final assembly did not occur in the United States may be used, provided the cumulative cost of such manufactured products is no more than the lesser of $1 million or 5% of total applicable costs for the project.
3. Construction Materials.
3.a All manufacturing processes for construction materials occurred in the United States.
3.b Construction materials includes an article, material, or supply that is or consists primarily of:
non-ferrous metals, plastic and polymer-based products including polyvinylchloride, composite building materials, and polymers used in fiber optic cables, glass including optic glass, lumber, or drywall
May 21, 2026 15:36:14 PM Page 18 of 90
Items that consist of two or more of the listed materials that have been combined together through a manufacturing process, and items that include at least one of the listed materials combined with a material that is not listed through a manufacturing process, should be treated as manufactured products, rather than as construction materials.
3.c Limitation with Respect to Aggregates. Shall not include cement and cementitious materials, aggregates such as stone, sand, or gravel, or aggregate binding agents or additives.
3.d Construction materials where all manufacturing processes did not occur in the United States may be used, provided the cumulative cost of such construction materials is no more than the lesser of $1 million of 5% of total applicable costs for the project.
Special Provision: C166A - a00166 CHANGES TO SPECIFICATIONS: SECTIONS 107 AND 608
CHANGE TO SPECIFICATIONS: SECTIONS 107, AND 608
Provision Body:
SECTION 107—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS. Revise to read as follows:
107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS—Install and maintain erosion and sediment (E&S) pollution control devices as indicated or submit an alternate plan for accomplishing equal or better temporary and permanent erosion and water pollution control. If an alternate plan is submitted, do not start work until the plan is approved by the County Conservation District and the Department. If a National Pollutant Discharge Elimination System (NPDES) Permit is involved, do not start work until the plan is approved by the DEP or the authorized County Conservation District and the Department. Concrete clean out areas, either contractor designed or indicated within the contract documents, are incidental to the contract items.
When a general or individual NPDES Permit is involved:
At the preconstruction conference, submit a Preparedness, Prevention and Contingency (PPC) Plan and identify a licensed professional (Professional Engineer, Geologist, Land Surveyor or Landscape Architect) registered in the Commonwealth and if applicable, their designee to be present onsite and responsible for implementing critical stages of the
Do not start earth disturbance activities until an environmental preconstruction meeting is held with DEP or delegated
CCD.
Within 14 days of completing the construction of a stormwater control measure (SCM) as determined by the licensed professional or designee, submit a completed Chapter 102 SCM Construction Certification Form for each SCM to the Representative through PPCC. Form CS-102 has information required to complete the Chapter 102 Form(s). Ensure the General Project and SCM Information, Construction Information, and Licensed Professional Certification sections are completed by the identified licensed professional responsible for overseeing the critical stages of the approved PCSM plan.
Prepare an as-built (record) PCSM Plan to be sealed and signed by the identified licensed professional registered in the Commonwealth. All construction survey, plan preparation, and engineering required for the as-built (record) PCSM Plan will approved Post Construction Stormwater Management (PCSM) Plan.
May 21, 2026 15:36:14 PM Page 19 of 90 be incidental to the contract items. The as-built (record) PCSM Plan must accurately reflect deviations from the approved PCSM Plan including, but not limited to, plan locations, dimensions, inverts/elevations, materials used and grading. Update the as-built (record) PCSM Plan as construction of the project’s PCSM features progresses. Have the identified licensed professional immediately notify the Representative of all deviations from the approved PCSM Plan. Deviations to the approved PCSM Plan must be submitted for approval. Assist with the determination and documentation if the as-built deviations require a permit amendment or if the PCSM features must be removed and replaced as indicated on the PCSM Plan.
Assist the Representative in performing visual site inspections weekly and after each precipitation event greater than 0.25 inches to ensure the project's E&S Best Management Practices (BMPs) are functioning properly. Immediately initiate corrective actions, at no additional cost to the Department, upon notification by the Representative of noncompliance with the provisions of this section that the Representative has determined requires immediate corrective action under Department policies. For all other notifications of noncompliance, initiate corrective actions within 24 hours. Failure or refusal to promptly comply with such notice upon receipt may, at the Department’s sole discretion, result in: the withholding payment of estimates for work completed until the requirements of the E&S Plan are met, assessment of E&S noncompliance liquidated damages as specified in Section 108.07(d) or issuance of a written order stopping all or part of the work until the corrective action has been taken and the requirements of the E&S Plan are met. No claims for extension of time, costs, or damages arising from, related to, or based upon such notices of noncompliance or stop orders will be granted, paid, or considered.
