RFQ.pdf

PDF 982 KB Posted

Attached to
PC-12 Annual Maintenance
Solicitation number
80NSSC27949241Q-1
Issued by

About this file

Request for Quotation Summary

This is a Request for Quotation (RFQ) issued by NASA's Shared Services Center for Pilatus PC-12 annual maintenance services. The solicitation number is 80NSSC27949241Q-1, with a release date of November 24, 2026, and a quote submission deadline of November 30, 2026, by 4:00 p.m. Central Time to tracy.g.bremer@nasa.gov. The procurement is full and open competition with a NAICS code of 336411, and the total firm-fixed price is to be determined. Quotes must remain valid for 30 days, and offerors must be registered at sam.gov and provide their Cage Code/UEI number, ARO delivery time, and FOB Destination information with their response.

The scope requires an FAA and Pilatus-certified repair station located within the contiguous United States to perform comprehensive annual maintenance on Pilatus PC-12 aircraft N606NA (serial number 1081) at the contractor's facility. The maintenance period is 6 weeks from aircraft delivery between December 9-11, 2026, and must include annual inspection packages, engine inspections, airworthiness directives compliance, and various system checks totaling 23 specific maintenance tasks. Deliverables include the aircraft in airworthy condition, FAA 8130-3 Authorized Release Certificates, maintenance documentation, progress reports at minimum bi-weekly intervals, and updates to NASA's Aircraft Management Information System. The contractor must comply with AS9100 and ISO 9001 quality standards, Q-1A and Q-3 quality requirements, provide a certificate of conformance, and allow NASA personnel on-site observation and participation in maintenance activities. Payment terms are NET 30 with delivery FOB Destination. Award will be made to the lowest price technically acceptable offeror whose quote demonstrates capability to meet all stated requirements in a satisfactory manner.

View the file

Other files

File Type Posted
SOW.pdf PDF
SOW.pdf PDF
Q-1C.pdf PDF
Q-3.pdf PDF
Q-1A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 V15 NOV 2026

National Aeronautics and Space Administration

NASA Shared Services Center Stennis Space Center, MS 39529-6000

11/24/2026

SUBJECT: Request for Quotation (RFQ) 80NSSC27949241Q-1, PC-12 Annual Maintenance

This solicitation includes the following sections: 1. Statement of Work/Bid Schedule – Section 1

2. Instructions to Offerors – Section 2

3. Solicitation Provisions/Representations and Certifications – Section 3

4. Clauses/Terms and Conditions – Section 4

5. Quote Evaluation Criteria – Section 5

2 V15 NOV 2026

SECTION 1

STATEMENT OF WORK/BID SCHEDULE

This a Brand Name or Equal To requirement.

ENTER SOW/BID SCHEDULE:

STATEMENT OF WORK

Pilatus PC-12 Annual Maintenance

Support Aircraft Management & Operations (SAMO)

November 10, 2026

National Aeronautics and Space Administration Armstrong Flight Research Center Edwards, California

November 5, 2026

Table of Contents

1.0 Background

2.0 Objectives

3.0 Scope

4.0 Requirements

5.0 Deliverables

6.0 Government-Furnished Property (GFP)

7.0 Security Considerations

8.0 Travel

9.0 Special Material Requirements

10.0 Other Unique Requirements and Considerations

11.0 Place of performance

12.0 Period of performance

1.0 Background

The National Aeronautics & Space Administration (NASA) operates a Pilatus PC-12 aircraft (N606NA) for flight research purposes at the Armstrong Flight Research Center (AFRC). N606NA is modified for flight research and technology development purposes. NASA AFRC is not yet capable of performing depot level maintenance for this aircraft type and must hire an FAA certified repair station.

2.0 Objectives

The objective of this Statement of Work (SOW) is to detail the required tasks to be completed for the necessary annual maintenance. The Contractor shall complete all work within the specified period of performance and provide proper documentation to certify the aircraft’s airworthiness, provide teardown reports at each stage, and provide full documentation of completed inspections. The end product is the return of the aircraft asset to NASA AFRC in serviceable condition for continued flight research activity in the time specified.

3.0 Scope

The Contractor shall complete all of the required tasks listed in Section 4.1. Adhering to the period of performance is critical for aircraft readiness to continue with scheduled flight research objectives.

