FBR
FULLY BURDENED RATES (FBR) TEMPLATE
| Identify Whether the Company is a: |
| [ ] Prime Offeror |
| [ ] Major Subcontractor |
| Contract Year 1 FBR Development | ||||||||||||||||||||||||||||
| Prime Offeror Completes the area below this green row | ||||||||||||||||||||||||||||
| Major Subcontractors complete the area below this red row | ||||||||||||||||||||||||||||
| Subcontract Price Input Area (inputed here by prime) | ||||||||||||||||||||||||||||
| NASA | % Incumbents | Direct Labor | Overhead | Overhead | G&A | G&A | Composite | Composite | Composite Overtime | |||||||||||||||||||
| Offeror's Labor Category | NASA Standard Labor Category (SLC) | At Current DL Rates | % usage | Rate | Rate | Cost | Rate | Cost | FCCOM | Profit (sub only) | Other | Prime or Major Subcontractor FBR per hr | Subcontractor "A" FBR/hr * | Subcontractor "B" FBR/hr * | Subcontractor "C" FBR/hr * | Prime Burdens Rate Percent ** | Subcontractor "A" FBR + Prime Burdened Rate/hr | Subcontractor "B" FBR + Prime Burdened Rate/hr | Subcontractor "C" FBR + Prime Burdened Rate/hr | % Usage Prime | % Usage Subcontractor "A" | % Usage Subcontractor "B" | % Usage Subcontractor "C" | Prime & Sub FBR /hr | Prime's Profit Rate | Prime & Sub FBR /hr *** | Prime & Sub FBR /hr | |
| Example: | ||||||||||||||||||||||||||||
| Secretary Junior | 75% | 28.75 | MAJOR SUBCONTRACTOR STOPS HERE & PROVIDES FBR TO PRIME | - 0 | ||||||||||||||||||||||||
| Secretary Intern | 25% | 25.25 | - 0 | |||||||||||||||||||||||||
| JSC Secretary I | 90% | 100% | 27.88 | 75% | 20.91 | 6% | 2.93 | - 0 | 51.71 | 59.50 | 55.00 | 61.00 | 6% | $ 63.07 | $ 58.30 | $ 64.66 | 70% |
Author: Author:
The total percentage usage for the prime offeror and all subcontractors for each SLC shall equal 100%. 20% Author: Author:
The total percentage usage for the prime offeror and all subcontractors for each SLC shall equal 100%. 5% Author: Author:
The total percentage usage for the prime offeror and all subcontractors for each SLC shall equal 100%. 5% Author: Author:
The total percentage usage for the prime offeror and all subcontractors for each SLC shall equal 100%. 54.96 Author: Author:
This is an example of a Prime Offeror's FBR Template. For a subcontractor, entries into this template would have ended in column M. 8% 59.35 89.03
| Program Manager |
| Supervisor |
| Training Specialist |
| SSC Secretary I |
| SSC Secretary II |
| SSC Secretary III |
| SSC Administrative Assistant |
| SSC Administrative Assitsant I |
| SSC Administrative Assitsant II |
| JSC Secretary I |
| JSC Secretary II |
| JSC Secretary III |
| JSC Administrative Assistant |
| JSC Administrative Assitsant I |
| JSC Administrative Assitsant II |
| WSTF Secretary I |
| WSTF Secretary II |
| WSTF Secretary III |
| WSTF Administrative Assistant |
| WSTF Administrative Assistant I |
| WSTF Administrative Assistant II |
| Other |
| * These columns represent the proposed major and minor subcontractor(s) fully burdened rates (FBR) by SLC. Identify subcontractors by name in the template. |
| ** The Prime contractor may apply a burden rate to the major and minor subcontractor(s) FBR if applicable. |
| *** This column represents the composite FBR for the prime offeror and all its proposed subcontractor(s) by SLC. These composite FBRs shall match the FBRs in Section 1 of the contract. IMPORTANT: If subcontractors are proposed, include a formula in this column showing the calculation of the composite rates. |
| NOTE: PLEASE REMEMBER TO REMOVE EXAMPLE FORMULAS FROM TEMPLATES |
