SATPC0043234 Tab 04 4 SOW.pdf

PDF 103 KB Posted

Attached to
TRANSDUCERS NEEDED FOR ARTEMIS III SERVICING
Solicitation number
80NSSC27949165Q
Issued by

About this file

This is a Statement of Work for the procurement of pressure fuel transducers to support Artemis III servicing. The requirement specifies eight total units across two part numbers, both manufactured by Taber Industries of North Tonawanda, New York. Four units of part number 79K38668AD05 are required with a pressure range of 0–5 PSIA, absolute type, for hypergolic fuel service media. Four additional units of part number 79K38668AD04 are required with a pressure range of 0–2 PSIA, absolute type, also for hypergolic fuel service media. Both part types must be built and marked per all requirements on the 79K38668 KSC drawing. The parts shall be cleaned upon receipt to KSC-C-123 Level 300A specification, and the AD05 units require one-time calibration at Kennedy Space Center upon receipt.

Deliverables must be shipped to the Logistics Facility, Building K6-1547, Kennedy Space Center, Florida 32899-0001, attention Tanya McCrory. Quality requirements mandate that the manufacturer provide a Certificate of Compliance with each shipment, documenting part number, specification, manufacturing location name and address, lot/heat/batch/date/serial numbers as applicable, quantity, and the customer's order number. The place of performance is Kennedy Space Center, with the period of performance specified as deliverable-based. No specific delivery date is identified in this document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements Transducers needed to support Artemis III servicing.

2. Characteristics, Scope, and Specs

Quantity OEM Part # Product Description

4 79K38668AD05

TRANSDUCER, PRESSURE FUEL

PN: 79K38668AD05-FUEL

MFR: TABER INDUSTRIES, NORTH TONAWANDA,

NEW YORK

DESC: TRANSDUCER, PRESSURE FUEL

PRESSURE RANGE: 0 - 5 PSIA

TYPE - A ABSOLUTE

SERVICE MEDIA - D (HYPERGOLIC FUEL)

PART SHOULD BE BUILT AND MARKED PER ALL

REQUIREMENTS ON THE 79K38668 KSC DRAWING

TO BE CLEANED UPON RECEIPT TO KSC-C-123

LEVEL 300A AT KSC REQUIRES ONE-TIME

CALIBRATION AT KSC UPON RECEIPT.

SERVICE MEDIA - D (HYPERGOLIC FUEL)

4 79K38668AD04

TRANSDUCER, PRESSURE FUEL

PN: 79K38668AD04-FUEL

MFR: TABER INDUSTRIES, NORTH TONAWANDA,

NEW YORK

PRESSURE RANGE: 0 - 2 PSIA

TYPE - A ABSOLUTE

SERVICE MEDIA - D (HYPERGOLIC FUEL)

PART SHOULD BE BUILT AND MARKED PER ALL

REQUIREMENTS

ON THE 79K38668 KSC DRAWING

3. Place of Performance Kennedy Space Center

4. Period of Performance Deliverable

SHIPPING ADDRESS

Address: Logistics Facility, Bldg K6-1547 City: KENNEDY SPACE CENTER State/Province: FL Zip/Postal Code: 32899-0001 Country: USA

Attn: Tanya McCrory

QULAITY REQUIREMENTS

QC03 – Manufacturer’s Certificate of Compliance The Manufacturer shall provide a certification with each shipment to attest that the parts, assemblies, subassemblies, or detail parts conform to the Order requirements. When applicable, the true manufacturers, lot, heat, batch, date code, and/or serial number must appear on the certification. Certification must contain the following:

� Part number/Specification � Name and address of manufacturing or processing location � Manufacturer’s lot, heat, batch, date code, and/or serial number (if applicable) � Quantity � Customer’s Order number must be included on the documentation provided by the procurement source.

File details come from the government source that posted it. Updated .