This Invitation for Bids (IFB) #26-0039 is issued by the City of Fredericksburg, Virginia for the removal and installation of concrete driveway and sidewalk at Fire Station 2, located at 101 Altoona Drive, Fredericksburg, VA 22401. The scope of work includes removal of existing 8-inch concrete pavement and curb/gutter, installation of a 12-inch aggregate subbase (VDOT 21A/B) and 8-inch air-entrained, macrofiber-reinforced concrete (4000 PSI) for the northern driveway in two phases to maintain emergency access; removal and replacement of existing rear concrete sidewalk with 4-inch thick concrete (3,500 PSI microfiber-reinforced) over 4-inch VDOT 21A/B stone; and provision of 26 cubic yards of undercut soft soil removal and replacement with unit rates for change orders. An optional pre-bid conference is scheduled for May 27, 2026 at 2:00 P.M. at Fire Station 2. Sealed bids are due June 15, 2026 by 2:00 P.M. EST to the City Manager's Office, with public opening at 2:05 P.M. in City Hall's second-floor conference room. Written clarification requests must be submitted by June 3, 2026 by 2:00 P.M. EST. The contract term will be mutually agreed upon in writing between the City and Contractor at the time the Notice to Proceed is issued, with work to commence within ten days of that notice and substantial completion required within the agreed timeframe.
The City will make award on a total sum basis to the lowest responsive and responsible bidder. Liquidated damages are assessed at $500.00 per calendar day for failure to complete work within the specified contract time. The bid must include a Virginia Contractor's License (Class A, B, or C depending on contract value), and the contractor must maintain Commercial General Liability insurance of $1,000,000 per occurrence and $2,000,000 aggregate, with the City named as additional insured. All materials must be guaranteed against defects for 10 years following delivery. The contractor shall coordinate field quality control testing with the City's Field Quality Control contractor, and a special inspector engaged by the Owner will perform field tests and inspections. Monthly partial payments will be made with 5 percent retainage until project completion, and final payment will be made within 90 days after submission of evidence that all payrolls, material bills, and other costs have been paid in full and the work has been accepted by the Owner. No specific contract value or set-aside provisions are stated in the solicitation documents.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Fredericksburg
715 Princess Anne Street, Fredericksburg, VA 22401 INVITATION FOR BIDS (IFB) #26-0039 Fire Station 2 Concrete Removal and Installation Commodity Code: 91347 Construction, Sidewalk and Driveway (Includes Pedestrian and Handicap Ramps) Issue Date: May 15, 2026 • Due Date/Time: June 15, 2026 – 2:00 P.M. (EST)
Procurement Officer: Josh McCormack / E-mail Address:
ljmccormack@fredericksburgva.gov
Rachel Jones / E-mail Address: rmjones@fredericksburgva.gov BID SUBMISSION: All bids must be received by the date and time shown on the cover page of this solicitation at the following address. Any bids received after the stated time and date will not be considered. Delivery address: City of Fredericksburg, City Manager’s Office, Attn. Josh McCormack, Procurement Manager, or Rachel Jones, Procurement Specialist, 715 Princess Anne Street, Fredericksburg, VA 22401.
CLARIFICATION OF TERMS: If any prospective Bidder has questions about the specifications or other solicitation documents, then it is the Bidder’s responsibility to contact the Procurement Officer in writing, no later than June 3, 2026, 2:00 P.M. (EST). Oral requests for information will not be accepted. No further written inquiries will be accepted after this time. Any revisions to the solicitation will be made only by an addendum issued by the Procurement Officer.
Any addenda, notifications, extensions, cancellations or changes will be posted prior to the due date and time on the City’s website at www.fredericksburgva.gov and the Commonwealth of Virginia procurement portal at www.eva.virginia.gov. No other notification will be provided. It is the responsibility of the prospective Bidder to obtain all current information.
An Optional Pre-Bid Conference will be held at 2:00 P.M. on May 27, 2026 at the Fire Station 2 (101 Altoona Drive, Fredericksburg, VA 22401).
TERM OF CONTRACT: The term of the contract will be mutually agreed upon, in writing, between the City and the Contractor at the time the Notice to Proceed is issued.
The undersigned hereby offers and agrees to furnish all goods and/or services in accordance with the attached signed bid and the mandatory requirements outlined herein, or as mutually agreed upon through subsequent negotiation.
Company Name: Email:
Address: Telephone:
City/State/ZIP Fax:
Signature: Cell:
Printed Name: UEI Number:
Title: eVA Vendor ID:
mailto:ljmccormack@fredericksburgva.gov mailto:rmjones@fredericksburgva.gov http://www.fredericksburgva.gov/ http://www.eva.virginia.gov/
Date: Vendor SCC
ID:
NOTE: This public body does not discriminate against faith-based organizations in accordance with the Code of Virginia, §2.2-4343.1 or against a Bidder because of race, religion, color, sex, national origin, age, disability, or any other basis prohibited by state law relating to discrimination in employment.
