SOW.pdf

PDF 314 KB Posted

Attached to
PC-12 Annual Maintenance
Solicitation number
80NSSC27949241Q
Issued by

About this file

This is a Statement of Work (SOW) for annual maintenance services on a Pilatus PC-12 aircraft operated by NASA's Armstrong Flight Research Center.

NASA requires an FAA-certified repair station operating under 14 CFR Part 145 with appropriate ratings for Pilatus PC-12 aircraft and Pratt & Whitney PT6 engines to perform comprehensive annual maintenance on aircraft N606NA (serial number 1081) at the contractor's facility within the contiguous United States. The scope includes multiple maintenance tasks including annual inspection packages (300FH, 600FH, 300FH/12-Month, 600FH/12-Month, 1200FH/12-Month), airworthiness directives (AD 2021-24-01), annual engine inspection, avionics service checks, 2400 FH/24-Month package inspection, flap actuator backlash checks, chip detector inspections, fire extinguisher checks, landing gear maintenance, propeller inspections, and various functional tests of aircraft systems. NASA personnel, including engineers and maintenance technicians, retain the right to observe work and perform additional tasks at any time during maintenance. The contractor must provide biweekly progress reports, maintain FAA certification documentation, and deliver the aircraft in airworthy condition with all relevant inspection records, teardown reports, FAA 8130-3 Authorized Release Certificates, and material certifications.

The period of performance is 6 weeks from aircraft delivery, with NASA delivering the aircraft between December 9-11, 2026. The contractor must comply with NASA quality assurance procedures including Government Mandatory Inspection Points (GMIPs), mandatory inspection points (MIPs), tool control requirements, and nonconformance reporting procedures. All over-and-above findings require written NASA approval before resolution, and any additional costs require prior written approval from the NASA Contracting Officer. Award will be based on the contractor's demonstrated ability to meet the strict time constraints and delivery schedule.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Pilatus PC-12 Annual Maintenance

Support Aircraft Management & Operations (SAMO)

November 10, 2026

National Aeronautics and Space Administration Armstrong Flight Research Center Edwards, California

November 5, 2026

Table of Contents

1.0 Background

2.0 Objectives

3.0 Scope

4.0 Requirements

5.0 Deliverables

6.0 Government-Furnished Property (GFP)

7.0 Security Considerations

8.0 Travel

9.0 Special Material Requirements

10.0 Other Unique Requirements and Considerations

11.0 Place of performance

12.0 Period of performance

1.0 Background

The National Aeronautics & Space Administration (NASA) operates a Pilatus PC-12 aircraft (N606NA) for flight research purposes at the Armstrong Flight Research Center (AFRC). N606NA is modified for flight research and technology development purposes. NASA AFRC is not yet capable of performing depot level maintenance for this aircraft type and must hire an FAA certified repair station.

2.0 Objectives

The objective of this Statement of Work (SOW) is to detail the required tasks to be completed for the necessary annual maintenance. The Contractor shall complete all work within the specified period of performance and provide proper documentation to certify the aircraft’s airworthiness, provide teardown reports at each stage, and provide full documentation of completed inspections. The end product is the return of the aircraft asset to NASA AFRC in serviceable condition for continued flight research activity in the time specified.

3.0 Scope

The Contractor shall complete all of the required tasks listed in Section 4.1. Adhering to the period of performance is critical for aircraft readiness to continue with scheduled flight research objectives.

4.0 Requirements

4.1 The contractor shall fulfill the following requirements for Pilatus PC-12 aircraft serial number 1081 (FAA registration number N606NA).

4.1.1 The Contractor shall be an FAA certified repair station operating under 14 CFR Part 145.

The repair station must possess ratings and capabilities appropriate for Pilatus PC-12 aircraft and Pratt & Whitney PT6 engines. All planned maintenance shall be performed at the certified maintenance & repair station. Due to the highly technical and certification requirements of this maintenance, all scheduled maintenance tasks must be performed at the same site, unless a waiver is approved by NASA for an alternate location.

