This is a Statement of Work for the STRIVE Cryocooler procurement at NASA Goddard Space Flight Center (GSFC).
NASA Goddard Space Flight Center is acquiring one (1) CryoTel DS30-LT Thermo-Mechanical Unit (TMU) to serve as a dedicated Life Test Unit (LTU) for ground-based, long-duration operational reliability and life qualification testing in support of the ALICE instrument. The hardware shall be delivered in an orthogonal (cross) configuration with fluid loop heat rejection and shall include a CryoTel DS30 electronics controller and harnesses, balancers, a 4.5" Conflat vacuum flange, accelerometers, and temperature sensors. The contractor shall manufacture, test, and deliver the commercial cryocooler unit; document all nonconformances identified during fabrication and inspection; provide test results from intermediate performance verification and final acceptance tests; furnish a Certificate of Compliance; deliver a solid model of the external shell of cryocooler and balancer assemblies; and ship the completed components to NASA GSFC. All completed components must be stored in an enclosed container such as a sealed box or bag prior to shipment to prevent dust, debris, or other contamination. Performance will be conducted at the contractor's facility with a period of performance of 16 weeks from award, with an estimated completion date of March 31, 2027.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK STRIVE Cryocooler
1. Objective / Requirements The objective of this procurement is to acquire one (1) CryoTel DS30-LT Thermo-Mechanical Unit (TMU) for the STRIVE Project at NASA Goddard Space Flight Center (GSFC). This hardware will serve as a dedicated Life Test Unit (LTU) to execute ground-based, long-duration operational reliability and life qualification testing in support of the ALICE instrument.
Hardware Interfaces & Accessories:
CryoTel DS30LT in orthogonal (cross) configuration with fluid loop heat rejection CryoTel DS30 electronics controller and harnesses Balancers
Accelerometers and temperature sensors
The Contractor Shall:
Manufacture, test, and deliver commercial CryoTel DS30-LT.
Document all nonconformances identified during fabrication and inspection.
Provide test results from intermediate performance verification and final acceptance tests.
Provide a Certificate of Compliance.
Provide solid model of external shell of cryocooler and balancer assemblies.
Ship the completed components to NASA Goddard Space Flight Center (GSFC).
Handling and cleanliness requirements:
an enclosed container, such as a sealed box or bag, to prevent the accumulation of dust, debris, or other contamination.
2. Place of Performance Contractor facility.
3. Period of Performance Shall be performed from Award plus 16 weeks (estimating March 31, 2027).