SECTION I - ADVERTISEMENT FOR BIDS
Sealed bids for “Fire Station 2 Concrete Removal and Installation” will be received by the City of Fredericksburg, Finance/Procurement Office, City Hall, Fredericksburg, VA, until 2:00 p.m., June 15, 2026. The preferred method of delivery is by courier (Post/UPS/FedEx). All in person deliveries must be scheduled with the Purchasing Manager. The bids will be publicly opened and read on June 15, 2026 at 2:05 p.m. in the second-floor conference room of City Hall, 715 Princess Anne St, Fredericksburg, VA 22401.
Contact Josh McCormack (ljmccormack@fredericksburgva.gov) or Rachel Jones (rmjones@fredericksburgva.gov) for by email further information. All requests for clarification or questions regarding this bid must be received no later than 2:00 p.m. on June 3, 2026. All posted clarifications or addenda must be signed and accompany any bid submitted.
PREBID CONFERENCE: An Optional Pre-Bid Conference will be held at 2:00 P.M. on May 27, 2026 at the Fire Station 2 (101 Altoona Drive, Fredericksburg, VA 22401).
mailto:ljmccormack@fredericksburgva.gov mailto:rmjones@fredericksburgva.gov
SECTION II – STATEMENT OF WORK
I. PURPOSE
The City of Fredericksburg (“City” or “Owner”) is conducting a solicitation for the removal and installation of the concrete driveway and sidewalk at Fire Station 2. The station is located at 101 Altoona Drive, Fredericksburg, VA 22401.
II. SCOPE OF WORK
I. Removal of the existing 8” concrete pavement and associated curb and gutter.
Removal of existing aggregate and subgrade to establish the required pavement section of 12” aggregate subbase (Virginia Department of Transportation [VDOT] 21A/B) and 8” air entrained, macrofiber reinforced concrete (4000 pound-force per square inch [PSI]) pavement for the existing northern driveway. The dosage for Macrofibers will be five (5) pounds per cubic yard. This will be in two (2) phases to allow access for the emergency crew.
II. Removal and replacement of the existing concrete sidewalk at the rear of the Fire Station not to include the section below the outdoor mechanical unit. The sidewalks will be four (4) inches thick, placed over 4-inch minimum of VDOT 21A/B Stone. VDOT #57 is not acceptable. The concrete must be minimum 3,500 PSI microfiber reinforced concrete.
III. For bidding, General Contractor shall include 26 cubic yards of undercut of soft soils and replacement with VDOT 21A. To include providing unit rate for both such that price is established for additional or subtractive change orders.
IV. General Contractor to coordinate all Field Quality Control testing with the City’s Field Quality Control contractor.
V. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare testing and inspection reports.
a. Soils:
i. Subgrade Preparation
1. For the repair of the driveway lanes, we recommend the concrete and stone be removed full depth and replaced. The existing granular subbase material may be stock-piled and reused for the new pavement sections. The subgrade preparation should consist of stripping any soft or unsuitable materials from the proposed pavement areas.
2. After stripping, the stripped surface should be observed by an experienced Geotechnical Engineer or their authorized representative. Proof rolling using appropriate sized equipment selected by the geotechnical engineer, may be used at this time to aid in identifying localized soft or unsuitable materials that should be removed. Any soft/loose or unsuitable material encountered during this proof rolling should be removed to a stable subgrade and replaced with an approved backfill compacted to the criteria given below. Once subgrade stability has been achieved, final subgrade preparation should include crowning (i.e., higher in the middle and lower at the edges) to provide positive drainage of water away from the pavement subgrade for the life of the pavement. Further details of concerning crowning and pavement drainage are included in the Pavement Drainage section below.
3. Site subgrade conditions will be significantly influenced by weather conditions. Subgrades that are evaluated after periods of rainfall will not respond as well to proof rolling as subgrades that are evaluated after periods of more favorable weather. We strongly recommend that rubber tire equipment not be used if subgrade conditions exhibit elevated moisture conditions. The contractor should use tracked equipment to minimize the degradation of marginally stable subgrade. Depending on the time of year construction proceeds, moisture conditioning (drying) of the material may be required. In addition, water is likely to perch at the surface after rain events;
therefore, positive site drainage will be important to prevent isolated soft areas from developing.
ii. Fill Placement
1. Engineered fill should be an approved dense graded aggregate such as VDOT 21A. Fill should be placed in loose lifts not exceeding thickness noted in table below and moisture conditioned to within ±3 percentage points of the optimum moisture content. We recommend that each lift be compacted to a minimum of 95% of the maximum dry density obtained in accordance with the Standard Proctor (ASTM D698).
Equipment Maximum Loose Lift Thickness (inches)
Large, Self-propelled Equipment (Cat 815K, Cat CS44B 9
Small, Self-propelled or Remote Controlled (Rammax, etc.)
Hand operated (Plate Tamps, Jumping Jacks, Wacker- Packers)
3-6
2. Depending on the time of year construction proceeds, moisture conditioning (drying) of the surface material may be required. In addition, water is likely to perch at the surface after rain events; therefore positive site drainage will be important to prevent isolated soft areas from developing. Pumping of any perched areas of water should be performed following rain events to promote drying of the materials.