4.1.2 The FAA certified maintenance & repair station shall be located within the contiguous United States.

4.1.3 The Contractor shall allow NASA designated personnel including engineers, inspectors, aircraft maintenance, and other technical experts to observe the work at any time. NASA designated personnel may include employees of NASA and employees of NASA AFRC support contracts. The Contractor shall allow NASA civil servant and/or contractor technicians to carry their own tools on site and perform any tasks not listed in this SOW or maintenance that they deem necessary during the duration of the scheduled inspections being completed by the Contractor. NASA personnel will coordinate with the Contractor and request permission prior to accessing and starting work on the aircraft.

4.1.4 An expected duration of maintenance inspections tasks must be estimated ahead of time, and an estimated schedule shall be provided as part of the Contractor’s quote.

4.1.5 The Contractor shall complete the following maintenance tasks for PC-12 aircraft serial number 1081 (N606NA):

a. Annual Inspection Package (300FH, 600FH, 300FH/12Month, 600FH/12Month, 1200FH/12Month) Inspections Tasks in accordance with Pilatus PC-12 Aircraft Maintenance Manual 12-B-AM-00-00-00-I Chapter 5.

b. AD 2021-24-01 Fuselage Strakes Attachement Bracket & Structure Integrity

c. Annual Engine Inspection (engine serial number PCE-RY0107)

d. L-3 Avionics Service Letter SL-170 (Revision K) Emergency Power Supply PS-

855B (part number 501-172-02) Periodic Check

e. 2400 FH/24 Month Package Inspection

f. Pilatus Task 27-50/495 Left Inboard Flap Actuators (Black Anodized) Backlash Check (part number 978.73.20.309)

g. Pilatus Task 27-50/495 Left Outboard Flap Actuators (Black Anodized) Backlash Check (part number 978.73.20.309)

h. Pilatus Task 27-50/495 Right Inboard Flap Actuators (Black Anodized) Backlash Check (part number 978.73.20.309)

i. Pilatus Task 27-50/495 Right Outboard Flap Actuators (Black Anodized) Backlash Check (part number 978.73.20.309)

j. Pilatus Task 71-00/432 Chip Detector Inspection (300 EH/12/Mo.)

k. Pilatus Task 71-00/432 Engine Accessories (minor inspection items)

l. Pilatus Task 25-60/483 Kannad 406 AF ELT – Perform Self-Test

m. Propeller 200 FH/12 Month Inspection of De-Ice System

n. Chip Detector Inspection (600 EH/12 Mo.) P&WC EMM Table 601

o. Pilatus Task 26-20/24 Fire Extinguisher Content Check (except Model

P3APP003010D)

p. Pilatus Task 24-50/70 Emergency Power Supply Capacitance Check PS-855B (part number 501-172-02)

q. Pilatus Task 00-00/45 Internal Aircraft Corrosion & Corrosion Prevention

Inspections

r. Pilatus Task 21-20/317 ECS Emergency Shut-Off System

s. Pilatus Task 21-30/318 MSN 1001-1719 Pressurization Dump Switch Operational

Test

t. Pilatus Task 21-50/433 Vapor Cycle Compressor Condenser Module Inspection

u. Pilatus Task 24-30/311 Generator Control Units GCU 1 & GCU 2 Functional Test of the Over & Under Voltage Trip Protection (CMR)

v. Pilatus Task 27-40/1 Horizontal Stabilizer Trim Functional Test of Trim Runaway

Aural Warning System (FAA CMR)

w. Pilatus Task 27-50/437 Flap Drive Arms In-Situ Inspection/Check (1 Yr/600 Hr)

x. Pilatus Task 32-10/315 Main Landing Gear Hinge Pin & Bushings

y. Pilatus Task 32-10/80 Main & Nose Wheel Bearings Lubrication/Tire Replacement

(1 year)

z. Pilatus Task 53-30/342 Static Ports Critical Area (RVSM Aircraft) Inspection/Check

aa. Pilatus Task 76-10/117 Propeller Feathering Microswitches Functional Test

bb. Pilatus Task 30-10/79 Age Master No. 1 Application to the Airfoil De-Ice Boots

4.1.6 The Contractor shall identify and provide a list of all Required Inspection Items (RIIs) to NASA for use in determining when government quality assurance inspections will be necessary.

5.0 Deliverables

The contractor shall provide these deliverable items:

5.1 Regular updates including detailed progress reports, inspection results, findings for resolution, and needs from NASA AFRC. This shall be provided at least every 2 weeks with percentage of tasks completed to date and estimated days to complete remaining items.

