SATPC0043234 Tab 04 4 SOW.pdf
PDF 103 KB Posted
- Attached to
- TRANSDUCERS NEEDED FOR ARTEMIS III SERVICING
- Solicitation number
- 80NSSC27949165Q
About this file
This is a Statement of Work for the procurement of pressure fuel transducers to support Artemis III servicing. The requirement specifies eight total units across two part numbers, both manufactured by Taber Industries of North Tonawanda, New York. Four units of part number 79K38668AD05 are required with a pressure range of 0–5 PSIA, absolute type, for hypergolic fuel service media. Four additional units of part number 79K38668AD04 are required with a pressure range of 0–2 PSIA, absolute type, also for hypergolic fuel service media. Both part types must be built and marked per all requirements on the 79K38668 KSC drawing. The parts shall be cleaned upon receipt to KSC-C-123 Level 300A specification, and the AD05 units require one-time calibration at Kennedy Space Center upon receipt.
Deliverables must be shipped to the Logistics Facility, Building K6-1547, Kennedy Space Center, Florida 32899-0001, attention Tanya McCrory. Quality requirements mandate that the manufacturer provide a Certificate of Compliance with each shipment, documenting part number, specification, manufacturing location name and address, lot/heat/batch/date/serial numbers as applicable, quantity, and the customer's order number. The place of performance is Kennedy Space Center, with the period of performance specified as deliverable-based. No specific delivery date is identified in this document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements Transducers needed to support Artemis III servicing.
2. Characteristics, Scope, and Specs
Quantity OEM Part # Product Description
4 79K38668AD05
TRANSDUCER, PRESSURE FUEL
PN: 79K38668AD05-FUEL
MFR: TABER INDUSTRIES, NORTH TONAWANDA,
NEW YORK
DESC: TRANSDUCER, PRESSURE FUEL
PRESSURE RANGE: 0 - 5 PSIA
TYPE - A ABSOLUTE
SERVICE MEDIA - D (HYPERGOLIC FUEL)
PART SHOULD BE BUILT AND MARKED PER ALL
REQUIREMENTS ON THE 79K38668 KSC DRAWING
TO BE CLEANED UPON RECEIPT TO KSC-C-123
LEVEL 300A AT KSC REQUIRES ONE-TIME
CALIBRATION AT KSC UPON RECEIPT.
SERVICE MEDIA - D (HYPERGOLIC FUEL)
4 79K38668AD04
TRANSDUCER, PRESSURE FUEL
PN: 79K38668AD04-FUEL
MFR: TABER INDUSTRIES, NORTH TONAWANDA,
NEW YORK
PRESSURE RANGE: 0 - 2 PSIA
TYPE - A ABSOLUTE
SERVICE MEDIA - D (HYPERGOLIC FUEL)
PART SHOULD BE BUILT AND MARKED PER ALL
REQUIREMENTS
ON THE 79K38668 KSC DRAWING
3. Place of Performance Kennedy Space Center
4. Period of Performance Deliverable
SHIPPING ADDRESS
Address: Logistics Facility, Bldg K6-1547 City: KENNEDY SPACE CENTER State/Province: FL Zip/Postal Code: 32899-0001 Country: USA
Attn: Tanya McCrory
QULAITY REQUIREMENTS
QC03 – Manufacturer’s Certificate of Compliance The Manufacturer shall provide a certification with each shipment to attest that the parts, assemblies, subassemblies, or detail parts conform to the Order requirements. When applicable, the true manufacturers, lot, heat, batch, date code, and/or serial number must appear on the certification. Certification must contain the following:
� Part number/Specification � Name and address of manufacturing or processing location � Manufacturer’s lot, heat, batch, date code, and/or serial number (if applicable) � Quantity � Customer’s Order number must be included on the documentation provided by the procurement source.
File details come from the government source that posted it. Updated .