3. All fill operations should be observed on a full-time basis by an authorized representative of the Geotechnical Engineer of Record to determine that compaction requirements are being met. All fill shall be periodically tested to confirm that compaction is being achieved. A sufficient number of tests shall be taken in each lift before the next lift is placed, on the order of at least one test per 2,500 PSF of area on each lift. The elevation and location of the tests should be clearly identified and recorded at the time of fill placement.
4. All fill materials should be graded to facilitate positive drainage away from pavement areas to eliminate any standing water associated with precipitation and surface run-off. Fill materials shall not be placed on frozen soils or frost-heaved soils and/or soils which have been subjected to precipitation. All frozen soils should be removed prior to continuation of fill operations. Borrow fill materials shall not contain frozen materials at the time of placement. All frost-heaved soils should be removed prior to placement of controlled, compacted fill, granular subbase materials, foundation concrete, or concrete and/or asphaltic pavement materials.
iii. Exterior Pavements
b. Concrete
i. Batch Tickets: For each load delivered, submit three copies of batch delivery ticket to testing agency, indicating quantity, mix identification, admixtures, design strength, aggregate size, design air content, design slump at time of batching, and amount of water that can be added at Project site.
ii. Inspections/Submittals:
1. Design mixes
2. Macrofiber and microfiber
3. Curing agents, based on Euclid Kurez DR.
4. Concrete placement, including conveying and depositing
5. Curing procedures and maintenance of curing temperature
6. Verification of concrete strength before application of working loads
iii. Concrete Tests: Testing of composite samples of fresh concrete obtained in accordance with ASTM C 172/C 172M shall be performed in accordance with the following requirements:
iv. Testing Frequency: Obtain one composite sample for each day's pour of each plus one set for each additional 25 cu. yd. or fraction thereof.
1. When frequency of testing provides fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used.
v. Slump: ASTM C143/C143M:
1. One test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture.
2. Perform additional tests when concrete consistency appears to change.
vi. Air Content: ASTM C231/C231M pressure method, for normal-weight concrete;
1. One test for each composite sample, but not less than one test for each day's pour of each concrete mixture.
vii. Concrete Temperature: ASTM C1064/C1064M:
1. One test hourly when air temperature is 40 deg F and below or 80 deg F and above, and one test for each composite sample.
viii. Unit Weight: ASTM C567/C567M fresh unit weight of structural lightweight concrete.
1. One test for each composite sample, but not less than one test for each day's pour of each concrete mixture.
ix. Compression Test Specimens: ASTM C31/C31M:
1. Cast and laboratory cure two sets of at least six (6) 4-inch by 8-inch cylinders specimens for each composite sample.
x. Compressive-Strength Tests: ASTM C39/C39M.
1. Test one set of two laboratory-cured specimens at seven days and one set of three specimens at 28 days.
2. A compressive-strength test shall be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated
xi. Strength of each concrete mixture will be satisfactory if every average of any three consecutive compressive-strength tests equals or exceeds specified compressive strength, and no compressive-strength test value falls below specified compressive strength by more than 500
xii. Additional Tests:
1. Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by the City’s Field Quality Control contractor.
2. Testing and inspecting agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C42/C42M or by other methods as directed by the City’s Field Quality Control contractor. .
a. Acceptance criteria for concrete strength shall be in accordance with ACI 301 section 1.6.6.3.
xiii. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
xiv. Correct deficiencies in the Work that test reports and inspections indicate do not comply with the Contract Documents.
VI. Liquidated Damages
a. That the Contractor shall commence Work within ten (10) days after Notice to Contractor to Proceed with the Work under Contract (“Notice to Proceed”), and shall substantially complete the Work within the Contract Time mutually agreed upon by the City and Contractor, in writing, at the time of the Notice to Proceed is issued. Owner and Contractor recognize that time is of the essence of this Contract and that the Owner will suffer financial loss if the Work is not completed within the times specified in the Notice to Proceed, plus any extensions thereof.
They also recognize the delays, expense and difficulties involved in providing the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for certain losses Owner is expected to suffer due to delay (but not as a penalty) Contractor shall pay $500.00 for each calendar day that expires after the time specified for completion. If the Contractor is subject to liquidated damages, the City has the right, but not the obligation, to withhold the liquidated damages from the Contractor’s regular payments. Rights and obligations relating to these liquidated damages are set out more fully in the Special Terms and Conditions.
SECTION III – Terms and Conditions
I. GENERAL TERMS AND CONDITIONS
The headings below are for general reference purposes only and shall have no effect on the interpretation of these General Terms and Conditions.
A. Assignment. Contractor will not assign or otherwise transfer any of its rights, obligations, or interests in this contract without the written permission of the City.
B. Authorization to do Business in Virginia. Contractor is authorized to do business in Virginia as a domestic or foreign business entity under Title 13.1 or Title 50 of the Virginia Code, or as otherwise required by law. Contractor will not allow its existence to lapse or its certificate of authority or registration to do business in Virginia to be revoked or cancelled during the term of this contract. Contractor’s violation of this requirement shall be grounds for immediate termination of contract at no penalty to the City.
C. Choice of Law, Venue. This contract is governed by Virginia law. The Circuit Court of the City of Fredericksburg, Virginia, is the exclusive venue for any litigation regarding this contract.