5.2 PC-12 NASA 606 aircraft serial number 1081 in an airworthy state with all relevant inspections and maintenance tasks completed. The modified aircraft research instrumentation system must also be unharmed upon delivery.

5.3 A certificate of conformance, FAA 8130-3 Authorized Release Certificates, and certification documentation stating what maintenance and inspections have been performed on the aircraft.

5.4 All records associated with completion of scheduled maintenance tasks.

5.5 Material certification records for any fasteners.

5.6 A report summarizing any discrepancies or findings and what was done to correct them.

5.7 Documentation needed to update the NASA Aircraft Management Information System (NAMIS) database.

6.0 Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or

GFI)

GFP, GFM, GFE, and GFI shall be handled in accordance with the FAR Part 45 and NFS 1845 clauses included in this contract. NASA AFRC will provide the Pilatus PC-12 NASA 606 aircraft serial number 1081 and any relevant documentation depicting the modified portions of the aircraft that may be useful for completion of scheduled maintenance tasks or equipment integration. For any maintenance or modifications performed by AFRC personnel, AFRC will provide necessary equipment.

7.0 Security

There are no unique security requirements associated with this contract activity.

8.0 Travel

Contractor travel is not necessary for execution of this contract. Select NASA AFRC personnel may travel to the contractor facility for oversight of task work or conduct of approved maintenance tasks to the aircraft.

9.0 Special Material Requirements

If items are required to fix discrepancies, the Contractor is required to use certificated material and provide all chemical/physical and other certification for the items used on our aircraft at the completion of the project.

10.0 Other Unique Requirements

10.1 Quality Assurance:

10.1.1 NASA AFRC Quality Assurance (QA) personnel will occasionally need to be present at the contractor facility for Government Mandatory Inspection Points (GMIPs) and Mandatory Inspection Points (MIPs).

10.1.2 After identification of necessary inspection point criteria, the contractor will provide notification of when the aircraft is expected to be ready. This notification shall be made with adequate time for AFRC personnel to travel to the worksite without delaying maintenance progress.

10.1.3 The Contractor shall comply with all applicable sections of Q-1A and Q-3 (see attachments Q-1A.pdf and Q-3.pdf) and shall utilize tool control program that meets or exceeds (AFOP-7900.3-002 Chapter 7.18 thru 7.18.3 Tool & Equipment Control).

NASA will provide documentation with the approved officials that will be onsite.

10.1.4 Non‐conformance: The Contractor shall have in place a procedure for reporting of nonconforming articles, materials, and equipment. ("Non‐conformance" is defined as a condition of any article, material, or service in which one or more characteristics do not conform to the specified requirements. This includes failures, discrepancies, deficiencies, defects, anomalies, and malfunctions).

10.1.5 Inspection: The Contractor shall provide aircraft inspectors to verify that work is performed in accordance with technical specifications and that the workmanship is airworthy. The inspectors shall ensure that all inspection/repair documentation is completed and delivered to the government.

10.2 NASA AFRC aircraft maintenance and avionics personnel may perform work on the aircraft while it is at the contractor facility including verification of installed components, abatement of polyvinylchloride (PVC) wiring associated with onboard experiment hardware, and other tasks not to interfere with scheduled maintenance activity.

10.3 All over and above (O&A) findings will be reported to NASA AFRC. Prior to the contractor initiating a resolution to an O&A finding, NASA AFRC will review each finding to determine if a solution is necessary. The contractor is not permitted to enact a solution to an over and above finding without written permission from NASA AFRC. If any O&A findings require additional cost, prior written approval must be provided by the NASA Contracting Officer.

10.4 Contract will be awarded based on contractor’s ability to meet the time constraint listed in Section 12 of this document, “Period of Performance”. Aircraft must be able to be delivered and returned as detailed in the Period of Performance below in order to meet mission requirements.

11.0 Place of Performance

The place of performance will be at the contractor facility location.

12.0 Period of Performance

NASA AFRC will deliver the aircraft between December 9th and December 11th, 2026. The period of performance shall be 6 weeks from delivery of the aircraft for completion of servicing at the contractor facility.

REVISIONS

Revision Number Date Brief Summary of Changes

Base 5 Nov 2026 Initial draft