SATPC0043318 Tab 04 4 SOW.pdf

PDF 189 KB Posted

Attached to
Costworks SW Renewal
Solicitation number
80NSSC27949920Q
Issued by

About this file

This is a Statement of Work (SOW) for NASA Kennedy Space Center's renewal of an RSMeans Costworks Network Agreement software license. KSC requires 20 RSMeans Costworks Network Agreements to support personnel in developing Independent Government Cost Estimates (IGCEs) for construction projects and construction-related task orders. The software license includes digital access to multiple cost data resources: Building Construction Cost Data (including Metric Construction Costs and Building Construction Cost Open Shop variants), Mechanical Cost, Electrical Cost, Plumbing Cost, Interior Cost (including Light Commercial Cost variant), Commercial Square Foot Cost, and Residential Cost data.

Performance will be conducted at NASA Kennedy Space Center, COMET Warehouse K6-1547, Kennedy Space Center, FL 32899, with a performance period running from February 15, 2027, through February 15, 2028. This is a continuation of an existing software license agreement, indicating the renewal of previously established services rather than a new procurement.

View the file

Other files

File Type Posted
SATPC0043318 Tab 07 Capability Statement.pdf PDF
SATPC0043318 Tab 06 RDSS..pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

The NASA Kennedy Space Center (KSC) requires the renewal of RSMeans Costworks Network Agreement which is a continuation of an existing site software license used by KSC personnel to develop Independent Government Cost Estimates (IGCEs) for construction projects and construction-related task orders.

2. Characteristics, Scope, and Specs

Quantity Product Description

RSMeans Costworks Network Agreement

Digital Book Title Included:

• Building Construction Cost Data o Metric Construction Costs o Bldg Constr Cost Open Shop

• Mechanical Cost

• Electrical Cost

• Plumbing Cost

• Interior Cost o Light Commercial Cost

• Commercial Square Foot Cost o Residential Cost

3. Place of Performance NASA/ Kennedy Space Center COMET Warehouse K6-1547 Kennedy Space Center, FL 32899

4. Period of Performance

2/15/2027 – 2/15/2028

File details come from the government source that posted it. Updated .