About this file

This is a Statement of Work for NASA's LOX Recharger project, Purchase Request 4200948984, issued by the requesting organization RA72 to Cryostar Distribution North America.

NASA White Sands Test Facility requires three high-pressure liquid oxygen reciprocating pump skids and one automatic control panel to deliver 13 gpm at 6,700 psig with two pumps operating in tandem and one on standby. The contractor shall furnish three Cryostar A-MRP 40/55 OL1 T pump skids (or approved equivalent), each rated for 6.5 gpm at 6,700 psig in oxygen service with cold end, oil-lubricated crank drive, 60-hp 480-V 60-Hz three-phase inverter-duty-rated motor, IP55 enclosure rated for -4°F to +104°F, suction and return flexible lines, suction filter, relief valves, pulsation damper, non-return valve, PT100 probes and controllers, nitrogen purge system, discharge piping and manifold, and pneumatic actuated valves. The contractor must provide one triple automatic control panel with HMI, PLC, and VFD including start/stop controls, indicators, hour meters, motor starters, disconnect breaker, 110-V control power, emergency stop, temperature controllers, nitrogen-purge interlock, pressure switches, automatic start/stop, and lead/lag control. The contractor shall deliver complete native, editable PLC and HMI source code and all associated development files, passwords, access credentials, encryption keys, and license information without vendor-lock or restrictions preventing NASA access and modification. Additional requirements include hydrostatically tested pressure-containing components, internal pump running test with liquid nitrogen, documentation package, standard commercial packaging with individual pump skids, oxygen cleanliness coordination with NASA, and test records and certificates. Fabrication, assembly, and testing shall occur at approved contractor facilities with delivery to NASA Lyndon B. Johnson Space Center, Houston, Texas 77058-3696, though the project location is NASA White Sands Test Facility, Las Cruces, New Mexico 88012. The proposed delivery is 42 to 46 weeks after receipt of order and satisfaction of applicable payment conditions, with the purchase request listing December 3, 2026 as the target date. The contracting office and requiring organization shall establish the controlling delivery date and milestone schedule in the resulting order.

View the file

Other files

File Type Posted
SATPC0043201 Tab 10 RFQ Open Market Template.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work | NASA LOX Recharger | PR 4200948984

STATEMENT OF WORK

Liquid Oxygen Pumps and Automatic Control Panel

NASA LOX Recharger Project

Purchase Request 4200948984

Requesting Organization RA72

Project / Requirement NASA LOX Recharger / Three LOX Pumps and Controller

Suggested Source Cryostar Distribution North America

Proposal Reference CSDNA/9079, dated September 23, 2026

1. Objective / Requirement NASA White Sands Test Facility requires three (3) high-pressure liquid oxygen (LOX) reciprocating pump skids and one (1) automatic control panel to support the NASA LOX Recharger project. The system shall provide 13 gpm at 6,700 psig with two pumps operating in tandem and one pump on standby.

2. Characteristics, Scope, and Specifications The contractor shall furnish, test, document, package, and make available for shipment the following equipment and services:

• Pump quantity and configuration: Provide three (3) Cryostar A-MRP 40/55 OL1 T reciprocating LOX pump skids, or approved equivalent, each with cold end, oil-lubricated crank drive, electric motor, drive system, and painted steel base plate.

• Performance: Each pump shall be rated for 6.5 gpm at 6,700 psig in oxygen service. Two pumps shall operate in tandem to provide 13 gpm, with one pump on standby.

• Service conditions: Design for LOX service; assumed suction pressure 30 psig, maximum suction pressure 250 psig, relief setting 7,700 psig, required NPSH of 1 to 3.3 ft, and approximate rated speed of 400 rpm. NASA shall confirm the assumed suction pressure.

• Motor: Provide a 60-hp, 480-V, 60-Hz, three-phase, inverter-duty-rated motor for each pump, with IP55 enclosure and suitability for approximately -4°F to +104°F and humidity below 95 percent.

• Pump accessories and instrumentation: Include suction and return flexible lines; suction filter; low-and high-pressure relief valves; pulsation damper; non-return valve; PT100 probes and controllers for cooldown, cavitation, and seal-leak protection; nitrogen purge system; discharge piping and manifold;

and required pneumatic actuated valves.

• Automatic control panel: Provide one (1) triple automatic control panel with HMI, PLC, and VFD.