4.0 Requirements

4.1 The contractor shall fulfill the following requirements for Pilatus PC-12 aircraft serial number 1081 (FAA registration number N606NA).

4.1.1 The Contractor shall be an FAA certified repair station operating under 14 CFR Part 145.

The repair station must possess ratings and capabilities appropriate for Pilatus PC-12 aircraft and Pratt & Whitney PT6 engines. All planned maintenance shall be performed at the certified maintenance & repair station. Due to the highly technical and certification requirements of this maintenance, all scheduled maintenance tasks must be performed at the same site, unless a waiver is approved by NASA for an alternate location.

4.1.2 The FAA certified maintenance & repair station shall be located within the contiguous United States.

4.1.3 The Contractor shall allow NASA designated personnel including engineers, inspectors, aircraft maintenance, and other technical experts to observe the work at any time. NASA designated personnel may include employees of NASA and employees of NASA AFRC support contracts. The Contractor shall allow NASA civil servant and/or contractor technicians to carry their own tools on site and perform any tasks not listed in this SOW or maintenance that they deem necessary during the duration of the scheduled inspections being completed by the Contractor. NASA personnel will coordinate with the Contractor and request permission prior to accessing and starting work on the aircraft.

4.1.4 An expected duration of maintenance inspections tasks must be estimated ahead of time, and an estimated schedule shall be provided as part of the Contractor’s quote.

4.1.5 The Contractor shall complete the following maintenance tasks for PC-12 aircraft serial number 1081 (N606NA):

a. Annual Inspection Package (300FH, 600FH, 300FH/12Month, 600FH/12Month, 1200FH/12Month) Inspections Tasks in accordance with Pilatus PC-12 Aircraft Maintenance Manual 12-B-AM-00-00-00-I Chapter 5.

b. AD 2021-24-01 Fuselage Strakes Attachement Bracket & Structure Integrity

c. Annual Engine Inspection (engine serial number PCE-RY0107)

d. L-3 Avionics Service Letter SL-170 (Revision K) Emergency Power Supply PS-

855B (part number 501-172-02) Periodic Check

e. 2400 FH/24 Month Package Inspection

f. Pilatus Task 27-50/495 Left Inboard Flap Actuators (Black Anodized) Backlash Check (part number 978.73.20.309)

g. Pilatus Task 27-50/495 Left Outboard Flap Actuators (Black Anodized) Backlash Check (part number 978.73.20.309)

h. Pilatus Task 27-50/495 Right Inboard Flap Actuators (Black Anodized) Backlash Check (part number 978.73.20.309)

i. Pilatus Task 27-50/495 Right Outboard Flap Actuators (Black Anodized) Backlash Check (part number 978.73.20.309)

j. Pilatus Task 71-00/432 Chip Detector Inspection (300 EH/12/Mo.)

k. Pilatus Task 71-00/432 Engine Accessories (minor inspection items)

l. Pilatus Task 25-60/483 Kannad 406 AF ELT – Perform Self-Test

m. Propeller 200 FH/12 Month Inspection of De-Ice System

n. Chip Detector Inspection (600 EH/12 Mo.) P&WC EMM Table 601

o. Pilatus Task 26-20/24 Fire Extinguisher Content Check (except Model

P3APP003010D)

p. Pilatus Task 24-50/70 Emergency Power Supply Capacitance Check PS-855B (part number 501-172-02)

q. Pilatus Task 00-00/45 Internal Aircraft Corrosion & Corrosion Prevention

Inspections

r. Pilatus Task 21-20/317 ECS Emergency Shut-Off System

s. Pilatus Task 21-30/318 MSN 1001-1719 Pressurization Dump Switch Operational

Test

t. Pilatus Task 21-50/433 Vapor Cycle Compressor Condenser Module Inspection

u. Pilatus Task 24-30/311 Generator Control Units GCU 1 & GCU 2 Functional Test of the Over & Under Voltage Trip Protection (CMR)

v. Pilatus Task 27-40/1 Horizontal Stabilizer Trim Functional Test of Trim Runaway