Nothing in this Section is to be interpreted to relieve the Contractor of its obligation to fully and timely comply with all applicable laws and any permits for the project. The time periods set forth in this Section do not supersede any more stringent time periods required by applicable laws or permits for the project.
If corrective action or noncompliance with the provisions of this Section result from design errors/omissions or a precipitation event exceeding the design storm criteria as specified in applicable Department publications; the cost and/or time required for the performance of the corrective actions for noncompliance notices or stop work orders will be considered as specified in Section 110.03 and Section 108.06, as applicable.
Utilize Department, DEP, or other authorized agency’s form(s) included in the contract or project permits unless directed otherwise by the Representative, DEP, the County Conservation District or other authorized regulatory agency.
For the purpose of determining compliance with the provisions of this section, “substantial completion” will be considered to have been attained when all of the following project milestones have been reached:
Either a semi-final or final inspection has been performed, physical work is complete, and an Environmental Commitments and Mitigation Tracking System (ECMTS) Sheet has been executed if applicable to the project.
Earth disturbance activity has been permanently stabilized and sufficient vegetative growth has been achieved to meet permit conditions (uniform 70% perennial vegetative cover) and agreed to by DEP or delegated CCD.
Installation of PCSM SCMs have occurred if applicable. Upon completion of PCSM conversions and facilities, the County Conservation District must approve the removal of all remaining E&S BMPs.
Once a project with a general or individual NPDES Permit has reached substantial completion, submit to the Representative a DEP Notice of Termination (NOT) Form ensuring Sections 2, 3, 4, 7 and 8, are fully executed. The NOT is to be accompanied by the required as-built (record) PCSM Plan, the final certification by the licensed professional and the Contractor’s executed portion of the ECMTS Construction Tracking Signature Sheet.
608 MOBILIZATION
Section 608.4(b)3. Revise to read as follows:
3. When all physical work has been satisfactorily completed and the following certificates and documents, as required, have been properly furnished, the final payment will be made as specified in Section 608.4(a):
Certified Payroll Records
Final DBE/DB payment amounts and, if necessary, shortfall justification
Material Certifications
Form CS-4225H, Highway Lighting In-Service Guarantee Notification
May 21, 2026 15:36:14 PM Page 20 of 90
As built drawings for Design/Build projects
Form RW-397A, Right to Enter (a property) and Release Form from property owner, if applicable
Form CS-4345, Borrow and/or Waste Management
Contractor Evaluations of the design of the project; and
Work Order Information (i.e. Force Account documentation)
Post Construction Stormwater Management As-built drawings and all documentation required for submission of the Notice of Termination for projects with NPDES permits.
Special Provision: C167A - a00167 CHANGES TO SPECIFICATIONS: APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
Addendum:
CHANGES TO SPECIFICATIONS : APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
Provision Body:
APPENDIX C—DESIGNATED SPECIAL PROVISIONS. Revise to read as follows:
APPENDIX C
DESIGNATED SPECIAL PROVISIONS
General: This appendix to Publication 408 contains standard required provisions. The Contractor shall comply with the below appendices, as applicable.
Standard Documents: Designated Special Provisions (DSPs) that are referenced in this Appendix are:
DSP4. Diverse Business (DB) Requirements for Non-Federally Funded Construction Projects. This provision is applicable to contracts funded with state funds, without federal funds.
DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects. This provision is applicable to any Federally-funded (in part or whole) contract for a construction project.
DSP8. F. A. R.—Required Contract Provisions Federal-Aid Construction Contracts – FHWA-1273 (Revised October 23, 2023). See attachments to the Proposal. This provision is applicable to any federally funded (in part or whole) contract for a construction project.
DSP9. Special Supplement—Anti-Pollution Measures – August 26, 1999. This provision is applicable to all contracts.
DSP12. Executive Order 11246, with Appendices A and B. This provision is applicable to contracts with federal funds (in part or whole).
DSP13. Buy America. This provision is applicable to contracts with federal funds (in part or whole, and to state-funded projects when any federal funds were allocated at any phase of the work on the overall-project but not under the current contract (for example, design), even if the construction contract is 100% state-funded.
May 21, 2026 15:36:14 PM Page 21 of 90
DSP15. Commonwealth Standard Terms and Conditions. This provision is applicable to all contracts.
DSP16. Lobbying Certification Form. This provision is applicable to contracts with federal funds and a contract amount $100,000 or greater. If applicable, the Contractor shall complete this form and return it to PennDOT during contract execution. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).
