Tab 04 SOW.pdf

PDF 95 KB Posted

Attached to
Pressure control valve assemblies
Solicitation number
80NSSC27948096Q
Issued by

About this file

This is a Statement of Work for a federal contract requirement supporting critical spares procurement for NASA's Artemis 3 mission and beyond, including spares for increased launch cadence.

The requirement specifies procurement of four (4) Valve Assembly, Pressure Control units (ATOS LIRZO-RES-P-BP-3/315/IZ with modification by SUN HYDRAULICS FP6/10 with DTBF-XCN-228LD, OEM Part # 2022LAS-09782-91). Each shipment must include a Manufacturer's Certificate of Compliance (QC03) attesting conformance to order requirements. The certificate must contain the part number/specification, quantity, name and address of the manufacturing location, manufacturer's lot/heat/batch/date code and/or serial number (if applicable), and the customer's order number. If procured through an authorized distributor, the certificate must include the distributor's name and evidence from the OEM confirming authorized distributor status. The place of performance is the Mobile Launcher (ML1) at Kennedy Space Center (KSC), with a required delivery date of March 19, 2027.

View the file

Other files

File Type Posted
Tab 07 Capability Statement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

ITEM REQUIRED TO SUPPORT CAA CRITICAL SPARES POSTURE FOR

ARTEMIS 3 & BEYOND AS WELL AS SPARING FOR INCREASED LAUNCH

CADANCE

2. Characteristics, Scope, and Specs

Quantity OEM Part # Product Description

4 2022LAS-09782-91

VALVE ASSEMBLY, PRESSURE CONTROL

(ATOS) LIRZO-RES-P-BP-3/315/IZ WITH

MODIFICATION (SUN HYDRAULICS) FP6/10 WITH

DTBF-XCN-228LD

REQUIRES MANUFACTURER C OF C

QC03-- Manufacturer’s Certificate of Compliance The Manufacturer shall provide a certification with each shipment to attest that the parts, assemblies, subassemblies, or detail parts conform to the Order requirements. When applicable, the true manufacturers, lot, heat, batch, date code, and/or serial number must appear on the certification.

Certification must contain the following:

• Part number / Specification

• Quantity

• Name and address of manufacturing or processing location

• Manufacturer’s lot, heat, batch, date code, and/or serial number (if applicable)

• Customer’s Order number when ordering directly from the manufacturer.

� If Authorized Distributor, include Authorized Distributor Name and Evidence from the OEM that seller is an Authorized Distributor – attached to Certificate.

3. Place of Performance

Mobile Launcher (ML1) at KSC

4. Period of Performance Need date of 3/19/2027