This is a bid proposal and contract document issued by the Commonwealth of Virginia Department of Transportation for an on-call guardrail hits repair project in the Bristol District. The project encompasses various locations throughout the district and requires prequalification for bidders. The contract involves the repair and replacement of guardrail systems and related components across multiple road segments. The scope of work includes approximately 40 line items covering various guardrail types (GR-MGS1, GR-MGS1A, GR-2, GR-10, and others), guardrail terminals, impact attenuators, median barriers, and associated installation and removal services. Quantities range significantly by item, from as few as 1 unit for impact attenuator maintenance and repair training to as many as 15,000 linear feet for removing existing guardrail. The bid submission deadline was 10:00 AM on Wednesday, May 27, 2026, with an electronic filing requirement through the Bidx platform. The contract completion date is July 26, 2027, indicating a 13-month project duration.
Bidders must submit unit prices for all items listed in the proposal schedule, and all bids require a proposal guaranty bond equal to five percent of the total bid dollar value. The project includes specialized bid items designated as "ATTD" (attached specifications) and standard items designated with specification numbers, primarily falling under Section 505 (guardrail work) and Section 512 (impact attenuator services). Subcontractor and supplier information must be submitted within ten business days after bid opening, with all bidders, including SWAM (Small, Women-owned, and Minority) firms bidding as prime contractors, required to complete solicitation and utilization forms. The contract is District-wide in scope with no Federal Highway Administration (FHWA) funding indicated. Bidders must certify they have examined project plans, specifications, work locations, and material sources, and that they meet all prequalification requirements established by the Virginia Department of Transportation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER NO.: P80
CONTRACT ID. NO.: C0000128694N01
Form C-6a
Rev. 3-22-05
CNSP (S) 1-9-06
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL AND CONTRACT
ROUTE NUMBER: VARIOUS
FHWA NUMBER: NONE
PROJECT NUMBER: 9999-961-942, N501
COUNTY: DISTRICT-WIDE
DISTRICT: BRISTOL
DESCRIPTION: ON CALL - GUARDRAIL HITS REPAIR
LOCATION: VARIOUS
DATE BID SUBMITTED: 10:00 AM WEDNESDAY, MAY 27, 2026
Form C-118 Rev. 2-1-24
COMMONWEALTH OF VIRGINIA
NOTICE TO BIDDERS
As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.
1. Bids shall be filed electronically through Bidx (https://bidx.com/site/home) at the times designated in the Notice of Advertisement for Bids. For information see (https://cabb.virginiadot.org/)
2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.
3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.
4. A bid total shall be shown in each space provided.
5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative you may complete the bottom line of the Form C-24. This form may be mailed or faxed but must be received prior to the opening of the bids.
6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.
https://bidx.com/site/home https://cabb.virginiadot.org/
Form C-24
Rev. 7-6-05
PROPOSAL GUARANTY
KNOW ALL MEN BY THESE PRESENTS, THAT WE _______________________________________ as principal, and ________________________________________ Surety, are held and firmly bound unto the
Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE
BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.
SIGNED, sealed and dated this day of , 20
WHEREAS, the above said principal is herewith submitting its proposal for:
PROJECT NUMBER: 9999-961-942, N501
NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.
(Principal*) (Surety Company)
By: By:
(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)
(Principal*) (Address)
(Officer, Partner or Owner) (Seal) (Surety Company)
(Principal*) (Attorney-in-Fact**) (Seal)
(Officer, Partner or Owner) (Seal) (Address)
*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.
Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.
Electronic Bid Bond ID Company/Bidder Name Signature and Title
**Attach copy of Power of Attorney
Form C-48
Rev. 10-8-2025
COMMONWEALTH OF VIRGINIA
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION FORM (ALL BIDDERS)
PROJECT NO. 9999-961-942, N501
CONTRACT ID. NO. C0000128694N01
FHWA NO. NONE
DATE SUBMITTED
All bidders, including SWAM bidding as Prime Contractors, shall complete and submit the following information as requested in this form within ten (10) business days after the opening of bids.
The bidder certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The bidder also certifies he/she has had direct contact with the named firms regarding participation on this project.
BIDDER_________________________________SIGNATURE________________________________
TITLE_____________________________________________________________________________
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)
VENDOR
NUMBER
NAME OF SUBCONTRACTOR/SUPPLIER
TELEPHONE NUMBER
SWAM OR
NON-SWAM
UTILIZED
(Y/N)
NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.
BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.
Form C-7
Rev. 2-2-24
TERMS OF THE PROPOSAL\CONTRACT
COMMONWEALTH OF VIRGINIA
SUBMITTED: 10:00 AM WEDNESDAY, MAY 27, 2026
PROJECT NUMBER: 9999-961-942, N501
ROUTE NUMBER: VARIOUS
FHWA NUMBER: NONE
DESCRIPTION: ON CALL - GUARDRAIL HITS REPAIR
LOCATION: VARIOUS
DISTRICT: BRISTOL COUNTY: DISTRICT-WIDE
I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;
that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.
COMPLETION DATE: JULY 26, 2027
BID TOTAL $
Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.
(Names of Individual(S),Firm(S) Or Corporation)
Street Address City State Zip Code Vendor#/Fin#
Print Name Signature Title
In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.