D. Claims. Contractor must notify the City in writing of its intention to file a claim at the time of the occurrence or beginning of the work upon which the claim is based. All claims must be submitted less than 60 days after the final contract payment.
E. Complete Agreement. This Contract sets forth all of the promises, contracts, conditions, and understandings between the parties respecting the subject matter hereof an supersedes all prior and contemporaneous negotiations, conversations, discussions, correspondence, memoranda, and contracts between parties concerning such subject matter.
F. Default.
a. The City is in default 1) if it fails to pay any amount due to Contractor; or 2) upon any other material failure to comply with the terms of the contract. Contractor is in default upon any material failure to comply with the terms of the contract.
b. A party alleging that the other party is in default must provide the allegedly defaulting party with written notice specifying the alleged default and allow 30 days for the default to be cured.
c. Remedies for Default. If the City does not cure a default within 30 days after receiving notice, Contractor may a) terminate this contract, and b) exercise all remedies available at law. If the Contractor does not cure a default within 30 days after receiving notice, the City may a) terminate the contract, b) exercise all remedies available at law, and c) collect liquidated damages if available under Special Contract Terms. If the default is a failure to Provide required goods or services, the City may, upon written notice to Contractor, procure those goods or services from other sources and hold Contractor responsible for any resulting additional purchase and administrative costs.
G. Dispute Resolution. The parties will first endeavor to resolve any disputes, claims, or other matters in question between them through direct negotiations, and if direct negotiations fail, by non- binding mediation, with the exclusive venue of the mediation being the City of Fredericksburg. Should the dispute remain unresolved either (i) following negotiation and mediation, or (ii) more than 90 days after a party has requested mediation, either party may institute a lawsuit or chancery action, as appropriate, in Fredericksburg Circuit Court, and may pursue all available appeals in Virginia state courts, to the extent they have jurisdiction. Any agreement reached in mediation must be reduced to writing and executed by the parties; upon execution, the agreement will be enforceable as a settlement agreement.
H. Drug-Free Workplace. Contractor agrees to (i) provide a drug-free workplace for the contractor’s employees; (ii) post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in Contractor’s workplace and specifying the actions that will be taken against employees for violating that prohibition; (iii) state in all solicitations or advertisements for employees placed by or on behalf of Contractor that Contractor maintains a drug-free workplace; and (iv) include the terms of this section in every subcontract or purchase order of over $10,000, so that the terms will be binding upon each subcontractor and vendor.
I. Ethics in Public Contracting. Contractor certifies that its offer is made without collusion or fraud and that it has not offered or received any kickbacks or inducements from any other offeror, supplier, manufacturer, or subcontractor and that it has not conferred on any public employee having official responsibility for this purchase any payment, loan, subscription, advance, deposit of money, services, or anything of more than nominal value, present or promised unless consideration of substantially equal or greater value was exchanged.
J. Faith-based Organizations. The City shall not discriminate against faith-based organizations. A faith-based organization contracting with the City (i) shall not discriminate against any recipient of goods, services, or disbursements on the basis of the recipient's religion, religious belief, or refusal to participate in a religious practice or on the basis of race, age, color, gender, sexual orientation, gender identity, or national origin and (ii) shall be subject to the same rules as other organizations that contract with the City to account for the use of the funds provided; however, if the faith-based organization segregates public funds into separate accounts, only the accounts and programs funded with public funds shall be subject to audit by the public body. Nothing in clause (ii) shall be construed to supersede or otherwise override any other applicable state law. Neither the City's selection of a charitable or faith-based provider of services nor the expenditure of funds under this contract is an endorsement of the provider's charitable or religious character, practices, or expression. (Va. Code § 2.2-4343.1)
K. Force Majeure. No party to this Agreement shall be liable or responsible to the other party for any failure, interruption, or delay in fulfilling any of its obligations under this agreement, due to events beyond the affected party’s control, including natural disaster, act of God, war, armed conflict, pandemic, epidemic, public health crisis, or state of emergency, provided that the affected party gives the other party prompt written notice of the occurrence of the event, stating the period of time the occurrence is expected to continue. The affected party shall use diligent efforts to end the failure, interruption, or delay and ensure the effects of the Force Majeure Event are minimized.
L. Freedom of Information Act. All records pertaining to this contract are open to inspection by the public under the Virginia Freedom of Information Act (Virginia Code § 2.2-3700 et. seq) unless specifically exempted under the Act (including records properly exempted under Code of Virginia § 2.2-4342).
M. Immigration. Contractor does not, and will not during the performance of this contract, knowingly employ an unauthorized alien as defined in federal Immigration Reform and Control Act of 1986. Contractor will register for and participate in the federal E-Verify Program if required to do so under Code of Virginia § 2.2-4308.2.
Contractor will provide the City with a copy of their E-Verify “Maintain Company” page to the City upon request. Failure to comply with E-Verify requirements subjects Contractor to automatic disbarment from City procurement until the requirements are met.