Aural Warning System (FAA CMR)

w. Pilatus Task 27-50/437 Flap Drive Arms In-Situ Inspection/Check (1 Yr/600 Hr)

x. Pilatus Task 32-10/315 Main Landing Gear Hinge Pin & Bushings

y. Pilatus Task 32-10/80 Main & Nose Wheel Bearings Lubrication/Tire Replacement

(1 year)

z. Pilatus Task 53-30/342 Static Ports Critical Area (RVSM Aircraft) Inspection/Check

aa. Pilatus Task 76-10/117 Propeller Feathering Microswitches Functional Test

bb. Pilatus Task 30-10/79 Age Master No. 1 Application to the Airfoil De-Ice Boots

4.1.6 The Contractor shall identify and provide a list of all Required Inspection Items (RIIs) to NASA for use in determining when government quality assurance inspections will be necessary.

5.0 Deliverables

The contractor shall provide these deliverable items:

5.1 Regular updates including detailed progress reports, inspection results, findings for resolution, and needs from NASA AFRC. This shall be provided at least every 2 weeks with percentage of tasks completed to date and estimated days to complete remaining items.

5.2 PC-12 NASA 606 aircraft serial number 1081 in an airworthy state with all relevant inspections and maintenance tasks completed. The modified aircraft research instrumentation system must also be unharmed upon delivery.

5.3 A certificate of conformance, FAA 8130-3 Authorized Release Certificates, and certification documentation stating what maintenance and inspections have been performed on the aircraft.

5.4 All records associated with completion of scheduled maintenance tasks.

5.5 Material certification records for any fasteners.

5.6 A report summarizing any discrepancies or findings and what was done to correct them.

5.7 Documentation needed to update the NASA Aircraft Management Information System (NAMIS) database.

6.0 Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or

GFI)

GFP, GFM, GFE, and GFI shall be handled in accordance with the FAR Part 45 and NFS 1845 clauses included in this contract. NASA AFRC will provide the Pilatus PC-12 NASA 606 aircraft serial number 1081 and any relevant documentation depicting the modified portions of the aircraft that may be useful for completion of scheduled maintenance tasks or equipment integration. For any maintenance or modifications performed by AFRC personnel, AFRC will provide necessary equipment.

7.0 Security

There are no unique security requirements associated with this contract activity.

8.0 Travel

Contractor travel is not necessary for execution of this contract. Select NASA AFRC personnel may travel to the contractor facility for oversight of task work or conduct of approved maintenance tasks to the aircraft.

9.0 Special Material Requirements

If items are required to fix discrepancies, the Contractor is required to use certificated material and provide all chemical/physical and other certification for the items used on our aircraft at the completion of the project.

10.0 Other Unique Requirements

10.1 Quality Assurance:

10.1.1 NASA AFRC Quality Assurance (QA) personnel will occasionally need to be present at the contractor facility for Government Mandatory Inspection Points (GMIPs) and Mandatory Inspection Points (MIPs).

10.1.2 After identification of necessary inspection point criteria, the contractor will provide notification of when the aircraft is expected to be ready. This notification shall be made with adequate time for AFRC personnel to travel to the worksite without delaying maintenance progress.

10.1.3 The Contractor shall comply with all applicable sections of Q-1A and Q-3 (see attachments Q-1A.pdf and Q-3.pdf) and shall utilize tool control program that meets or exceeds (AFOP-7900.3-002 Chapter 7.18 thru 7.18.3 Tool & Equipment Control).

NASA will provide documentation with the approved officials that will be onsite.

10.1.4 Non‐conformance: The Contractor shall have in place a procedure for reporting of nonconforming articles, materials, and equipment. ("Non‐conformance" is defined as a condition of any article, material, or service in which one or more characteristics do not conform to the specified requirements. This includes failures, discrepancies, deficiencies, defects, anomalies, and malfunctions).

10.1.5 Inspection: The Contractor shall provide aircraft inspectors to verify that work is performed in accordance with technical specifications and that the workmanship is airworthy. The inspectors shall ensure that all inspection/repair documentation is completed and delivered to the government.

10.2 NASA AFRC aircraft maintenance and avionics personnel may perform work on the aircraft while it is at the contractor facility including verification of installed components, abatement of polyvinylchloride (PVC) wiring associated with onboard experiment hardware, and other tasks not to interfere with scheduled maintenance activity.