Contract Execution Date By
CHIEF ENGINEER
VIRGINIA DEPARTMENT OF TRANSPORTATION
Virginia Department of Transportation 04/27/2026Date Printed:
Schedule of Items Page: 2
Proposal ID: C0000128694N01 9999-961-942, N501
Order No.: P80
Oversight/State Project No.:
Federal Project No.: NONE
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0010 303SX20-0012
UTILITY TEST PIT UNPAVED EA
10.000
ATTD
0020 303SX20-0013
UTILITY TEST PIT ASPHALT
CONCRETE
EA
10.000
ATTD
0030 308SD20-0011
AGGR. BASE MATL. TY. I NO.
21A
TON
50.000
0040 410SD20-0004
RAILING TEXAS T-6 CONST. LF
25.000
0050 505SD20-0009
REMOVE EX. GUARDRAIL
TERMINAL
EA
80.000
0060 505SD20-0011
GUARDRAIL GR-MGS1 LF
2,500.000
0070 505SD20-0012
GUARDRAIL GR-MGS1A LF
200.000
0080 505SD20-0013
GUARDRAIL GR-MGS1, 9'
POST
LF
100.000
0090 505SD20-0014
RADIAL GUARDRAIL GR-
MGS1
LF
300.000
0100 505SD20-0016
RADIAL GUARDRAIL GR-
MGS1, 9' POST
LF
100.000
0110 505SD20-0017
GUARDRAIL TERMINAL GR-
MGS2
EA
60.000
0120 505SD20-0018
GUARDRAIL END
ANCHORAGE GR-MGS3
EA
20.000
Schedule of Items Page: 3
Proposal ID: C0000128694N01 9999-961-942, N501
Order No.: P80
Oversight/State Project No.:
Federal Project No.: NONE
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0130 505SD20-0019
GUARDRAIL HEIGHT
TRANSITION GR-MGS4
EA
40.000
0140 505SD20-0027
GUARDRAIL TERMINAL GR-6
NCHRP 350
LF
25.000
0150 505SD20-0029
GUARDRAIL TERMINAL GR-11 EA
10.000
0160 505SD20-0030
GUARDRAIL GR-2 LF
3,000.000
0170 505SD20-0032
GUARDRAIL GR-2 8' POST LF
150.000
0180 505SD20-0033
GUARDRAIL GR-2A LF
75.000
0190 505SD20-0034
RAD. GUARDRAIL GR-2 LF
400.000
0200 505SD20-0040
GUARDRAIL GR-10 LF
25.000
0210 505SD20-0045
FIXED OBJECT ATTACH. GR-
FOA-1 TY. I
EA
3.000
0220 505SD20-0053
FIXED OBJECT ATTACH. GR-
FOA-2 TY. I
EA
3.000
0230 505SD20-0055
FIXED OBJECT ATTACH. GR-
FOA-5
EA
5.000
0240 505SD20-0059
MEDIAN BARRIER MB-3 LF
1,000.000
0250 505SD20-0071
GUARDRAIL BEAM LF
2,000.000
Schedule of Items Page: 4
Proposal ID: C0000128694N01 9999-961-942, N501
Order No.: P80
Oversight/State Project No.:
Federal Project No.: NONE
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0260 505SD20-0073
REMOVE EXISTING
GUARDRAIL
LF
15,000.000
0270 505SP20-0005
W BEAM END SECT
ROUNDED
EA
8.000
ATTD
0280 505SP20-0006
W BEAM BACKUP PLATE EA
10.000
ATTD
0290 505SP20-0007
RADIAL GUARDRAIL BEAM LF
200.000
ATTD
0300 505SP20-0010
WOOD, CONC., OR STEEL
POST
EA
300.000
ATTD
0310 505SP20-0012
OFFSET BLOCK EA
300.000
0320 505SP20-0014
DRILL HOLE EA
30.000
ATTD
0330 505SP20-0015
REALIGN POST EA
100.000
ATTD
0340 505SP20-0033
BENT PLATE OR S3X5.7
STEEL POST GR-8
EA
7.000
ATTD
0350 505SX20-0001
HAND DIG GUARDRAIL POST
HAND DIG GUARDRAIL POST
EA
25.000
ATTD
0360 505SX20-0004
GUARDRAIL POST N-CAP EA
200.000
ATTD
0370 505SX20-0058
GUARDRAIL MEDIAN
BARRIER TERMINAL
EA
5.000
ATTD
0380 505SX20-0058
GUARDRAIL POST LEAVE
OUT
EA
10.000
ATTD
Schedule of Items Page: 5
Proposal ID: C0000128694N01 9999-961-942, N501
Order No.: P80
Oversight/State Project No.:
Federal Project No.: NONE
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0390 505SX20-0058
GUARDRAIL REMOVE
MEDIAN BARRIER TERMINAL
EA
5.000
0400 505SX20-0058
GUARDRAIL TERMINAL SITE
PREP (MINOR)
EA
4.000
ATTD
0410 505SX20-0058
GUARDRAIL TERMINAL SITE
PREP 4' (MOD)
EA
4.000
ATTD
0420 505SX20-0058
GUARDRAIL TERMINAL SITE
PREP 6' (MOD)
EA
4.000
ATTD
0430 505SX20-0070
IMPACT ATTENUATOR
MAINTENANCE AND REPAIR
TRAINING
EA
1.000
ATTD
0440 512SD20-0007
IMPACT ATTEN.SER. TY. 1 TL-
3, >=40 MPH
EA
2.000
0450 512SD20-0008
IMPACT ATTEN.SER. TY. I TL-
2, <40 MPH
EA
2.000
0460 512SD20-0023
TRUCK MOUNTED
ATTENUATOR
HR
350.000
0470 512SD20-0024
GROUP 2 CHANNELIZING
DEVICES
DAY
100.000
0480 512SD20-0026
ELECTRONIC ARROW BOARD HR
350.000
0490 512SD20-0027
FLAGGER SERVICE HR
400.000
0500 512SP20-0001
PORTABLE TEMPORARY
RUMBLE STRIP ARRAY