N. Indemnification. Contractor will save, defend, hold harmless, and indemnify the City, and all of its elected and appointed officials, officers, employees, agents, departments, agencies, boards, and commissions from and against any and all claims, losses, damages, injuries, fines, penalties, costs (including court costs and attorney's fees), charges, liability, or exposure, however caused, resulting from, arising out of, or in any way connected with Contractor's negligent acts, errors or omissions, recklessness or intentionally wrongful conduct of the Contractor in performance or nonperformance of its work under the contract. This indemnification survives the termination of the contract.
O. Insurance. Contractor and any subcontractors will maintain the following insurance coverage, provided by insurance companies authorized by the Virginia SCC to offer insurance in Virginia, during the entire term of the contract. Contractor will provide copies of its Certificates of Insurance to the City.
a. Workers’ Compensation—as required by law.
b. Employer’s Liability--$100,000.
c. Commercial General Liability--$1,000,000 per occurrence and $2,000,000 in the aggregate. The City must be named as an additional insured on this policy.
d. Automobile Liability-- $1,000,000 combined single limit, if any motor vehicle not owned by the City is to be used in performance of the contract.
P. Licensing. Contractor will maintain all licenses and certifications required by applicable federal, state, and local governmental entities for provision of the goods and services to be provided under this contract.
Q. Modifications. Contractor shall not require any employee or agent of the City other than the City Manager or Purchasing Agent to execute any additional contract, license, or other agreement pertaining to this contract. Only the City Manager or City Purchasing Agent may modify this contract on behalf of the City. Only the original signatory of the contract on behalf of Contractor, or another individual authorized in writing by Contractor to modify the contract, may modify the contract on behalf of Contractor. Modifications to this contract can only be authorized in accordance with Code of Virginia § 2.2-4309. Modifications can only be authorized by the following methods:
a. City and Contractor may agree in writing to modify the terms of the contract. Any additional goods or services to be provided must be of a sort that is ancillary to, or within the same broad product or services categories as those provided for in the original contract.
b. The City may issue written change orders for changes such as services to be performed, methods of packing or shipping, and place of delivery or installation.
If Contractor determines that the change order will not necessitate a change in compensation or schedule, Contractor will comply with the change order upon receipt. If Contractor determines that the change order will necessitate a change in compensation or schedule, Contractor will notify the City of that determination and only proceed to comply with the change order upon the City’s written approval.
R. Non-Appropriation. All funds for payments after June 30 of the current fiscal year are subject to appropriation by the City Council. If Council does not appropriate the required funds, this contract and all obligations hereunder shall automatically terminate effective as of close of business on June 30 of the then-current fiscal year, with the exception that the City’s obligation to pay for goods or services received prior to such termination shall survive such termination. Non-appropriation shall not be grounds for recovery against the City.
S. Non-Discrimination.
a. Contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where there is a bona fide occupational qualification reasonably necessary to the normal operation of the contractor. Contractor will post in conspicuous places, available to employees and applicants for employment, notices stating the terms of this section.
b. Contractor, in all solicitations or advertisements for employees placed by or on behalf of the contractor, will state that the contractor is an equal opportunity employer.
c. Notices, advertisements, and solicitations placed in accordance with federal law, rule, or regulation are sufficient for the purposes of this section.
d. Contractor will include the terms of this section in every subcontract or purchase order of over $10,000, so that the terms will be binding upon each subcontractor and vendor.
e. Contractor will conform to the Federal Civil Rights Act of 1964, the Virginia Fair
Employment Contracting Act of 1975, the Virginians with Disabilities Act, and § 2.2- 4343.1E of the Virginia Public Procurement Act.
T. No Representation. Any payment the City makes to Contractor shall not be deemed to represent that the City has made an exhaustive or continuous inspection to confirm the work conforms to contract requirements. No payment by the City shall constitute an acceptance of any work that is defective or otherwise not in accordance with the contract.
U. Notices. Any notices pertaining to this contract must be sent by first-class mail to:
To the City:
Fredericksburg City Manager 715 Princess Anne Street Fredericksburg, Virginia 22401
To the Contractor:
The address listed on Contractor’s Proposal or Bid. Either party may change its address for notices by notifying the other party in writing of the change.
V. Payments to Contractor.
a. Contractor must provide its federal employer identification number and VA W-9 to the City before requesting payment.
b. Contractor will submit itemized invoices, with appropriate documentation, to the City, at the payment address shown on the purchase order or contract. All invoices must show the City contract or purchase order number and Contractor’s federal employer identification number. No invoice may include any cost other than those listed in the contract or in an individual purchase order referencing the contract.
c. The City will pay invoices within 30 days of receipt. Any payment terms stated by Contractor requiring payment in less than 30 days will be regarded as requiring payment 30 days after the date of receipt of the invoice by the City or the date of delivery of the goods or services, whichever occurs last. This provision shall not affect offers of discounts for payment in less than 30 days.
d. Any invoice not paid within 30 days will accrue 1% interest per month. When payment is made by mail, the date of the postmark will be considered the date of payment. If offset proceedings have been instituted under the Virginia Debt Collection Act, the date of offset will be considered the date of payment.
e. Under certain emergency procurements and for most time and material purchases, final job costs cannot be accurately determined at the time an order is placed. In these cases, payments are contingent on the City’s determination that all invoiced charges are reasonable. The City will notify Contractor within 30 days of invoice of any charges it determines to be unreasonable. Payment for those charges will be suspended until a settlement is reached. Contractor will not take legal action concerning the charges unless a settlement is not reached within 30 days of notification.