Include start/stop controls, indicators, hour meters, motor starters, disconnect breaker, 110-V control power, emergency stop, temperature controllers, nitrogen-purge interlock, pressure switches, automatic start/stop, and lead/lag control.

• PLC and HMI source code: Provide NASA all PLC and HMI source code and associated development files required to view, edit, compile, load, maintain, troubleshoot, restore, and modify the delivered control system. Include complete native, editable project files; PLC logic; HMI applications and screens;

tag databases; alarms and events; recipes; communications, device, and I/O configurations; safety or motion code, if applicable; reusable libraries and custom function blocks; comments and descriptions;

revision history; and a final as-built backup matching the applications installed in the delivered equipment. Provide all passwords, access credentials, encryption keys, license information, software and firmware version requirements, and instructions needed to open, maintain, back up, restore, and download the applications. Files shall not be compiled-only, vendor-locked, password-protected, or otherwise restricted from NASA access and modification, except where a restriction is expressly identified and approved in writing by NASA before award.

• Oxygen cleanliness: Coordinate the cleaning approach with NASA. The proposal states that cleaning to NASA 50A cannot be performed by the contractor and identifies an alternate process involving NASA cleaning before final assembly. NASA shall approve the final process, custody sequence, verification, and acceptance documentation.

• Testing and inspection: Hydrostatically test pressure-containing components and conduct an internal pump running test with liquid nitrogen before shipment. Provide test records and certificates.

• Documentation: Provide one paper instruction manual and one electronic copy per pump type, including drawings, performance data, operating and maintenance instructions, parts information, test reports, certificates, and control-panel documentation.

• Packaging and shipment: Provide standard commercial packaging. Pumps shall be individual skids.

Transportation is a Government/customer responsibility unless otherwise stated in the order.

3. Deliverables and Acceptance

Deliverable Acceptance Basis

3 complete LOX pump skids Configuration and accessories conform to approved submittals and the purchase order.

1 automatic control panel Ratings, controls, HMI/PLC/VFD functions, and interlocks are verified by inspection and test documentation.

PLC and HMI source-code package Complete native, editable, as-built PLC and HMI projects are delivered and demonstrated to open using the identified software version. Package includes configurations, databases, libraries, comments, backups, access information, license and version requirements, and restore/download instructions. Files match the final installed configuration.

Test and inspection records Hydrostatic and liquid-nitrogen running-test results are complete and acceptable to NASA.

Technical data package Required manuals, drawings, performance information, certificates, test reports, parts information, and control documentation are complete.

Oxygen-cleanliness documentation Approved cleaning plan and objective cleanliness/verification records are provided for oxygen-service items.

4. Place of Performance Fabrication, assembly, and contractor testing shall occur at approved contractor facilities. The purchase request identifies delivery to NASA Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Texas 77058-3696. The proposal identifies NASA White Sands Test Facility, 12600 NASA Road, Las Cruces, New Mexico 88012, as the project location. NASA shall confirm the final ship-to location, installation site, and any intermediate shipment for oxygen cleaning before award.

5. Period of Performance The proposed delivery is 42 to 46 weeks after receipt of order and satisfaction of applicable payment conditions. The purchase request lists December 3, 2026. The contracting office and requiring organization shall establish the controlling delivery date and milestone schedule in the resulting order.

6. Government and Contractor Responsibilities

• NASA shall confirm the technical baseline, suction pressure, cleaning method, ship-to location, interfaces, and submittal schedule.

• The contractor shall identify deviations or exceptions before award or before proceeding with affected work.

• Before final acceptance, the contractor shall demonstrate that NASA can open the delivered PLC and HMI projects and that the source-code revision corresponds to the as-built applications loaded on the equipment.

• The contractor shall notify NASA of conditions affecting performance, safety, cost, or schedule and shall not make material substitutions without written authorization.

• NASA/customer shall arrange transportation from the agreed Ex Works location unless otherwise stated.

7. Reference Information

• Purchase Request 4200948984, dated November 4, 2026.

• Cryostar Distribution North America Proposal CSDNA/9079, dated September 23, 2026.

• Cryostar provisional dimensional drawing 702 155 136-01 and performance diagram 700 130 745-01, when submitted and approved.

1. Objective / Requirement
2. Characteristics, Scope, and Specifications
3. Deliverables and Acceptance
4. Place of Performance
5. Period of Performance
6. Government and Contractor Responsibilities
7. Reference Information

File details come from the government source that posted it. Updated .