DAY
15.000
ATTD
Schedule of Items Page: 6
Proposal ID: C0000128694N01 9999-961-942, N501
Order No.: P80
Oversight/State Project No.:
Federal Project No.: NONE
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0510 513SX20-0002
EMERGENCY MOBILIZATION EA
15.000
ATTD
0520 702SD20-0001
GUARDRAIL DELINEATOR EA
35.000
Section: 0001 _________._____Total:
Total Bid: _________._____
Page
Bid Items Eligible For Fuel Adjustment
C0000128694N01
P80
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision for Optional Adjustment for Fuel. If you choose to have Fuel Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
FORM C-21B
Rev 12-21-05
0001 REGULAR BID ITEMSSECTION:
ltem Description Fuel Factor gal/unit Option Item
Number
_______AGGR. BASE MATL. TY. I NO. 21A 0.600308SD20-0011
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Page
Bid Items Eligible For Steel Price Adjustment
C0000128694N01
P80
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision. If you choose to have Steel Price Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
Rev 12-21-08
FORM C-21C
0001 REGULAR BID ITEMSSECTION:
ltem Description Option Item
Number
_______RAILING TEXAS T-6 CONST.410SD20-0004
_______GUARDRAIL GR-MGS1505SD20-0011
_______GUARDRAIL GR-MGS1A505SD20-0012
_______GUARDRAIL GR-MGS1, 9' POST505SD20-0013
_______RADIAL GUARDRAIL GR-MGS1505SD20-0014
_______RADIAL GUARDRAIL GR-MGS1, 9' POST505SD20-0016
_______GUARDRAIL TERMINAL GR-MGS2505SD20-0017
_______GUARDRAIL END ANCHORAGE GR-MGS3505SD20-0018
_______GUARDRAIL HEIGHT TRANSITION GR-MGS4505SD20-0019
_______GUARDRAIL TERMINAL GR-6 NCHRP 350505SD20-0027
_______GUARDRAIL TERMINAL GR-11505SD20-0029
_______GUARDRAIL GR-2505SD20-0030
_______GUARDRAIL GR-2 8' POST505SD20-0032
_______GUARDRAIL GR-2A505SD20-0033
_______RAD. GUARDRAIL GR-2505SD20-0034
_______GUARDRAIL GR-10505SD20-0040
_______MEDIAN BARRIER MB-3505SD20-0059
_______GUARDRAIL BEAM505SD20-0071
_______RADIAL GUARDRAIL BEAM505SP20-0007
_______BENT PLATE OR S3X5.7 STEEL POST GR-8505SP20-0033
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Form C-111S 6-7-16
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
MINIMUM SWAM REQUIREMENTS
PROJECT NUMBER: 9999-961-942, N501
Federal Project No.: NONE
* * * INSTRUCTIONS * * *
THIS FORM CAN BE USED BY THE CONTRACTOR TO SUBMIT THE NAMES OF SWAM FIRMS TO BE UTILIZED ON THE PROJECT. THE CONTRACTOR SHALL INDICATE THE DESCRIPTION OF THE CATEGORY (S, M, SP or H) AND THE TYPE OF WORK THAT EACH SWAM WILL PERFORM AND THE ALLOWABLE CREDIT PER ITEM(S). ADDITIONAL SHEETS TO SHOW THE ALLOWABLE CREDIT PER ITEM MAY BE ATTACHED IF NECESSARY. PLEASE NOTE: THE AMOUNT OF ALLOWABLE CREDIT FOR A SWAM SUPPLIER IS 60% OF THE TOTAL COST OF THE MATERIALS OR SUPPLIES OBTAINED AND 100% FOR A SWAM MANUFACTURER OF THE MATERIALS AND SUPPLIES OBTAINED. A CONTRACTOR MAY COUNT 100% OF THE FEES PAID TO A SWAM HAULER FOR THE DELIVERY OF MATERIALS AND SUPPLIES TO THE PROJECT SITE, BUT NOT
FOR THE COST OF THE MATERIALS AND SUPPLIES THEMSELVES.
SWAM REQUIREMENT %
PERCENT ATTAINED BY BIDDER %
NAMES(S) AND CERTIFICATION NO.
OF SWAM(S) TO BE USED
USED AS
SUBCONTR. (S)
MFG. (M)
SUPPLIER (SP)
HAULER (H)
TYPE OF WORK AND ITEM
NO(S)
$ AMOUNT OF
ALLOWABLE
CREDIT PER
ITEM
TOTAL $
TOTAL CONTRACT VALUE $ x REQUIRED SWAM % = $
I/WE CERTIFY THAT THE PROPOSED SWAM(S) SUBMITTED WILL BE USED ON THIS CONTRACT AS STATED HEREON AND ASSURE THAT DURING THE LIFE OF THE CONTRACT. I/WE WILL MEET OR EXCEED THE PARTICIPATION
ESTABLISHED HEREON BY THE DEPARTMENT.
BY
BIDDER SIGNATURE
BY
TITLE DATE
Form C-112S
6-7-16
CERTIFICATION OF BINDING AGREEMENT
WITH
SMALL, WOMEN-OWNED, AND MINORITY-OWNED BUSINESS FIRMS
PROJECT NO: 9999-961-942, N501
Federal Project No.: NONE
This form is to be submitted in accordance with the Department’s Special Provision for Section 107.15.