| Contract Year 2 FBR Development | Escalation Rate | 2.25% | ||||||||||||||||||||||||||
| Prime Completes the area below this green row | ||||||||||||||||||||||||||||
| Major Subcontractor completes the area below this red row | ||||||||||||||||||||||||||||
| Subcontract Price Input Area (inputed here by prime) | ||||||||||||||||||||||||||||
| NASA | % Incumbents | Direct Labor | Overhead | Overhead | G&A | G&A | Composite | Composite | Composite Overtime | |||||||||||||||||||
| Offeror's Labor Category | NASA Standard Labor Category (SLC) | At Current DL Rates | % usage | Rate | Rate | Cost | Rate | Cost | FCCOM | Fee (sub only) | Other | Prime or Major Subcontractor FBR per hr | Subcontractor "A" FBR/hr * | Subcontractor "B" FBR/hr * | Subcontractor "C" FBR/hr * | Prime Burdens Rate /hr ** | Subcontractor "A" FBR + Prime Burdened Rate/hr | Subcontractor "B" FBR + Prime Burdened Rate/hr | Subcontractor "C" FBR + Prime Burdened Rate/hr | % Usage Prime | % Usage Subcontractor "A" | % Usage Subcontractor "B" | % Usage Subcontractor "C" | Prime & Sub FBR /hr | Prime's Profit Rate | Prime & Sub FBR /hr *** | Prime & Sub FBR /hr *** | |
| Example: | ||||||||||||||||||||||||||||
| IT Staff IV | 75% | 29.40 | MAJOR SUBCONTRACTOR STOPS HERE & PROVIDES FBR TO PRIME | - 0 | ||||||||||||||||||||||||
| IT Professional | 25% | 25.82 | - 0 | |||||||||||||||||||||||||
| IT Professional II | 100% | 100% | 28.50 | 75% | 21.38 | 6% | 2.99 | - 0 | 52.87 | 59.50 | 55.00 | 61.00 | 6% | $ 63.07 | $ 58.30 | $ 64.66 | 70% | 20% | 5% | 5% | 55.77 |
Author: Author:
This is an example of a Prime Offeror's FBR Template. For a subcontractor, entries into this template would have ended in column M.
Author: Author:
The total percentage usage for the prime offeror and all subcontractors for each SLC shall equal 100%. 8% 60.23 90.35
| Temporary |
| Program Manager |
| Supervisor |
| Training Specialist |
| SSC Secretary I |
| SSC Secretary II |
| SSC Secretary III |
| SSC Administrative Assistant |
| SSC Administrative Assitsant I |
| SSC Administrative Assitsant II |
| JSC Secretary I |
| JSC Secretary II |
| JSC Secretary III |
| JSC Administrative Assistant |
| JSC Administrative Assitsant I |
| JSC Administrative Assitsant II |
| WSTF Secretary I |
| WSTF Secretary II |
| WSTF Secretary III |
| WSTF Administrative Assistant |
| WSTF Administrative Assistant I |
| WSTF Administrative Assistant II |
| Other |
| * These columns represent the proposed major and minor subcontractor(s) fully burdened rates (FBR) by SLC. Identify subcontractors by name in the template. |
| ** The Prime contractor may apply a burden rate to the major and minor subcontractor(s) FBR if applicable. |
| *** This column represents the composite FBR for the prime offeror and all its proposed subcontractor(s) by SLC. These composite FBRs shall match the FBRs in Section 1 of the contract. IMPORTANT: If subcontractors are proposed, include a formula in this column showing the calculation of the composite rates. |
| NOTE: PLEASE REMEMBER TO REMOVE EXAMPLE FORMULAS FROM TEMPLATES |
| Contract Year 3 FBR Development | Escalation Rate | 2.50% | ||||||||||||||||||||||||||
| Prime Completes the area below this green row | ||||||||||||||||||||||||||||
| Major Subcontractor completes the area below this red row | ||||||||||||||||||||||||||||
| Subcontract Price Input Area (inputed here by prime) | ||||||||||||||||||||||||||||
| NASA | % Incumbents | Direct Labor | Overhead | Overhead | G&A | G&A | Composite | Composite | Composite Overtime | |||||||||||||||||||