W. Prime Contractor and Subcontractors. Contractor has prime responsibility for all services and goods to be provided under this contract, specifically including adequate supervision of work to be performed. This contract is only between Contractor and the City, and Contractor accepts full responsibility for the work performed and goods provided by, and the acts and omissions of, its subcontractors. Contractor will not subcontract for any part of this contract without the advance written permission of the City Purchasing Agent. Contractor will provide the names, qualifications, and experience of any proposed subcontractors to the City Purchasing Agent.
X. Prime Contractor Payments to Subcontractors.
a. Contractors shall require their individual subcontractors to provide their social security numbers and proprietorship, partnership, and corporate subcontractors to provide their federal employee identification numbers.
Contractor will provide this information to the City upon request.
b. Contractor must include in its contracts with subcontractors a provision requiring each subcontractor to include or otherwise be subject to the same payment and interest requirements with respect to each lower tier subcontractor as that contained in this section.
c. Contractor will pay interest of 1% per month to subcontractors on all amounts owed to the subcontractors which have not been paid or withheld under the terms of this section.
d. Within 7 days after receipt of payment by the City for work performed by a subcontractor, Contractor shall a) pay the subcontractor for the proportionate share of the total payment received from the City attributable to the subcontractor’s work, or b) notify the City and the subcontractor, in writing, of Contractor’s intention to withhold payment and the reason for withholding the payment.
e. Notwithstanding the foregoing, for construction contracts in the event that the contractor has not received payment from the City for work performed by a subcontractor under such contract, contractor shall be liable for the entire amount owed to such subcontractor and to pay such subcontractor within 60 days of the receipt of an invoice following satisfactory completion of the work for which the subcontractor has invoiced. Such contractor shall not be liable for amounts otherwise reducible due to the subcontractor's noncompliance with the terms of the contract. However, in the event that the contractor withholds all or a part of the amount invoiced by the subcontractor under the terms of the contract, the contractor shall notify the subcontractor within 50 days of the receipt of such invoice, in writing, of his intention to withhold all or a part of the subcontractor's payment with the reason for nonpayment, specifically identifying the contractual noncompliance, the dollar amount being withheld, and the lower-tier subcontractor responsible for the contractual noncompliance. Payment by City shall not be a condition precedent to contractor’s obligation to pay lower-tier subcontractors. Any provision in a construction contract contrary to this section shall be unenforceable. Nothing in this subdivision shall be construed to (i) apply to or prohibit the inclusion of any retainage provisions in a construction contract or (ii) apply to contracts awarded solely for professional services as that term is defined in Va. Code § 2.2-4301 where the public body is contracting directly with an architectural and engineering firm.
Y. Records Retention. Contractor will retain all records related to this contract for 5 years after final payment or until audited by the City, whichever comes first. The City may inspect these records upon reasonable notice to Contractor.
Z. Relation to City. Contractor is an independent contractor of the City and shall not be deemed an agent of the City for any purpose whatsoever. This contract does not create an employment relationship between the City and Contractor or any of its employees.
AA. Renewal or Extension. The contract may be renewed only if provided for in the description of the contract term. If this contract is for services, it may be extended by written agreement of the parties only for the purpose to allow completion of any work undertaken but not completed during the original term of the contract.
BB. Severability. If any provision of this agreement is determined to be invalid, illegal or unenforceable, the remaining provisions of the agreement remain in full force, if the essential terms and conditions of the agreement for each party remain valid, binding, and enforceable.
CC. Sovereign Immunity. Nothing in this Contract shall be construed as an express or implied waiver of the city’s sovereign or Eleventh Amendment immunity, as a political subdivision of the commonwealth.
DD. Strict Performance. The failure of a party to insist upon the other party’s strict performance of the terms of the contract is not a waiver of the right to insist upon strict performance of those terms at a later time.
EE. Survival. Contract provisions regarding indemnification and recovery of damages for deficient contract performance shall survive the completion or earlier termination of the contract.
FF. Tax Exemption. The City is exempt from State sales tax. State sale and use tax certificates of exemption will be issued upon request.
GG. Termination. The City may terminate this contract for any reason upon 30-day prior written notice to Contractor. The City will promptly pay all amounts already earned by Contractor and reasonable expenses incurred in reliance upon the contract, up to the effective date of the termination. Receipt of the notice does not affect Contractor’s obligations under the contract, including fulfillment of outstanding orders, up to the effective date of termination. The parties can, by written agreement, terminate this contract at any time.
II. SPECIAL TERMS AND CONDITIONS
A. Definitions.
a. Owner.
i. The Owner is the City of Fredericksburg, Virginia ("City"). The term Owner means the Owner or its authorized representative. The Public Facilities Department Director is the authorized Owner's representative for this Contract.
