80SSC023R00010003.pdf

PDF 766 KB Posted

Attached to
SSC Gaseous Nitrogen Generation Solution (GNGS) Federal contract opportunity
Solicitation number
80SSC023R0001
Issued by
National Aeronautics and Space Administration Stennis Space Center

About this file

This document contains an amendment to a solicitation for a gaseous nitrogen generation solution from NASA Stennis Space Center. The amendment provides an updated responsibility matrix delineating which items will be provided by NASA and which will be the responsibility of the offeror. Key responsibilities of the offeror include designing, fabricating, installing, activating, operating and maintaining the nitrogen generation system and associated piping and electrical connections within the property boundary. NASA will provide the primary electrical and cooling water connections and metering, as well as site access, security fencing and roadways. Questions received were answered to further clarify responsibilities. No changes were made to the terms or conditions of the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to SSC Gaseous Nitrogen Generation Solution (GNGS), newest first.
File Type Posted
80SSC023R00010008.pdf PDF
80SSC023R00010007.pdf PDF
80SSC023R00010006.pdf PDF
80SSC023R00010005.pdf PDF
80SSC023R00010004.pdf PDF
80SSC023R0001 Amendment 0002.pdf PDF
Attachment 16 - AB Complex Data Flow 220513.xlsx XLSX spreadsheet
Attachment 17 - E-Complex Data Flow 220513.xlsx XLSX spreadsheet
80SSC023R0001 Amend 0001 GNGS.pdf PDF
Attachment 2 - Pricing Sheet.xlsx XLSX spreadsheet
Attachment 2 - Pricing Sheet.xlsx XLSX spreadsheet
80SSC023R0001 RFP Cover Letter.pdf PDF
80SSC023R0001 GNGS RFP.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80SSC023R0001

Amendment 0003

14. DESCRIPTION OF AMENDMENT/MODIFICATION continued:

The purpose of this amendment is to incorporate the following changes/updates in response to questions received from the RFP:

Attachment 1a, Responsibility Matrix:

1. Reference Q&A # 16: Changed – Responsibility Matrix

(a) Updated Attachment 1a (changes in red).

Attachment 15, Responses to RFP Questions:

2. Updated Attachment 15 to provide responses to additional RFP Questions.

All other terms and conditions remain unchanged.

Responsibility Matrix

The purpose of this doccument is not to establish requirements that a vendor must utilize, but to communicate to a potential vendor what will be provided by

NASA and what NASA expects a vendor to provide.

System Description NASA Vendor Notes

Nitrogen

Generation

System X Vendor will design, fab, install, activate, operate and maintain N2 Gen System

Nitrogen Gas Outside Property Boundary X Connection from site to existing nitrogen system

Piping Inside Property Boundary X All piping internal to site boundary

Primary Electrical Power X Electrical power will be metered and paid for by NASA

Supply Design X X Vendor provides requirements; NASA provides Electrical Supply Design

Transmission Poles X

Transformer X

Transformer Pad Mount X

Feeded Cable X

Electrical Meter X

Termination Kits X

Electrical EMCS Connectivity of Power Supply X

Grounding Grid X

MCC X

Switchgear X

Electrical Generator X

Diesel / propane storage tank X

Diesel / propane X

Area Flood Lighting X

Field Electrical Connections X

Construction Power X Electrical power supply during Construction

Cooling Water Feed Connectivity Piping X

Cooling Water Supply Water X

EMCS Connectivity of Water Supply X

Water Supply Recirc Cooling Water System X

Firex Water Feed Connectivity Piping X

Firex Suppy Water X

Water Meter X

Construction Water X

Condensate Discharge Composition

(preliminary estimates) X

Condensate Discharge Infrastructure X

Discharges Non-Nitrogen Effluent Discharge

Composition (preliminary estimates) X

Non-Nitrogen Effluent Discharge

Infrastructure X

Clear, Level and Rough Grade X

Asphault 9.5mm and 12.5mm Mixtures X

Gravel and Clay base X

Earthwork X

Culverts X

Civil Work Road Striping X

Security Fence w/3-strand barbed wire X

Dual Entrance Gate X

Water drainage X

Construction Lay Down Area X

Concrete Pad X

Broadband internet connections to be made to existing outside NASA network line. NASA will run cable and conduit up to an interior space. Vendor will purchase (1) new external gateway circuit to be delivered via one of the

Internet Service Providers demarked in Bldg 9357. Interior Comm Space and

Rack/Cabinet supplied by vendor. Vendor purchases internet communication

Comms Broadband Internet X X from service provider

Natural Gas Natural Gas Available if requested Can be made available upon request

Freight delivery X Receipt of freight deliveries

Other Off loading X Off loading of equipment received

24/7 access to area X Site access badges will be provided by NASA

80SSC023R0001

Amendment 0003

Attachment 1a

80SSC023R0001, SSC Gaseous Nitrogen Generation Solution (GNGS)

Solicitation Questions and Answers Lo2 Question No. Reference Question / Comment Response

In the absence of SSC specifications, N2 Generation and Supply systems are being classified as Risk Category II. However, if SSC requires the systems be classified Any onsite stiucture related to GNGS should be categorized as Risk Category with a higher risk categ01y based on their own operations/standard, etc., please IV. Using the American Society of Civil Engineers (ASCE) standard, ASCE advise as soon as possible. The classification of the Risk Category for the project 7-16, it drives the classification to Risk Catego1y IV since any GNGS

(https ://codes. iccsafe. org/ content/IBC202 I P2/chapter-I 6-struct:ural- structure would be categorized as "essential." This is due to the fact that design#IBC202 IP2 _ Chi 6 _ Sec 1604.5) has a significant effect on structural design gaseous niti·ogen is needed by the test stands at all times for purging and therefore, contemplation of constrnction costs of the foundation and hazardous substances.

anchorage.

Please confirm if all the Electrical hardware (MCC, Switchgear, Transfo1mer, etc.)

Refer to Attachment I a, Responsibility Mati·ix, which annotates NASA or the

16 required for the operation ofN2 Generator and Backup system is within the scope offeror's responsibility to provide. NASA will supply power meeting the of SSC's desired solution.

requirements specified by the vendor. NASA will provide the Transfo1mer, and the offeror will supply the Switchgear and MCC.

Note: Offeror would work with SSC to design the Electrical hardware. Offerors' Refer to Attachment I a, Responsibility Mati·ix, which am1otates NASA or the

17 scope would include cabling and tenninations from Electrical hardware to end offeror's responsibility to provide. The successful offeror will provide Field

Electrical Connections including cabling and terminations inside the Property users such as Compressors, pumps, etc.

Bounda1y.

Changes / Comments

No change

80SSC023R000 1

Amendment 0003

Attachment 15

Attachment la, Responsibility Matrix

No change