| Offeror's Labor Category | NASA Standard Labor Category (SLC) | At Current DL Rates | % usage | Rate | Rate | Cost | Rate | Cost | FCCOM | Fee (sub only) | Other | Prime or Major Subcontractor FBR per hr | Subcontractor "A" FBR/hr * | Subcontractor "B" FBR/hr * | Subcontractor "C" FBR/hr * | Prime Burdens Rate /hr ** | Subcontractor "A" FBR + Prime Burdened Rate/hr | Subcontractor "B" FBR + Prime Burdened Rate/hr | Subcontractor "C" FBR + Prime Burdened Rate/hr | % Usage Prime | % Usage Subcontractor "A" | % Usage Subcontractor "B" | % Usage Subcontractor "C" | Prime & Sub FBR /hr | Prime's Profit Rate | Prime & Sub FBR /hr *** | Prime & Sub FBR /hr *** | |
| Example: | ||||||||||||||||||||||||||||
| IT Staff IV | 75% | 30.13 | MAJOR SUBCONTRACTOR STOPS HERE & PROVIDES FBR TO PRIME | - 0 | ||||||||||||||||||||||||
| IT Professional | 25% | 26.46 | - 0 | |||||||||||||||||||||||||
| IT Professional II | 100% | 100% | 29.21 | 75% | 21.91 | 6% | 3.07 | - 0 | 54.19 | 59.50 | 55.00 | 61.00 | 6% | $ 63.07 | $ 58.30 | $ 64.66 | 70% | 20% | 5% | 5% | 56.70 |
Author: Author:
This is an example of a Prime Offeror's FBR Template. For a subcontractor, entries into this template would have ended in column M. 8% 61.23 91.85
| Temporary |
| Program Manager |
| Supervisor |
| Training Specialist |
| SSC Secretary I |
| SSC Secretary II |
| SSC Secretary III |
| SSC Administrative Assistant |
| SSC Administrative Assitsant I |
| SSC Administrative Assitsant II |
| JSC Secretary I |
| JSC Secretary II |
| JSC Secretary III |
| JSC Administrative Assistant |
| JSC Administrative Assitsant I |
| JSC Administrative Assitsant II |
| WSTF Secretary I |
| WSTF Secretary II |
| WSTF Secretary III |
| WSTF Administrative Assistant |
| WSTF Administrative Assistant I |
| WSTF Administrative Assistant II |
| Other |
| * These columns represent the proposed major and minor subcontractor(s) fully burdened rates (FBR) by SLC. Identify subcontractors by name in the template. |
| ** The Prime contractor may apply a burden rate to the major and minor subcontractor(s) FBR if applicable. |
| *** This column represents the composite FBR for the prime offeror and all its proposed subcontractor(s) by SLC. These composite FBRs shall match the FBRs in Section 1 of the contract. IMPORTANT: If subcontractors are proposed, include a formula in this column showing the calculation of the composite rates. |
| NOTE: PLEASE REMEMBER TO REMOVE EXAMPLE FORMULAS FROM TEMPLATES |
| Contract Year 4 FBR Development | Escalation Rate | 2.25% | ||||||||||||||||||||||||||
| Prime Completes the area below this green row | ||||||||||||||||||||||||||||
| Major Subcontractor completes the area below this red row | ||||||||||||||||||||||||||||
| Subcontract Price Input Area (inputed here by prime) | ||||||||||||||||||||||||||||
| NASA | % Incumbents | Direct Labor | Overhead | Overhead | G&A | G&A | Composite | Composite | Composite Overtime | |||||||||||||||||||
| Offeror's Labor Category | NASA Standard Labor Category (SLC) | At Current DL Rates | % usage | Rate | Rate | Cost | Rate | Cost | FCCOM | Fee (sub only) | Other | Prime or Major Subcontractor FBR per hr | Subcontractor "A" FBR/hr * | Subcontractor "B" FBR/hr * | Subcontractor "C" FBR/hr * | Prime Burdens Rate /hr ** | Subcontractor "A" FBR + Prime Burdened Rate/hr | Subcontractor "B" FBR + Prime Burdened Rate/hr | Subcontractor "C" FBR + Prime Burdened Rate/hr | % Usage Prime | % Usage Subcontractor "A" | % Usage Subcontractor "B" | % Usage Subcontractor "C" | Prime & Sub FBR /hr | Prime's Profit Rate | Prime & Sub FBR /hr *** | Prime & Sub FBR /hr *** | |