Notwithstanding the foregoing, the authority of the Owner's representative is subject to the limitations in the Fredericksburg Public Procurement Code.
ii. The Public Facilities Department Director will designate a single Owner's representative with the title of Project Manager (PM), who will have the power to act, within the scope of his delegated authority, for and on behalf of the Owner, in accordance with the terms of the Contract Documents.
iii. For purposes of any change in the Work, the term "Owner" or "Owner's representative" specifically excludes any and all inspectors having building code or City ordinance responsibilities or jurisdiction under the requirements of the building permit for the Project.
b. Contractor.
i. The Contractor is the person or entity identified in the Contract as such, and is generally referred to throughout the Contract Documents as if singular in number and masculine in gender but includes the feminine and neuter in gender, as appropriate. The term Contractor means the Contractor or his authorized representative.
ii. This entire Contract is not one of agency by the Contractor for Owner but one in which the Contractor is engaged independently in the business of providing the services and performing the Work herein described as an independent contractor.
c. Contract Time.
i. All time limits stated in the Contract Documents, including the Contractor’s schedule, and including without limitation the date of Substantial Completion of the Work, are of the essence of the Contract.
ii. The Contractor shall begin the Work on the date of commencement as defined herein. He shall carry the Work forward expeditiously with adequate forces and shall achieve Substantial and Final Completion as required by the Contract Documents.
iii. If the Contractor is delayed at any time in progress of the Work by changes ordered in the Work, or by labor disputes, fire, unusual delay in deliveries, unavoidable casualties, or other causes beyond the Contractor’s control, the Contract Time shall be subject to equitable adjustment.
iv. Costs caused by delays or by improperly timed activities or defective construction shall be borne by the responsible party.
d. Contract Sum.
i. The Contract Sum is stated in the Construction Agreement and, including authorized adjustments thereto, is the total amount payable by the Owner to the Contractor for the performance of the Work under the Contract Documents. The Contract Sum includes, but is not limited to, the Contractor's profit and general overhead and all costs and expenses of any nature whatsoever (including without limitation taxes, labor, equipment and materials), foreseen or unforeseen, and any increases in said costs and expenses, foreseen or unforeseen, incurred by the Contractor in connection with the performance of the Work, all of which costs and expenses shall be borne solely by the Contractor. The Contractor agrees to assume all increases in costs of any nature whatsoever that may develop during the performance of the Work.
e. Substantial Completion.
i. Unless otherwise specified as mutually agreed upon in writing by the City and
Contractor, when the Contractor considers that the Work, or a designated portion thereof which is acceptable to the Owner, is substantially complete as defined in Article A.b., Contract Time, the Contractor shall request in writing that the Owner perform a Substantial Completion inspection.
ii. The Owner shall determine whether the Work is substantially complete and shall compile a punch list of items to be completed or corrected. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.
iii. When the Owner on the basis of his inspection determines that the Work or a designated portion thereof is substantially complete, the Owner will then prepare a Certificate of Substantial Completion which shall establish the Date of Substantial Completion and shall state the responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work and insurance. The Certificate of Substantial Completion shall be submitted to the Owner and the Contractor for their written acceptance of the responsibilities assigned to them in such Certificate.
iv. The Contractor shall have thirty (30) days from the Date of Substantial Completion to complete all items on the punch list to the satisfaction of the Owner. If the Contractor fails to complete all punch list items within the designated time, the Owner shall have the option to correct or conclude any remaining items by utilizing its own forces or by hiring others. The cost of such correction of remaining punch list items by the Owner or others shall be deducted from the final payment to the Contractor, and if the Owner has not retained sufficient funds to cover the cost, Contractor or its surety shall pay the difference within 30 days of a written demand by the Owner to do so.
v. Should the Owner determine that the Work or a designated portion thereof is not substantially complete, he shall provide the Contractor a written Notice stating why the Work or designated portion is not substantially complete. The Contractor shall expeditiously complete the Work and shall request again in writing that the Owner perform a Substantial Completion inspection.
vi. In addition to the Contractor’s other obligations, including warranties under the Contract, the Contractor shall, for a period of one year after Substantial Completion, correct work not conforming to the requirements of the Contract Documents.
B. Audit. The contractor shall retain all books, records, and other documents relative to this contract for five (5) years after final payment, or until audited by the City, whichever is sooner. The agency, its authorized agents, and/or state auditors shall have full access to and the right to examine any of said materials during said period.
C. Contractor Registration. If a contract for construction, removal, repair or improvement of a building or other real property is for $120,000 or more, or if the total value of all such contracts undertaken by bidder within any 12-month period is $750,000 or more, the bidder is required under Title 54.1-1100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors a “CLASS A CONTRACTOR”. If such a contract is for $10,000 or more but less than $120,000, or if the total value of all such contracts undertaken by bidder within any 12-month period is $150,000 or more, but less than $750,000 or more, the bidder is required to be licensed as a “CLASS B CONTRACTOR”. If such a contract is over $1,000 but less than $10,000, or if the contractor does less than $150,000 in business in a 12-month period, the bidder is required to be licensed as a “CLASS C CONTRACTOR”. The board shall require a master tradesmen license as a condition of licensure for electrical, plumbing and heating, ventilation and air conditioning contractors. The bidder shall place on the outside of the envelope containing the bid and shall place in the bid over his signature whichever of the following notations is appropriate, inserting his contractor license number:
Licensed Class A Virginia Contractor No. _______________Specialty _______________
Licensed Class B Virginia Contractor No. _______________Specialty _______________
Licensed Class C Virginia Contractor No. _______________Specialty _______________
If the bidder shall fail to provide this information on his bid or on the envelope containing the bid and shall fail to promptly provide said contractor license number to the City in writing when requested to do so before or after the opening of bids, he shall be deemed to be in violation of § 54.1-1115 of the Code of Virginia (1950), as amended, and his bid will not be considered.