DSP17. Federal Audit Clause. This provision is applicable to contracts with federal funds. As used in this DSP, “[Name of Subrecipient]” refers to the Contractor.
DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances. This provision is applicable to contracts with federal funds. The Contractor’s signature on an agreement will be deemed a signature on this exhibit.
As used in this DSP, the term “Subrecipient” refers to the Contractor.
DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities. This provision is applicable to contracts with federal funds (in part or whole).
APPENDIX C—DESIGNATED SPECIAL PROVISION 20 (DSP20) FAR 52.240-1 - PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN ENTITIES (NOV 2024). Revise to read as follows:
APPENDIX C
DESIGNATED SPECIAL PROVISION 20 (DSP20)
FAR 52.240-1 -PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED
BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN ENTITIES (NOV 2024)
(a) Definitions. As used in this clause—
American Security Drone Act-covered foreign entity means an entity included on a list developed and maintained by the Federal Acquisition Security Council (FASC) and published in the System for Award Management (SAM) at https://www.sam.gov (section 1822 of the National Defense Authorization Act for Fiscal Year 2024, Pub. L. 118-31, 41 U.S.C. 3901 note prec.).
FASC-prohibited unmanned aircraft system means an unmanned aircraft system manufactured or assembled by an American Security Drone Act-covered foreign entity.
Unmanned aircraft means an aircraft that is operated without the possibility of direct human intervention from within or on the aircraft (49 U.S.C. 44801(11)).
Unmanned aircraft system means an unmanned aircraft and associated elements (including communication links and the components that control the unmanned aircraft) that are required for the operator to operate safely and efficiently in the national airspace system (49 U.S.C. 44801(12)).
(b) Prohibition. The Contractor is prohibited from—
(1) Delivering any FASC-prohibited unmanned aircraft system, which includes unmanned aircraft (i.e., drones) and associated elements (sections 1823 and 1826 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.);
(2) On or after December 22, 2025, operating a FASC-prohibited unmanned aircraft system in the performance of the contract (section 1824 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.); and
(3) On or after December 22, 2025, using Federal funds for the procurement or operation of a FASC-prohibited unmanned aircraft system (section 1825 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.).
(c) Procedures. The Contractor shall search SAM at https://www.sam.gov for the FASC-maintained list of American Security Drone Act-covered foreign entities prior to proposing, or using in performance of the contract, any unmanned aircraft system. Additionally, the Contractor shall ensure any effort or expenditure associated with a FASC-prohibited unmanned aircraft system is consistent with a corresponding exemption, exception, or waiver determination expressly stated in the contract.
(d) Exemptions, exceptions, and waivers. The prohibitions in this clause do not apply where the agency has determined an exemption, exception, or waiver applies and the contract indicates that such a determination has been made. [See sections 1823
May 21, 2026 15:36:14 PM Page 22 of 90 through 1825 and 1832 of Public Law 118-31 (41 U.S.C. 3901 note prec.) for statutory requirements pertaining to exemptions, exceptions, and waivers.].
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.
Special Provision: C168A - a00168 CHANGES TO SPECIFICATIONS: SECTIONS 110, 404, AND 507
CHANGE TO SPECIFICATIONS: SECTIONS 110, 404, AND 507
Provision Body:
SECTION 110—PAYMENT
Section 110.06 MATERIAL STORED OR ON HAND. Revise to read as follows:
110.06 MATERIAL STORED OR ON HAND—
(a) Stored Material. The Representative may authorize payment for certain material, using Form CS-110, before its incorporation into the work. Upon the Contractor's request submitted through the PennDOT Project Collaboration Center’s (PPCC) Material-Stored Material (CS-110) workflow and the Representative's acceptance in PPCC, the Contractor may be paid 100% of the cost of the material, less the pro‑rata share of the retainage, if any; provided the quantity of stored material does not exceed the total estimated quantity required to complete the project and the cost is at least $1,000 but does not exceed 90% of the contract price of the applicable contract item or component item. Load-Transfer Units are only eligible for 90% of the cost of the material. The cost of the material is that amount to be paid by the Contractor as evidenced by invoices. Fabricated structural steel that is to receive a protective coating may be approved for prepayment at 75% of the contract price of the applicable contract item or component item, before application of the coating, provided the structure has been fully fabricated and preassembly of field connections has been made.