It is hereby certified by the below signed Contractors that there exists a written quote, acceptable to the parties involved preliminary to a binding subcontract agreement stating the details concerning the work to be performed and the price which will be paid for the aforementioned work. This document is not intended to, nor should it be construed to, contain the entire text of the agreement between the contracting parties.
This document does not take the place of, nor may it be substituted for, an official subcontracting agreement in those situations that may require such an agreement. A copy of the fully executed subcontract agreement shall be submitted to the Engineer within fourteen (14) business days after contract execution.
It is further certified that the aforementioned mutually acceptable quote and fully executed subcontract agreement represent the entire agreement between the parties involved and that no conversations, verbal agreements, or other forms of non-written representations shall serve to add to, delete, or modify the terms as stated.
The prime Contractor further represents that the aforementioned mutually acceptable quote and fully executed subcontract agreement shall remain on file for a period of not less than one year following completion of the prime's contract with the Department or for such longer period as provisions of governing Federal or State law or regulations may require. For purposes of this form, the term Prime Contractor shall refer to any Contractor utilizing a SWAM subcontractor, regardless of tier, in which they are claiming SWAM credit toward the contract goal.
Contractors further jointly and severally represent that said binding agreement is for the performance of a "commercially useful function" as that term is employed in 49 C.F.R. Part 26.55 (c), (d).
SWAM Contractor
By:
Signature Title
Date:
*Subcontractor
* TO BE SIGNED BY THE SUBCONTRACTOR ONLY IF THEY HAVE A CONTRACT WITH THE ABOVE SWAM FIRM
Prime Contractor
FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.
*CN100-000026-09 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 12-11-25 (SPCN) 1
CN103-000120-01 SECTION 103.02—AWARD OF CONTRACT 6-17-25 (SPCN) 1
CN105-000140-00 SECTION 105.14—MAINT. DURING CONSTRUCTION 12-20-24 (SPCN) 2
CN105-000150-00 SECURITY REQUIREMENTS FOR PCMS 1-30-26 (SPCN) 2
CN105-000610-00 SEC. 105.06—SUBCONTRACTING R-7-12-16 (SPCN) 3
CN221-000100-00 SECTION 221.02—DETAIL REQUIREMENTS 1-15-25 (SPCN) 4
CN245-000100-01 SECTION 245.03—TESTING & DOCUMENTATION 1-10-24 (SPCN) 4
*CN505-000100-01 IMPACT ATTENUATOR 1-24-19_(SPCN) 5
*DRUG-FREE WORKPLACE 7-3-19 (SPCN) 7
CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 (SPCN) 7
INSPECTION OF DAMAGED GUARDRAIL FOR “HITS” CONTRACTS 9-30-16 (SPCN) 8
UNIFORMED FLAGGERS R-7-12-16_(SPCN) 8
EMERGENCY MOBILIZATION 10-7-21 (SPCN) 9
SP100-000120-01 RENEWABLE ON CALL CONTRACTS GENERAL PROVISIONS 11-4-20 10
SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 16
SP107-000110-00 C-45–SWPPP GEN. PERMIT–CONTRACTOR CERTIFICATION R-10-27-16 17
SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 18
SP109-000120-01* PRICE ADJUSTMENT FOR STEEL 7-2-19 20
SP109-000130-01 ELECTRONIC OR PRINTED WEIGH TICKETS 3-10-25 25
SP505-000100-00 REPLACE G’RAIL, MED. BARRIER & G’RAIL TO BRIDGE 8-4-16 31
GUARDRAIL TERMINAL SITE PREPARATION 7-13-20 37
SP801-000100-01 LANE CLOSE COORD (LCC)/LANE CLOSE IMPLEMENT (LCI) 9-20-17 39
SEC. 107.15—USE OF SWAM BUSINESSES 6-7-21 41
SQ107-001620-00 PREVAILING WAGE RATES 5-11-2021 58
SS109-002020-01 SEC. 109—MEASUREMENT AND PAYMENT 5-1-23 73
SS211-002020-03 SECT 211 – ASPHALT CONCRETE 3-18-24 76
SS220-002020-01 SECTION 220 – CONCRETE CURING MATERIALS 8-28-20 81
SS223-002020-02 SECTION 223 – STEEL REINFORCEMENT 4-4-23 82
*SS234-002020-01 SECTION 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 83
*SS235-002020-01 SECTION 235 – RETROREFLECTORS 5-6-22 84
SS236-002020-01 SECTION 236 – WOOD PRODUCTS 5-14-21 85
*SS246-002020-02 SECTION 246 – PAVEMENT MARKING 5-6-22 89
SS248-002020-02 SECTION 248 – STONE MATRIX ASPHALT CONCRETE 3-18-24 97
*SS305-002020-02 SECTION 305 – SUBGRADE AND SHOULDERS 12-20-23 99
SS308-002020-01 SECTION 308 -SUBBASE COURSE 7-13-21 101
SS309-002020-01 SECTION 309 - AGGREGATE BASE COURSE 7-13-21 102
SS315-002020-05 SECTION 315 – ASPHALT CONCRETE PLACEMENT 5-27-25 103
SS317-002020-01 SECTION 317— STONE MATRIX ASPHALT CONC. PLACEMENT 6-21-24 122
SS318-002020-01 SECTION 318—PAVEMENT INTERLAYERS 8-2-23 124
*SS319-002020-02 SECT 319 – THIN HOT MIX ASPHALT CONCRETE OVERLAY 3-18-24 125
SS321-002020-02 SECTION 321 – TRENCH WIDENING 5-4-23 129
*SS407-002020-02 SEC. 407 – STEEL & METAL STRUCT 11-01-22 131
*SS411-002020-01 SEC. 411 – PROT. COAT. OF METAL 11-01-22 134
*SS512-002020-03 SECTION 512 – MAINTAINING TRAFFIC 7-1-22 135
*SS704-002020-02 SECTION 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 149
SECTION 505-GUARDRAIL AND W-BEAM MEDIAN BARRIERS 3-2-26 155
VERIFYING EXISTING UTILITIES 3-2-26 156
LIMITATION OF OPERATIONS 2-5-26 158
NO PLAN 161
TABLE OF CONTENTS FOR PROVISIONS
cn100-000026-09 GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS
(SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)
This project shall be constructed according to: the Plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the Virginia Work Area Protection Manual, version 11.0; the Virginia MUTCD version 11.0;
and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this Contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.
