This is an Air Force First Article Requirements form (AFMC IMT 260) dated October 2, 2025, establishing first article testing and approval requirements for a specific contract item.
The document applies to PR/MIPR Number 98897/4V91084-101A with NSN 5998015998134UC and requires submission of one unit as part of the production quantity. The first article will not serve as a manufacturing standard. The item is subject to long lead time item requirements and special facility requirements, mandating that the first article be manufactured at the facilities where production items will be made, with required certification. Testing will be conducted by the contractor per Source Control Drawing 4V91084, with detailed technical requirements specified in Source Control Drawing 4L97525. A test plan is required with DD Form 1423 ELIN DI-NDTI-82327, due within 60 calendar days of contract award, and the contractor must notify 409 SCMS/GUEA/C-5 Avionics Engineering at least 30 days prior to testing. A test report (DD Form 1423 ELIN DI-NDTI-82326) is required within 270 calendar days of contract award and must be forwarded to 409scms.c5fat@us.af.mil and the FD2060 Special Handling Unit at Robins AFB, Georgia. Government approval or disapproval is due within 30 days of report receipt and 150 days of first article package receipt. The first article must be delivered within 180 calendar days to the FAT Unit at Robins AFB, with 30-day advance shipment notification required. Estimated government testing costs are $5,063. Approved first articles will be forwarded to Supply as part of the contract quantity; disapproved articles will be retained by WR-ALC pending disposition instructions. Potential waivers exist for offerors with prior satisfactory performance on identical or similar items within the past 36 months, subject to cognizant engineering verification. All documentation must be submitted electronically in PDF format to the listed email address.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRWA126R0014.pdf | ||
| CDRLS A001-A005.pdf | ||
| DD_FORM_1653.pdf | ||
| 9341UC_FirstArticleReq.pdf | ||
| AFMC_158.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
02 OCT 2025(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
98897 / 4V91084-101A
4. NSN
5998015998134UC
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM 1
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
X REQUIRED NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A. X CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
Design, Materials, Construction, Electrical, Form-Fit-Function, and any other requirements specified per the source control drawing 4V91084
B. The detailed technical requirements for First Article approval tests are contained in
Source Control Drawing 4L97525 including any specifications/tests referenced therein and manufacturer controlled technical data package.
(Cite Spec and Para number)
C. X TEST PLAN REQUIRED
(3) Number of days for government approval / disapproval days.
(1) DD Form 1423 ELIN
(2) Delivery due calendar days from date of contract.
D. Contractor's notification to ACO and
409 SCMS/GUEA/C-5 Avionics Engineering
(Requesting Activity) of test time and location due 30 days prior to start of testing.
E. X TEST REPORT REQUIRED
(3) Forwarded to
409scms.c5fat@us.af.mil
FD2060 Special Handling Unit
FAT Unit, 455 Byron Street
Robins AFB, GA 31098-1887
(4) Government written notice of approval / disapproval due
(2) Due
(1) DD Form 1423 ELIN days after receipt of contractor's report.
DI-NDTI-82326
DI-NDTI-82327
calendar days from date contract.
AFMC IMT 260, 20230316, V-5,
Version 2Generated by PRPS using Jasper Reports on 15 Jan 2026
PREVIOUS EDITION IS OBSOLETE
Prescribed by: AFMCI23-110
F. FIRST ARTICLE DELIVERY
(1) Due within 180 calendar days from date contract.
(2) Notify 30 calendar days prior to shipment.
(3) Delivered to government at
FD2060 Special Handling Unit
FAT Unit, 455 Byron Street
Robins AFB, GA 31098-1887
Mark for: FAT-DO NOT POST
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 150 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$5,063.0000
10. DISPOSITION OF FIRST ARTICLES
X Approved First Articles will be forwarded to
Supply
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles will be returned to the contractor
X will be retained by WR-ALC pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.
b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the X Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 36 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
AFMC IMT 260, 20230316, V-5,
Version 2Generated by PRPS using Jasper Reports on 15 Jan 2026
12. REMARKS
Amely, Thomas DNAME: 02 OCT 2025DATE:
Please send ALL documentation ELECTRONICALLY. Send PDF format copies of WAWF, Contract, and Vendor Certifications to 409scms.c5fat@us.af.mil . For documents over 25MB in size, send a request to the listed email for a DoD SAFE link.
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING
(Name, Organization, Phone)
Amely, Thomas D
409 SCMS / GU E A
478-926-7032
468-7032
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
AFMC IMT 260, 20230316, V-5,
Version 2Generated by PRPS using Jasper Reports on 15 Jan 2026
File details come from the government source that posted it. Updated .