Payment for stored material will not be authorized until the material has been delivered to the project site or an approved location in the vicinity of the project, is inspected by the Representative to ensure the material is in a satisfactory condition and of sufficient quantity, is stored in an approved manner, and conforms to the requirements specified in this Section and Section 106.03. Identify stored material by project designation and set apart from other materials. Fabricated precast/prestressed bridge structure elements indicated on an S-number structure plan are eligible for prepayment when they are approved to ship. Other materials to be stored less than 30 days are not eligible for prepayment. In determining eligibility for prepayment, the beginning date for evaluating whether the required 30-day minimum storage period will be met will be the date the material is delivered to the project or approved storage location, or the date the invoice is submitted to the Department, whichever is the latter. Material originally determined to be ineligible for prepayment due to the minimum storage period requirement, that is then stored for more than 30 days, is eligible for prepayment on the next estimate, provided the invoice has been submitted to the Department. If the Representative determines, because of required fabrication at an off‑site location, that it is not feasible or practicable to store material in the vicinity of the project, the material may be stored at an approved location, which is not in the vicinity of the project, at the Contractor’s expense.
With the exception of structural steel to be incorporated into fabricated structural steel components for main bridge members, as specified in Section 110.06(a)1., only end product manufactured material or fully fabricated products that are awaiting installation and/ or incorporation into the finished work are eligible for prepayment. Ingredients of a finished product are not eligible for prepayment.
Aggregates, cements, and other bulk material are not eligible for prepayment. Beams containing precast components or secondary precast elements detailed on the structure component item schedule or both are eligible for prepayment. Living or perishable plant materials are not eligible for prepayment before planting.
Assume full control and responsibility for the protection of the stored material from the elements and against loss or damage by any cause. In the event any stored material becomes lost, stolen, impaired, or damaged while stored, the monetary value of the lost, May 21, 2026 15:36:14 PM Page 23 of 90 stolen, impaired, or damaged material as may have been paid for in a current estimate will be deducted from a subsequent estimate.
Retain the title to the prepaid material until issuance of the acceptance certificate.
Payment for acceptable stored material will be made on current estimates against the applicable contract item. The amount paid will be proportionately recouped as the material is incorporated into the work. The cost of surplus stored material previously paid on a current estimate but not ultimately incorporated in the final measured work will not be included in the final payment. Surplus stored material is the property of the Contractor. Remove surplus material from the project and dispose of in a satisfactory manner.
Pay the material provider the amount due, as shown on the invoices within 7 calendar days of receipt of payment from the Department. Provide evidence of payment upon request. Failure to make invoice payments as specified will cause the appropriate monies to be deducted from future estimates and will cause the disapproval of further prepayment requests.
1. Prepayment for Structural Steel. Structural steel to be incorporated into fabricated structural steel components for main bridge members may be approved for payment up to 60% of the contract price of the applicable contract item or component item; provided the quantity, cost, delivery, inspection, and storage requirements of Section 110.06(a) are met. The cost of the structural steel is that amount to be paid by the Fabricator as evidenced by invoices. Invoices for approved structural steel are to include the material quantity and Department project identification (i.e., ECMS number, SR & Section, and county), and must be accompanied by certification, as specified in Section 106.03(b)3., and proof of payment (e.g., a copy of a canceled check or receipt, or a certified letter from the structural steel supplier acknowledging receipt of payment).
Payment for approved structural steel will be made on current estimates against the applicable contract item. The amount paid will be proportionately recouped as the fabricated structural steel components are incorporated into the work. Pay the Fabricator the amount due, as shown on the invoices, within 7 calendar days of receipt of payment from the Department. When payment is made, the structural steel becomes the property of the Department. Have the Fabricator furnish a transfer of ownership document within 7 calendar days of receipt of payment and promptly submit the documentation to the Department.
Only approved structural steel to be incorporated into fabricated structural steel components for main bridge members is eligible for prepayment. Handling, transportation, and storage of structural steel materials including, but not limited to, any storage site rental, security, and weather protection, are to be borne by the Contractor and included in the contract price for the applicable contract item.
SECTION 404—EVALUATION OF ASPHALT PAVEMENT RIDE QUALITY AND PAYMENT OF INCENTIVE
Section 404.1 DESCRIPTION. Revise to read as follows:
404.1 DESCRIPTION. This work evaluates an asphalt pavement surface profile and determines the ride-quality incentive associated with the pavement surface profile.
(a) General Requirements. Determine the ride quality of finished pavement surfaces, including overlaid bridge approach slabs and overlaid bridge decks.