Special Provision Copied Notes in this Contract are designated with “(SPCN)” after the date.
The information at the top and left of each Special Provision Copied Note in this Contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this Contract is file reference information for Department use only.
12-11-25 (SPCN)
cn103-000120-01 SECTION 103.02—AWARD OF CONTRACT of the Specifications is replaced in its entirety with the following:
103.02 – Award of Contract
The Board, or the Commissioner as authorized under § 33.2-209 of the Code of Virginia, will award the Contract to the lowest responsive and responsible bidder without discrimination on the grounds of race, color, gender, national origin, status as a military family, or other basis prohibited by law, subject to the provisions, if applicable, in § 2.2-4324 of the Code of Virginia.
The award date will not be later than midnight on the 60th day after the opening of bids. If the Board, or the Commissioner as authorized by law, has not awarded the Contract within this period due to any circumstances not attributable to the bidder, the bidder may withdraw his bid without penalty or prejudice unless the time limit is extended by mutual consent.
After approval for the award of contracts, the Department will provide written notice of award to the successful bidder and will post the Ballots on the Department’s bidding webpage. The Ballot serves as public Notice of Award for a contract. The date of the Notice of Award is the “Approved” date appearing at the top of the Ballot that lists the Contract.
6-17-25 (SPCN)
cn105-000140-00 SECTION 105.14—MAINTENANCE DURING CONSTRUCTION of the Specifications is amended by the following:
Section 105.14(a)3 – Flagging Traffic is replaced with the following:
3. Flagging Traffic: Flaggers shall be able to communicate to the traveling public in English while performing the job duty as a flagger at the flagger station.
All flaggers shall possess a valid, current flagger certification card, be it a physical or electronic card, at all times while performing flagging duties.
Flaggers shall be certified by the VDOT Basic or Intermediate Work Zone Traffic Control Training course or by the ATSSA’s classroom Flagger Certification Program.
The following constitutes a valid flagger certification card:
• Cards issued by VDOT following completion of the Basic Work Zone course;
• Cards issued by VDOT following completion of the Intermediate Work
Zone course;
• Cards issued by ATSSA following completion of a Flagger course;
• Cards issued by VDOT following completion of the Flagger-only course, provided the cards were issued on or before December 31, 2024, and have not yet reached the expiration date (two years after date of issuance).
Flaggers who fail to possess a valid, current, flagger certification card, or refuse to allow inspection of same upon request, shall be removed from the flagging site, and operations requiring flagging shall be suspended by the Engineer. Suspended operations requiring flagging may resume once a certified flagger arrives on-site to perform flagging duties in accordance with applicable requirements. Flaggers improperly performing duties may be subject to flagger certification revocation at the sole discretion of the Engineer.
12-20-24 (SPCN)
cn105-000150-00 SECURITY REQUIREMENTS FOR PORTABLE CHANGEABLE MESSAGE SIGNS— The Contractor shall secure portable changeable message sign (PCMS) control cabinets with a grade 3 or stronger standard lock at all times unless maintenance is actively being conducted on the sign.
A password shall be required to change the PCMS message. The Contractor shall change the manufacturer's default password for ALL electronic signs. Electronic signs that support the use of complex passwords shall include at least 14 characters consisting of the following criteria:
• At least one special character
• At least one alphabetical character
• At least one numerical character
• A combination of upper-case and lower-case letters
Electronic signs that do not support the use of complex passwords shall be changed using the maximum number of characters and character types permitted by the manufacturer.
Password credentials are prohibited from being stored, displayed, or written on or within the sign. Any QR codes affixed to the sign shall be removed.
For all PCMS with remote or wireless accessibility, the Engineer will authorize remote access prior to this functionality being enabled. Prior to authorization, the Contractor shall update the PCMS to the most recent compatible software and firmware version available from the manufacturer. Following authorization and prior to use, the Contractor shall establish a remote connection to verify that access to the PCMS is password protected.
Electronic signs shall only post approved and documented messages. The Contractor shall log all messages posted with date and times for each public message.
The Contractor has the option for their signs to be connected to the Department’s Operations Technology (OT) network for management by Traffic Operations Center (TOC) staff. By using this method, messages are transmitted and posted by the TOC control room staff with all records and logging managed within the VDOT Advanced Traffic Management System (ATMS). Electronic message signs connected to the OT network shall follow the security requirements described below:
1. All electronic signs connected to the network shall be secured with a digital lock installed on the sign control cabinet.