| Example: | ||||||||||||||||||||||||||||
| IT Staff IV | 75% | 30.81 | MAJOR SUBCONTRACTOR STOPS HERE & PROVIDES FBR TO PRIME | - 0 | ||||||||||||||||||||||||
| IT Professional | 25% | 27.06 | - 0 | |||||||||||||||||||||||||
| IT Professional II | 100% | 100% | 29.87 | 75% | 22.40 | 6% | 3.14 | - 0 | 55.41 | 59.50 | 55.00 | 61.00 | 6% | $ 63.07 | $ 58.30 | $ 64.66 | 70% | 20% | 5% | 5% | 57.55 |
Author: Author:
This is an example of a Prime Offeror's FBR Template. For a subcontractor, entries into this template would have ended in column M. 8% 62.15 93.23
| Temporary |
| Program Manager |
| Supervisor |
| Training Specialist |
| SSC Secretary I |
| SSC Secretary II |
| SSC Secretary III |
| SSC Administrative Assistant |
| SSC Administrative Assitsant I |
| SSC Administrative Assitsant II |
| JSC Secretary I |
| JSC Secretary II |
| JSC Secretary III |
| JSC Administrative Assistant |
| JSC Administrative Assitsant I |
| JSC Administrative Assitsant II |
| WSTF Secretary I |
| WSTF Secretary II |
| WSTF Secretary III |
| WSTF Administrative Assistant |
| WSTF Administrative Assistant I |
| WSTF Administrative Assistant II |
| Other |
| * These columns represent the proposed major and minor subcontractor(s) fully burdened rates (FBR) by SLC. Identify subcontractors by name in the template. |
| ** The Prime contractor may apply a burden rate to the major and minor subcontractor(s) FBR if applicable. |
| *** This column represents the composite FBR for the prime offeror and all its proposed subcontractor(s) by SLC. These composite FBRs shall match the FBRs in Section 1 of the contract. IMPORTANT: If subcontractors are proposed, include a formula in this column showing the calculation of the composite rates. |
| NOTE: PLEASE REMEMBER TO REMOVE EXAMPLE FORMULAS FROM TEMPLATES |
| Contract Year 5 FBR Development | Escalation Rate | 2.25% | ||||||||||||||||||||||||||
| Prime Completes the area below this green row | ||||||||||||||||||||||||||||
| Major Subcontractor completes the area below this red row | ||||||||||||||||||||||||||||
| Subcontract Price Input Area (inputed here by prime) | ||||||||||||||||||||||||||||
| NASA | % Incumbents | Direct Labor | Overhead | Overhead | G&A | G&A | Composite | Composite | Composite Overtime | |||||||||||||||||||
| Offeror's Labor Category | NASA Standard Labor Category (SLC) | At Current DL Rates | % usage | Rate | Rate | Cost | Rate | Cost | FCCOM | Fee (sub only) | Other | Prime or Major Subcontractor FBR per hr | Subcontractor "A" FBR/hr * | Subcontractor "B" FBR/hr * | Subcontractor "C" FBR/hr * | Prime Burdens Rate /hr ** | Subcontractor "A" FBR + Prime Burdened Rate/hr | Subcontractor "B" FBR + Prime Burdened Rate/hr | Subcontractor "C" FBR + Prime Burdened Rate/hr | % Usage Prime | % Usage Subcontractor "A" | % Usage Subcontractor "B" | % Usage Subcontractor "C" | Prime & Sub FBR /hr | Prime's Profit Rate | Prime & Sub FBR /hr *** | Prime & Sub FBR /hr *** | |
| Example: | ||||||||||||||||||||||||||||
| IT Staff IV | 75% | 31.50 | MAJOR SUBCONTRACTOR STOPS HERE & PROVIDES FBR TO PRIME | - 0 | ||||||||||||||||||||||||
| IT Professional | 25% | 27.67 | - 0 | |||||||||||||||||||||||||
| IT Professional II | 100% | 100% | 30.54 | 75% | 22.91 | 6% | 3.21 | - 0 | 56.66 | 59.50 | 55.00 | 61.00 | 6% | $ 63.07 | $ 58.30 | $ 64.66 | 70% | 20% | 5% | 5% | 58.42 |
Author: Author:
This is an example of a Prime Offeror's FBR Template. For a subcontractor, entries into this template would have ended in column M.