10.3 All over and above (O&A) findings will be reported to NASA AFRC. Prior to the contractor initiating a resolution to an O&A finding, NASA AFRC will review each finding to determine if a solution is necessary. The contractor is not permitted to enact a solution to an over and above finding without written permission from NASA AFRC. If any O&A findings require additional cost, prior written approval must be provided by the NASA Contracting Officer.

10.4 Contract will be awarded based on contractor’s ability to meet the time constraint listed in Section 12 of this document, “Period of Performance”. Aircraft must be able to be delivered and returned as detailed in the Period of Performance below in order to meet mission requirements.

11.0 Place of Performance

The place of performance will be at the contractor facility location.

12.0 Period of Performance

NASA AFRC will deliver the aircraft between December 9th and December 11th, 2026. The period of performance shall be 6 weeks from delivery of the aircraft for completion of servicing at the contractor facility.

REVISIONS

Revision Number Date Brief Summary of Changes

Base 5 Nov 2026 Initial draft

3 V15 NOV 2026

**All responding vendors must state, either in their quote or via email, that they are capable of complying with the attached quality documents. Failure to provide a statement of compliance will result in your quote being deemed non-responsive and not considered for award.

**All responding vendors must be an FAA and Pilatus certified repair station for PC-12 aircraft and must provide certification documents. Failure to provide certification documents will result in your quote being deemed non-responsive and not considered for award.

* Higher-Level Quality Requirements: AS9100 & ISO 9001

* Q-1A, Q-1C, and Q-3 Compliance is Required

* Certificate of Conformance is Required

4 V15 NOV 2026

SECTION 2

INSTRUCTION TO OFFERORS

☒52.212-1 Instructions to Offerors – Commercial Products and Commerical Services. (APR

2026)(DEVIATION)

Addendum to 52.212-1

Quotes for the item(s) described in the RFQ are due by 11/30/2026 by 4:00 p.m. CT to Tracy Bremer at tracy.g.bremer@nasa.gov in order to be considered for award. If it is in the best interest of the Government, quotes submitted after the due date may be accepted. Quotes shall remain valid for 30 days unless otherwise expressly stated on the quote. Submitted Quotes shall list two points of contacts including name, phone number, and email address.

The NAICS Code for this procurement is 336411.

This procurement is full and open competition.

Offeror’s shall be registered at www.sam.gov in order to be considered for award.

Please provide the Cage Code/UEI (Unique Entity ID) # on your Quote

Please provide your ARO Delivery Time on your Quote

Delivery is FOB Destination (Please provide FOB Destination on your Quote)

Payment Terms are NET 30

5 V15 NOV 2026

SECTION 3

SOLICITATION PROVISION/REPRESENTATIONS AND CERTIFICATIONS

☒52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

FAR FAR | Acquisition.GOV NFS NASA FAR Supplement

FEDERAL ACQUISITION REGULATION (FAR) PROVISIONS INCORPORATED BY

REFERENCE:

☒52.204-7 System for Award Management (APR 2026)(DEVIATION) ☒52.209-2 Prohibition on Contracting with Inverted Domestic Corporations – Representation (APR

2026)(DEVIATION)

FAR PROVISIONS IN FULL TEXT:

☒52.225-18 PLACE OF MANUFACTURE (AUG 2018)

(a) Definitions. As used in this clause— “Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except—

(1) FPSC 5510, Lumber and Related Basic Wood Materials;

(2) Product or Service Group (PSG) 87, Agricultural Supplies;

(3) PSG 88, Live Animals;

(4) PSG 89, Subsistence;

(5) PSC 9410, Crude Grades of Plant Materials;

(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;

(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;

(8) PSC 9610, Ores;

(9) PSC 9620, Minerals, Natural and Synthetic; and

(10) PSC 9630, Additive Metal Materials.

“Place of manufacture” means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.

(b) For statistical purposes only, the offeror shall indicate whether the place of manufacture of the end products it expects to provide in response to this solicitation is predominantly—

6 V15 NOV 2026

(1)In the United States (Check this box if the total anticipated price of offered end products manufactured in the United States exceeds the total anticipated price of offered end products manufactured outside the United States); or

(2) Outside the United States.