2. Connected signs shall only be remotely accessible through secure communications that originated from the Department’s OT network.
3. Connected signs shall only be posted with messages from the
Department’s ATMS systems or designated backup systems.
4. Community strings (both public and private strings) shall be changed from default settings.
5. All vendor cloud connections shall be removed from the connected sign.
TOC system administration staff will configure VPN connections exclusively to the Department’s OT network.
6. All connected electronic signs shall adhere to the Cabinet Security
Standards found in the Department’s OT Cybersecurity Program Manual.
1-30-26 (SPCN)
cn105-000610-00 SECTION 105.06—SUBCONTRACTING of the Specifications is amended to replace the first paragraph with the following:
No portion of the Contract shall be subcontracted or otherwise disposed of without the written consent of the Engineer, except for work that is $25,000 or less per subcontractor, where the cumulative total of the sublets not requiring the Engineer’s written consent will not exceed 10 percent of the original contract value. This will not, however, waive the requirements for prequalification, and will be considered part of the percentage the Contractor is allowed to subcontract.
The Contractor shall notify the Engineer of the name of the firm to whom the work will be subcontracted, and the amount and items of work involved. Such notification shall be made and verbal approval given by the Engineer prior to the subcontractor beginning work.
5-15-08; Reissued 7-12-16 (SPCN) [formerly cn105-060100-00] https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn105-000610-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn105-060100-00.docx cn221-000100-00 SECTION 221.02—DETAIL REQUIREMENTS of the Specifications is amended by replacing the first paragraph with the following:
Guardrail shall consist of rail or cable elements and fastenings fabricated to develop continuous beam or cable strength when installed. Guardrail materials shall conform to AASHTO M180-18 and M30 specification requirements supplied by manufacturers included on the Department’s Approved List 12.
1-15-25 (SPCN)
cn245-000100-01 SECTION 245.03—TESTING AND DOCUMENTATION of the Specifications is amended by the following:
Section 245.03(e) – Prefabricated Geocomposite Pavement Underdrain is replaced by the following:
Prefabricated Geocomposite Pavement Underdrain: Prefabricated geocomposite pavement underdrain shall consist of a polymeric drainage core allowing water inflow from both sides, encased in a nonwoven filter fabric envelope having sufficient flexibility to withstand bending and handling without damage. Prefabricated geocomposite pavement underdrain shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the pavement environment and shall have a thickness of not less than 3/4 inch. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Properties Test Method Requirements
Compressive strength ASTM D1621, D2412, and
D6364
Min. 40 psi at 20% max.
deflection immediately after
24 hrs of specimen conditioning at 0 deg F and at
125 deg F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 0.1)
ASTM D4716 Min. 15 gal/min/ft width for
12-in specimen length
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over both sides of the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
https://covgov.sharepoint.com/:w:/r/sites/TM-VDOT-SC-Specifications-External/_layouts/15/Doc.aspx?sourcedoc=%7BF1622882-4C64-446A-AE11-E07A4F78D1F2%7D&file=cn221-000100-00.docx&action=default&mobileredirect=true
Section 245.03(f) – Geocomposite Wall Drains is replaced by the following:
Geocomposite Wall Drains: Prefabricated geocomposite wall drain shall consist of a polymeric drainage core with a nonwoven filter fabric (single sided or double sided) having sufficient flexibility to withstand bending and handling without damage.
Geocomposite wall drains shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the roadway. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Property Test Method Requirements
Compressive strength ASTM D1621, D2412, and D6364
Min. 40 psi at 20% max.
deflection immediately after 24 hrs of specimen conditioning at 0 degree F and at 125 degree F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 1.0)
ASTM D4716 Min. 15 gal/min/ft width (for 12-in specimen length)
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over the core.
Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
Section 245.03(g) – Geomembrane Moisture Barrier is replaced by the following:
Geomembrane Moisture Barrier: Geomembrane moisture barrier shall be resistant to biological attack. Geomembrane shall be constructed of PVC and shall conform to the requirements of ASTM D7176 for PVC 30 or higher grades. In addition, geomembrane shall comply with the requirements of ASTM D7408 for bond seam strength and peel strength.
1-10-24 (SPCN)
cn505-000100-01 IMPACT ATTENUATOR — This work shall consist of replacing damaged impact attenuators, or installing new, by furnishing and installing impact attenuators in accordance with Section 505 of the Specifications and as directed by the Engineer.
Replacement impact attenuators shall be a Type I (Re-Directive Low-
Maintenance) as designated on VDOT’s MASH Provisionally Approved Products
List. Impact attenuators shall be installed in accordance with the manufacturer's specifications and instructions, Standard Drawing IA-LM, and Section 505 of the
Specifications.
https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn505-000100-01.docx
If replacing an existing impact attenuator, the Contractor shall inspect the condition of the existing impact attenuator foundation pad for size, thickness, adequacy of reinforcement, slope, cracking, surface wear, shifting, undermining, settling, or other signs of age or deterioration which may be unsuitable for continued use. If any of these conditions are present, the Contractor shall notify the Engineer and request authorization prior to replacing the existing foundation pad.
If the existing foundation pad is suitable for continued use and existing bolt patterns are present, the Contractor shall confirm that installing new bolts will not negatively impact performance of the unit.
Anchor bolts shall be set into holes drilled with rotary impact drills of the sizes recommended by the manufacturer of the attenuator, and as approved by the Engineer. Bolt holes shall be cleaned with a bottle brush before installing the anchor bolts.