Author: Author:
The total percentage usage for the prime offeror and all subcontractors for each SLC shall equal 100%.
Author: Author:
The total percentage usage for the prime offeror and all subcontractors for each SLC shall equal 100%.
Author: Author:
The total percentage usage for the prime offeror and all subcontractors for each SLC shall equal 100%.
Author: Author:
This is an example of a Prime Offeror's FBR Template. For a subcontractor, entries into this template would have ended in column M.
Author: Author:
This is an example of a Prime Offeror's FBR Template. For a subcontractor, entries into this template would have ended in column M.
Author: Author:
This is an example of a Prime Offeror's FBR Template. For a subcontractor, entries into this template would have ended in column M. 8% 63.10 94.65
| Temporary |
| Program Manager |
| Supervisor |
| Training Specialist |
| SSC Secretary I |
| SSC Secretary II |
| SSC Secretary III |
| SSC Administrative Assistant |
| SSC Administrative Assitsant I |
| SSC Administrative Assitsant II |
| JSC Secretary I |
| JSC Secretary II |
| JSC Secretary III |
| JSC Administrative Assistant |
| JSC Administrative Assitsant I |
| JSC Administrative Assitsant II |
| WSTF Secretary I |
| WSTF Secretary II |
| WSTF Secretary III |
| WSTF Administrative Assistant |
| WSTF Administrative Assistant I |
| WSTF Administrative Assistant II |
| Other |
| * These columns represent the proposed major and minor subcontractor(s) fully burdened rates (FBR) by SLC. Identify subcontractors by name in the template. |
| ** The Prime contractor may apply a burden rate to the major and minor subcontractor(s) FBR if applicable. |
| *** This column represents the composite FBR for the prime offeror and all its proposed subcontractor(s) by SLC. These composite FBRs shall match the FBRs in Section 1 of the contract. IMPORTANT: If subcontractors are proposed, include a formula in this column showing the calculation of the composite rates. |
| NOTE: PLEASE REMEMBER TO REMOVE EXAMPLE FORMULAS FROM TEMPLATES |
SPT
| Summary Price Template (SPT) |
| Required of the Prime Contractor Only |
Prime Contractor's Name:
| NASA - Standard Labor Category (SLC) | Base Contract | |||||||
| Straight-Time Hours | Full Time Equivalent (FTE) (Annual 5 Yr Average) | Productive Hours (Conversion Factor) | Contract Year 1 Hours | Contract Year 2 Hours | Contract Year 3 Hours | Contract Year 4 Hours | Contract Year 5 Hours | Total 1-5 |
| Full-Time | ||||||||
| Program Manager | ||||||||
| Supervisor | ||||||||
| Training Specialist | ||||||||
| SSC Secretary I | - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| SSC Secretary II | - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| SSC Secretary III | 2.0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| SSC Administrative Assistant | 13.0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| SSC Administrative Assitsant I | - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| SSC Administrative Assitsant II | - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| JSC Secretary I | - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| JSC Secretary II | 38.5 | 0 | 0 | 0 | 0 | 0 | 0 | |
| JSC Secretary III | 76.8 | 0 | 0 | 0 | 0 | 0 | 0 | |
| JSC Administrative Assistant | 20.8 | 0 | 0 | 0 | 0 | 0 | 0 | |
| JSC Administrative Assitsant I | 6.0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| JSC Administrative Assitsant II | 1.0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| WSTF Secretary I | - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| WSTF Secretary II | - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| WSTF Secretary III | 5.5 | 0 | 0 | 0 | 0 | 0 | 0 | |
| WSTF Administrative Assistant | 1.0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| WSTF Administrative Assistant I | - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| WSTF Administrative Assistant II | - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Other | - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 164.6 | 0 | 0 | 0 | 0 | 0 | 0 |
| Contract Rates (From FBR-FT) | Contract Fully Burdened Labor Rates (From FBR-FT) | ||||
| Full-Time | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 |
| Program Manager | |||||
| Supervisor | |||||
| Training Specialist | |||||