(End of provision)

7 V15 NOV 2026

SECTION 4

CLAUSES/TERMS AND CONDITIONS

APPLICABLE COMMERCIAL ITEM CLAUSES

This order is for a commercial item subject to the terms and conditions of FAR 52.212-4, Terms and Conditions

– Commercial Products and Commerical Serivces (APR 2026)(DEVIATION), incorporated by reference attached to this order and any additional terms and conditions checked below or included as a Center specific requirements as addenda to 52.212-4.

☒52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998).

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): FAR and NFS Search (nasa.gov)

FAR CLAUSES INCOPORATED BY REFERENCE:

☒52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) ☒52.204-13 System for Award Management Maintenance (SEP 2025)(DEVIATION) ☒ 52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026)(DEVIATION) ☒52.223-23 Sustainable Products and Services (SEP 2026)(DEVIATION) ☒52.223-23 Buy Amerian-Supplies (JUL 2026)(DEVIATION) ☒52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) ☒52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ☒ 52.240-91 Security Prohibitions and Exclusions (JUL 2026)(DEVIATION) ☐52.245-1 Government Property (SEP 2021) ☐52.247-29 F.o.b. Origin (FEB 2006) ☒52.247-34 F.o.b. Destination (NOV 1991)

NASA FEDERAL ACQUISITION REGULATION (NFS) CLAUSES INCORPORATED BY

REFERENCE:

☒1852.203-71 Requirements to Inform Employees of Whistleblower rights (SEP

2025)(DEVIATION)

☒1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT

(APR 2018)

☒1852.237-73 Release of Sensitive Information (DEC 2025)(DEVIATION) ☐1852.245-76 List of government property furnished pursuant to FAR 52.245-2 (DEC

2025)(DEVIATION)

☐1852.242-72 Denied Access to NASA Facilities (DEC 2025)(DEVIATION)

8 V15 NOV 2026

NFS CLAUSES IN FULL TEXT:

☒ 52.246‐11 Higher‐Level Contract Quality Requirement. (Dec 2014)

(a) The Contractor shall comply with the higher‐level quality standard(s) listed below.

AS9100 & ISO 9001

(b) The Contractor shall include applicable requirements of the higher‐level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower‐tier subcontracts, in‐

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require‐

(i) Control of such things as design, work operations, in‐process control, testing, and inspection ; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

☒1852.215-84 OMBUDSMAN (NOV 2023)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and contractors during the preaward and postaward phases of this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman is not to diminish the authority of the contracting officer, the Source Evaluation Board, or the selection official.

Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of formal contract disputes. Therefore, before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution.

(b) If resolution cannot be made by the contracting officer, interested parties may contact the installation ombudsman, whose name, address, telephone number, facsimile number, and email address may be found at:

https://www.hq.nasa.gov/office/procurement/regs/ProcurementOmbuds-Comp-Advocate-Listing.pdf. Concerns, issues, disagreements, and recommendations which cannot be resolved at the installation may be referred to the Agency ombudsman identified at the above URL. Please do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer or as specified elsewhere in this document.

☒1852.216-78 FIRM FIXED PRICED (DEC 2025)(DEVIATION)

The total firm-fixed-price of this contract is TBD.

☒1852.225-70 EXPORT LICENSES (DEC 2025)(DEVIATION)

(a) The contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR Parts 120 through 130, and the Export Administration Regulations (EAR), 15 CFR Parts 730 through 799, in the performance of this contract. In the absence of available license exemptions/exceptions, the contractor shall be responsible for obtaining the appropriate

9 V15 NOV 2026

licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.

(b) The contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at Armstrong Flight Research Center, where the foreign person will have access to export-controlled technical data or software.

(c) The contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.

(d) The contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.

☒52.225-8 Duty-Free Entry (Oct 2010)

(a) Definition. "Customs territory of the United States" means the States, the District of Columbia, and Puerto Rico.

(b) Except as otherwise approved by the Contracting Officer, the Contractor shall not include in the contract price any amount for duties on supplies specifically identified in the Schedule to be accorded duty-free entry.