The Type I (Re-Directive Low-Maintenance) Impact Attenuator shall be bolted in place according to the attenuator manufacturer’s instructions, but not before the fresh concrete foundation, if applicable, has reached 28-day strength, determined in accordance with Section 217 of the Specifications.
If a transition is required, the appropriate manufacturer’s standard transition shall be used.
The work site shall be protected according to Section 512 of the Specifications and the VWAPM.
Installers and repair personnel shall be certified by the manufacturer. The Contractor shall submit two copies of the manufacturers’ installation instructions to the Engineer prior to beginning work.
The Contractor shall provide one training session to VDOT personnel at a location selected by the Engineer within the VDOT District where the impact attenuators were installed, when designated as a pay item. The training sessions shall be conducted by a manufacturer’s representative and cover impact attenuator maintenance and repair. The Department may add additional training sessions to be paid for at the unit price bid. Each session shall be structured such that the personnel trained will be able to perform maintenance and repair beginning within one year of the training.
The Contractor shall provide documentation tracing the steel in the finished product back to raw material in accordance with Buy America requirements.
Impact attenuator will be measured in units of each and will be paid for at the
Contract Each price. This price shall include furnishing and installing pad, impact attenuator, and transitions.
Remove existing impact attenuator will be measured and paid for as remove existing guardrail terminal in accordance with Section 505 of the Specifications.
This price shall include removing and disposing of existing impact attenuator.
Site Preparation will be measured and paid for as Guardrail terminal site preparation in accordance with Section 505 of the Specifications.
Maintenance and Repair Training will be measured in units of each and will be paid for at the Contract each price.
Payment will be made under:
Pay Item Pay Unit
Impact attenuator (Type, Speed) Each
Maintenance and Repair Training Each
1-24-19_(SPCN)
DRUG-FREE WORKPLACE– The Contractor shall:
• Provide a Drug-Free Workplace for the Contractor’s employees.
• Post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition.
• State in all solicitations or advertisements for employees placed by or on behalf of the Contractor that the Contractor maintains a Drug-Free Workplace.
• Include the provisions of the foregoing clauses in every Subcontract or purchase order of over $10,000, so that the provisions will be binding upon each Subcontractor or vendor.
For the purposes of this provision, “Drug-Free Workplace” means a site for the performance of work done in connection with the Contract. The Contractors employees, and those of his Subcontractors, shall be prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession, or use of any controlled substance or marijuana during the performance of the Work.
7-3-19 (SPCN)
cq107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY
Section 107.14(a)1 – Required by §2.2-4201 and §2.2-4311 of the Code of Virginia is replaced with the following:
1. Required by §2.2-4201 and §2.2-4311 of the Code of Virginia: During the performance of this Contract, the Contractor agrees as follows:
a. The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where religion, sex, or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause, including the names of all contracting agencies with which the Contractor has contracts of over $10,000.
b. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that such contractor is an equal opportunity employer. However, notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this chapter.
c. If the Contractor employs more than five employees, the Contractor shall (i) provide annual training on the Contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the Department of Human Resource Management, and (ii) post the Contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the Contractor owns or leases for business purposes and (b) the Contractor's employee handbook.
The Contractor shall include the provisions of subdivisions a, b, and c in every subcontract or purchase order of over $10,000, so that such provisions shall be binding upon each subcontractor or vendor.
Nothing contained in this chapter shall be deemed to empower any agency to require any contractor to grant preferential treatment to, or discriminate against, any individual or any group because of race, color, religion, sex, or national origin on account of an imbalance that may exist with respect to the total number or percentage of persons of any race, color, religion, sex, or national origin employed by such contractor in comparison with the total number or percentage of persons of such race, color, religion, sex, or national origin in any community or in the Commonwealth.
5-11-22 (SPCN)
INSPECTION OF DAMAGED GUARDRAIL FOR “HITS” CONTRACTS — The Contractor shall inspect the locations and prepare a list of materials and quantity needed for repair for the Engineer’s review prior to commencing work. The Engineer will notify the Contractor to repair the guardrail by components or to remove and replace sections of damaged guardrail.
9-30-16 (SPCN)
UNIFORMED FLAGGERS - The Contractor shall utilize off-duty uniformed police officers for control of traffic through signalized intersections during periods when the control equipment is non-operational. It is expressly understood that the work under this pay item exceeds the requirements and duties typically associated with flagger service. Off duty police officers will not be required to have VDOT flagger certification to perform this work. Police assisted flagger service will be measured and paid for in hours of in duty service. This price will be full compensation for furnishing uniform officers and all associated costs.
Uniformed Flaggers Hours
9-29-08; Reissued 7-12-16_(SPCN)
EMERGENCY MOBILIZATION shall consist of performing emergency preparatory operations, including moving personnel and equipment to the work site when emergency repair or replacement work is ordered by the Engineer.
The emergency repair or replacement work will be within the scope of the Contract.
The Contractor shall confirm receipt of emergency repair notifications within 24 hours and shall commence repair or replacement work within 72 hours of notification. Emergency mobilization repairs shall be completed within 7 calendar days of notification unless otherwise approved by the Engineer.
Emergency Mobilization will be measured in units of each, per response call, and will be paid for at the Contract each price. This price shall include moving personnel, materials, and equipment to the project site, setting up maintenance of traffic items, and demobilizing when no longer required.
The price also includes, but is not limited to, as many return trips as necessary due to holidays, curing time, temperature requirements, and manufacture recommendations. Only one mobilization will be paid per notice for each emergency mobilization issued by the Engineer.