| SSC Secretary I | |||||
| SSC Secretary II | |||||
| SSC Secretary III | |||||
| SSC Administrative Assistant | |||||
| SSC Administrative Assitsant I | |||||
| SSC Administrative Assitsant II | |||||
| JSC Secretary I | |||||
| JSC Secretary II | |||||
| JSC Secretary III | |||||
| JSC Administrative Assistant | |||||
| JSC Administrative Assitsant I | |||||
| JSC Administrative Assitsant II | |||||
| WSTF Secretary I | |||||
| WSTF Secretary II | |||||
| WSTF Secretary III | |||||
| WSTF Administrative Assistant | |||||
| WSTF Administrative Assistant I | |||||
| WSTF Administrative Assistant II | |||||
| Other |
| Labor Cost | Fully-Burdened Labor Cost | |||||
| Full- Time | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total 1-5 |
| Program Manager | 0 | |||||
| Supervisor | 0 | |||||
| Training Specialist | 0 | |||||
| SSC Secretary I | 0 | |||||
| SSC Secretary II | 0 | |||||
| SSC Secretary III | 0 | |||||
| SSC Administrative Assistant | 0 | |||||
| SSC Administrative Assitsant I | 0 | |||||
| SSC Administrative Assitsant II | 0 | |||||
| JSC Secretary I | 0 | |||||
| JSC Secretary II | 0 | |||||
| JSC Secretary III | 0 | |||||
| JSC Administrative Assistant | 0 | |||||
| JSC Administrative Assitsant I | 0 | |||||
| JSC Administrative Assitsant II | 0 | |||||
| WSTF Secretary I | 0 | |||||
| WSTF Secretary II | 0 | |||||
| WSTF Secretary III | 0 | |||||
| WSTF Administrative Assistant | 0 | |||||
| WSTF Administrative Assistant I | 0 | |||||
| WSTF Administrative Assistant II | 0 | |||||
| Other | 0 | |||||
| Total Fully-Burdened Labor Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Travel | $ 18,269 | $ 18,817 | $ 19,381 | $ 19,963 | $ 20,562 | $ 96,991 |
| Indirect Cost Applied to Travel (Identify Indirect Rate Used) | $ - 0 | |||||
| Subtotal - Travel Plus Indirect on Travel | $ 18,269 | $ 18,817 | $ 19,381 | $ 19,963 | $ 20,562 | $ 96,991 |
| Profit on (Travel + Indirect on Travel) (Identify Profit Rate) | $ - 0 | |||||
| Total Travel Cost + Profit on Travel | $ 18,269 | $ 18,817 | $ 19,381 | $ 19,963 | $ 20,562 | $ 96,991 |
Total Price $ 18,269 $ 18,817 $ 19,381 $ 19,963 $ 20,562 $ 96,991
| The FBR-FT provided here shall agree with the FBR-FT provided in Section One of the Contract |
| The FBR-FT in this template shall be linked from the FBR-FT template |
| The estimated annual travel cost is provided. These amounts are to be included unchanged in the total price. |
| If appropriate, apply indirect cost and profit on the travel cost in accordance with your Accounting System and Accounting Policies. |
| The formulae in this worksheet is provided to assist in developing the final proposed price. However, it is the Offeror's responsibility to verify formulae and to provide an accurate proposal. |
80SSC019R0007 DASS DRFP Attachment 5.EPM
&F &A &P
TC(a) Compensation Template (a): Salaries and Wages Non-Exempt
| NON-EXEMPT |
| Salaries and Wages Non-Exempt |
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
Actual Incumbent Labor Rate (For Incumbent's Use Only) Department of Labor (DOL) Covered Personnel Rate Contract Year 1 Actual Proposed Labor Rate FTEs
| LABOR CATEGORY MAPPING | |||||||
| Category as per | Proposed Labor Escalation % | ||||||
| Government SLC * | Offeror's | DOL WD or CBA | Yr2 | Yr3 | Yr4 | Yr5 | Source |
| Example: | |||||||
| Technician 1 | Electronic Technician I | Electronic Technician II | $ 13.00 | $ - 0 | $ 13.00 | 1 | |
| Mechanical Technician II | Mechanical Technician II | $ 13.00 | 5 | ||||
| Test Technician II | Non destructive Test Technician III | $ 14.00 | $ 15.00 | 3 | DOL2005-2516 |
COMPOSITE (Weighted Average) $ 13.67
| Program Manager |
| Supervisor |
| Training Specialist |
| SSC Secretary I |
| SSC Secretary II |
| SSC Secretary III |
| SSC Administrative Assistant |
| SSC Administrative Assitsant I |
| SSC Administrative Assitsant II |
| JSC Secretary I |
| JSC Secretary II |
| JSC Secretary III |
| JSC Administrative Assistant |
| JSC Administrative Assitsant I |
| JSC Administrative Assitsant II |
| WSTF Secretary I |
| WSTF Secretary II |
| WSTF Secretary III |
| WSTF Administrative Assistant |
| WSTF Administrative Assistant I |
| WSTF Administrative Assistant II |
| Other |
* It is possible that these Government SLCs may be defined as either exempt or non-exempt labor categories.