If a bidder shall fail to obtain the required license prior to submission of his bid, the bid shall not be considered.
D. Contractor’s Title to Materials. No materials or supplies for the work shall be purchased by the contractor or by any subcontractor subject to any chattel mortgage or under a conditional sales or other agreement by which an interest is retained by the seller. The contractor warrants that he has clear title to all materials and supplies for which he invoices for payment
E. Delivery and Storage. It shall be the responsibility of the contractor to make all arrangements for delivery, unloading, receiving and storing materials during installation. The owner will not assume any responsibility for receiving these shipments. Contractor shall check with the owner and make necessary arrangements for security and storage space during installation.
F. Final Inspection. At the conclusion of the work, the contractor shall demonstrate to the Owner that the work is fully operational and in compliance with contract specifications and codes. Any deficiencies shall be promptly and permanently corrected by the contractor at the contractor’s sole expense prior to final acceptance of the work.
G. Warranty. All materials and equipment shall be fully guaranteed against defects in material and workmanship for a period of 10 years following date of delivery. Should any defect be noted by the owner, the Purchasing Office will notify the contractor of such defect or non-conformance. Notification will state either (1) that the contractor shall replace or correct, or (2) the owner does not require replacement or correction, but an equitable adjustment to the contract price will be negotiated. If the contractor is required to correct or replace, it shall be at no cost to the City and shall be subject to all provisions of this clause to the same extent as materials initially delivered. If the contractor fails or refuses to replace or correct the deficiency, the office issuing the purchase order may have the materials corrected or replaced with similar items and charge the contractor the costs occasioned thereby or obtain an equitable adjustment in the contract price.
H. Work Site Damages. Any damage to existing utilities, equipment or finished surfaces resulting from the performance of this contract shall be repaired to the City’s satisfaction at the contractor’s expense.
I. Owner’s Right to Stop Work. If the Contractor fails to correct defective Work as required herein or persistently fails to carry out the Work in accordance with the Contract Documents, the Owner, by a written order, may order the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated;
however, this right of the Owner to stop the Work shall not give rise to any duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity.
J. Suspension of Work. The Owner will have the authority to suspend the Work, in whole or in part, for such periods and such reasons as the Owner may deem necessary or desirable, in its sole discretion, including without limitation:
1 Unsuitable weather;
2 Other conditions considered unfavorable for the suitable prosecution of the Work; and/or
3 Other conditions considered adverse to the best interests of the Owner.
2 Any such suspension shall be made by Owner by written order to the Contractor.
The Contractor shall obey immediately such order of the Owner and shall not resume the Work until so ordered in writing by the Owner. The Contractor shall be entitled to an extension of the time allowed for substantial completion of the Work equivalent to the duration of the suspension of the Work.
3 No such suspension of the Work shall be the basis of a claim by the Contractor for any increase in the Contract Sum or for any other damages, losses, costs or expenses if the suspension is for a reasonable time under the circumstances then existing and the cause thereof is beyond the control and is without the fault or negligence of the Owner or those acting on Owner’s behalf.
4 In the event of suspension of Work, the Contractor will, and will cause his Subcontractors and others providing any of the Work through Contractor to, protect carefully his and their materials and Work against damage or injury from the weather and maintain completed and uncompleted portions of the Work as required by the Contract Documents. If, in the opinion of the Owner, any Work is damaged or injured by reason of failure on the part of the Contractor or any of his subcontractors to so protect same, such Work shall be removed and replaced at the expense of the Contractor.
K. Notice to Proceed. The City and the Contractor will mutually agree, in writing, at the time of the Notice to Proceed is issued, upon the date for substantial completion of the work. The Notice to Proceed will be issued subsequently to at least one pre-construction meeting to discuss schedules and any other related work issues. The Contractor shall commence Work within ten (10) days after Notice to Contractor to Proceed with the Work under Contract (“Notice to Proceed”), and shall substantially complete the Work no later than the date agreed upon between the Contractor and the Owner in the Pre-Construction meeting.
L. LIQUIDATED DAMAGES FOR DELAY.
a. The damages incurred by the Owner due to the Contractor's failure to complete the Work within the required Contract Time, as mutually agreed upon in writing by the City and the Contractor, including any extensions thereof, shall be in the amount set forth in the Construction Agreement, for each consecutive calendar day beyond the Milestone Dates or the Contract Time (Sundays and all holidays included) for which the Contractor shall fail to complete the Work.
b. The parties hereby agree that the amount of liquidated damages provided in this Contract is neither a penalty nor a forfeiture and is intended to…