Emergency Mobilization Each
10-7-21 (SPCN)
SPECIAL PROVISION FOR
RENEWABLE ON CALL CONTRACTS GENERAL PROVISIONS
November 4, 2020 9999-961-942,N501
SECTION 101 – DEFINITIONS OF ABBREVIATIONS, ACRONYMS, AND TERMS of the Specifications is amended as follows:
Section 101.02 – Terms is amended to include the following:
Renewable Contract. A contract that may be extended for additional terms.
Task Order. An assignment of specific work, work schedule, or plan details depicting work to be performed at a location or locations defined by physical description. Each Task Order will be issued with a Notice to Proceed specifying the Task Order value, required work commencement date, the Liquidated Damages, and the completion date/days of the Task Order. The Task Order will include a description of the work to be performed with plan details or schedules, estimated quantities and site specific limitations of operations.
Task Order Completion Date. The date, specified in an issued Task Order, by which the Contractor shall achieve Final Acceptance by the Department on the work described in the Task Order in accordance with Section 108.09. This date may be modified by two-party signing of the revised Task Order.
Term. The time limit and conditions of the Contract in force from the Contract Execution Date until the first of either the original Completion Date, including any authorized extensions thereto, or the date on which the cumulative payments for completed and accepted work reaches the original Contract amount.
SECTION 103 – AWARD AND EXECUTION OF CONTRACTS of the Specifications is amended as follows:
Section 103.02 – Award of Contract is renamed Award of Contract and Contract Renewal and amended to include the following:
The Department may extend the Contract in order for the Contractor to complete scheduled work or work underway. In addition, the Department may renew the Contract after the completion of the original Term for two additional Terms of one year each, provided the Department and Contractor are in agreement and the following conditions are met:
1. The Contractor’s bonding agency provides written proof that it is in agreement with the Contract Renewal.
2. There are no increases in unit prices or to unit prices added to the original contract by any authorized Change Order thereto as a condition of the renewal.
3. No new work items are added as a condition of the renewal beyond those authorized in accordance with item 2. herein.
4. The Contractor provides proof of insurance for the Contract Renewal Term in accordance with Section 103.06.
Section 103.05(a) – REQUIREMENTS OF CONTRACT BOND is replaced with the following:
A performance bond, valued at the lesser of the Contract Value or $100,000, conditioned upon the faithful performance of the Contract in strict conformity with the Plans, the Specifications and conditions of the Contract.
Section 103.05(b) – REQUIREMENTS OF CONTRACT BOND is replaced by the following:
A payment bond, valued at the lesser of the Contract Value or $100,000, conditioned upon the prompt payment for all labor, materials, public utility services and rental of equipment used in the prosecution of the work for the Contract.
SECTION 104 – SCOPE OF WORK of the Specifications is amended as follows:
Section 104.01 – Intent of Contract is amended to replace the first sentence with the following:
The intent of this Contract is to provide for furnishing sufficient labor and equipment, delivering goods and services, and maintaining adequate material on hand to respond to the Department's need for timely completion of the Work assigned by Task Order in one or more of the Department's Construction Districts. This Contract shall be in accordance with Task Order plans and sketches and the Specifications and provisions herein. The estimated bid quantities are based on existing conditions or quantities historically used in the geographic area of the Contract. Renewable On Call contracts will serve as a cost effective and timely response contracting method when the Department anticipates the need for a variety of goods or services for specific purposes; however, the actual demand is not known and delivery of the goods or services is made when a requirement arises. Work on this Contract is to be performed, completed, and accepted within Task Order time limits and within the Term of the Contract. During the Term of the Contract, the Department will issue Task Orders to the Contractor with a cumulative value that will equal or exceed 70% of the original value of the Contract, unless the Contract is terminated according to Section 108.08 of the Specifications.
Section 104.02 – Alteration of Quantities or Character of Work is amended to include the following:
Quantity changes in an On Call Contract shall not be construed as a significant change.
Budgetary constraints may be imposed by the Department at any time during the life of the Contract. The Contractor will be notified if the Engineer determines that the cost of completing the Work will exceed available funding or budget as may be adjusted by the Department. Task Orders with work underway shall be completed or the work shall be suspended and the work site restored as directed by the Engineer. The Engineer will specify which previously issued Task Orders will be rescinded according to the Department’s predetermined priorities.
If further analysis indicates that the cost of work underway will fall below the limits of the budgeted funds, the Engineer may issue additional Task Orders to be completed by the Contractor at contract unit prices.
SECTION 105 – CONTROL OF WORK of the Specifications is amended as follows:
Section 105.01 – Notice to Proceed is amended to include the following:
Task Orders will be issued to the Contractor specifying the location, value, time limit, liquidated damages, and description of work or design plans of work to be performed. During the project, the Engineer will coordinate with the Contractor on anticipated Task Orders to assist inventory control.
Section 105.03(a) – Authority of the Engineer is amended to include the following:
The Engineer may extend the contract time limit or renew the contract in accordance with Section
103.02 herein.
SECTION 107 – LEGAL RESPONSIBILITIES of the Specifications is amended as follows:
Section 107.02 – Permits, Certifications, and Operations is amended to include the following:
All contract work shall conform to permit conditions and regulatory approvals as detailed in the proposal or provided to the Contractor with a Task Order.
SECTION 108 – PROSECUTION AND PROGRESS OF WORK of the Specifications is amended as follows:
Section 108.01 – Prosecution of Work of…