(c) Except as provided in paragraph (d) of this clause or elsewhere in this contract, the following procedures apply to supplies not identified in the Schedule to be accorded duty-free entry:

(1) The Contractor shall notify the Contracting Officer in writing of any purchase of foreign supplies (including, without limitation, raw materials, components, and intermediate assemblies) in excess of $20,000 that are to be imported into the customs territory of the United States for delivery to the Government under this contract, either as end products or for incorporation into end products. The Contractor shall furnish the notice to the Contracting Officer at least 20 calendar days before the importation. The notice shall identify the-

(i) Foreign supplies;

(ii) Estimated amount of duty; and

(iii) Country of origin.

(2) The Contracting Officer will determine whether any of these supplies should be accorded duty-free entry and will notify the Contractor within 10 calendar days after receipt of the Contractor’s notification.

(3) Except as otherwise approved by the Contracting Officer, the contract price shall be reduced by (or the allowable cost shall not include) the amount of duty that would be payable if the supplies were not entered duty-free.

(d) The Contractor is not required to provide the notification under paragraph (c) of this clause for purchases of foreign supplies if-

(1) The supplies are identical in nature to items purchased by the Contractor or any subcontractor in connection with its commercial business; and

10 V15 NOV 2026

(2) Segregation of these supplies to ensure use only on Government contracts containing duty-free entry provisions is not economical or feasible.

(e) The Contractor shall claim duty-free entry only for supplies to be delivered to the Government under this contract, either as end products or incorporated into end products, and shall pay duty on supplies, or any portion of them, other than scrap, salvage, or competitive sale authorized by the Contracting Officer, diverted to nongovernmental use.

(f) The Government will execute any required duty-free entry certificates for supplies to be accorded duty-free entry and will assist the Contractor in obtaining duty-free entry for these supplies.

(g) Shipping documents for supplies to be accorded duty-free entry shall consign the shipments to the contracting agency in care of the Contractor and shall include the-

(1) Delivery address of the Contractor (or contracting agency, if appropriate);

(2) Government prime contract number;

(3) Identification of carrier;

(4) Notation "UNITED STATES GOVERNMENT, National Aeronautics and Space Administration Duty-free entry to be claimed pursuant to All Item Numbers listed on the Duty-Free Certificate/ Harmonized Tariff Schedules of the United States. Upon arrival of shipment at port of entry, District Director of Customs, please release shipment under 19 CFR part 142 and notify [cognizant contract administration office] for execution of Customs Forms 7501 and 7501-A and any required duty-free entry certificates.";

(5) Gross weight in pounds (if freight is based on space tonnage, state cubic feet in addition to gross shipping weight); and

(6) Estimated value in United States dollars.

(h) The Contractor shall instruct the foreign supplier to-

(1) Consign the shipment as specified in paragraph (g) of this clause;

(2) Mark all packages with the words "UNITED STATES GOVERNMENT" and the title of the contracting agency; and

(3) Include with the shipment at least two copies of the bill of lading (or other shipping document) for use by the District Director of Customs at the port of entry.

(i) The Contractor shall provide written notice to the cognizant contract administration office immediately after notification by the Contracting Officer that duty-free entry will be accorded foreign supplies or, for duty-free supplies identified in the Schedule, upon award by the Contractor to the overseas supplier. The notice shall identify the-

(1) Foreign supplies;

(2) Country of origin;

11 V15 NOV 2026

(3) Contract number; and

(4) Scheduled delivery date(s).

(j) The Contractor shall include the substance of this clause in any subcontract if-

(1) Supplies identified in the Schedule to be accorded duty-free entry will be imported into the customs territory of the United States; or

(2) Other foreign supplies in excess of $20,000 may be imported into the customs territory of the United States.

NFS 1852.225-8(k): The following supplies will be given duty-free entry:

(End of addition)

12 V15 NOV 2026

SECTION 5

QUOTE EVALUATION CRITERIA

The Government will award a contract from this solicitation to the responsible Offeror whose offer conforming to the solicitation is the lowest price technically acceptable (LPTA) offer. Offer’s not deemed technically acceptable will be removed from further consideration of the contract award. An Offeror’s quote will be deemed technically unacceptable and removed from further consideration for contract award if the Offeror’s quote does not demonstrate that all of the requirements listed in this solicitation can be met in a satisfactory manner.

File details come from the government source that posted it. Updated .