&12 80SSC019R0007 DASS DRFP Attachment 5.EPM
TC(b)
| Compensation Template (b): Fringe Benefits Analysis of Compensation Package |
| Fringe Benefits Analysis of Compensation Package |
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
| [ ] Exempt | |
| [ ] Non-Exempt Non-Union | NUMBER OF PROPOSED PERSONNEL (FTE) |
| [ ] Non-Exempt Union | NUMBER OF DIRECT LABOR HOURS |
| COST OF | PERCENT | AVERAGE | ||
| FRINGE | OF DIRECT | COST PER | ||
| CATEGORY | BENEFIT | LABOR COST | LABOR HOUR | DESCRIPTION OF BENEFIT |
| HEALTH AND WELFARE: | ||
| LIFE INSURANCE | ||
| DISABILITY INSURANCE | Number of | |
| HEALTH INSURANCE | Days Per Year | |
| DENTAL INSURANCE | ||
| SICK LEAVE | ________ | |
| CIVIC AND PERSONAL LEAVE | ________ | |
| OTHER LEAVE | ________ | |
| RETIREMENT | ||
| SAVINGS/THRIFT PLAN | ||
| SEVERENCE PAY | ||
| TUITION REIMBURSEMENT | ||
| OTHER (Identify) | ||
| TOTAL HEALTH AND WELFARE | ||
| Number of | ||
| TOTAL VACATION AND HOLIDAY: | Eligibility | Days Per Year |
| VACATION | ______ Years to ______ Years | ________ |
| ______ Years to ______ Years | ________ | |
| ______ Years to ______ Years | ________ | |
| ______ Years to ______ Years | ________ | |
| ______ Years to ______ Years | ________ | |
| ______ Years to ______ Years | ________ | |
| HOLIDAYS | ________ |
TOTAL VACATION AND HOLIDAY ________
TOTAL FRINGE BENEFITS _________
80SSC019R0007 DASS DRFP Attachment 5.EPM
PIT
| PHASE-IN TEMPLATE (PIT) |
| Prime Offeror Company Name: |
| Cost Element | Hours | Rate | Cost |
| Direct Labor (DL): | |||
| Skill mix: (identify from SLC or Other Labor Category) |
Total Direct Labor
| Indirect Cost: |
| Overhead |
| Other Indirect (If Applicable) |
Total Indirect Cost
| Major Subcontractor Total Cost (list): |
| 1. |
| 2. |
| 3. |
| 4. |
| Total Major Subcontractor Cost |
| Minor Subcontractor Total Cost: |
| 1. |
| 2. |
| 3. |
| Total Minor Subcontractor Costs |
| Prime Non-Labor Resources (NLR): |
| Material/Supplies/Equipment |
| Travel/Training |
| Service Agreements, Outsourcing & Consultant Fees |
| Other |
| Total Non-Labor Resources Cost |
| Subtotal Direct Labor, Subcontractors, Indirect Cost & NLR Cost |
| Prime Total G&A Cost |
| Subtotal Estimated Cost |
| Profit |
Total Estimated (Price) Cost & Profit
Note: PIT shall be proposed on a fixed price basis.
80SSC019R0007 DASS DRFP Attachment 5.EPM