This is a Questions and Answers (Q&A) document for a Request for Quotation (RFQ) for document shredding services at Stennis Space Center.
The procurement requires on-site witnessed mobile shredding services across 21 buildings at Stennis Space Center with service frequency every two weeks. The contractor must provide and maintain approximately 60 locked containers in various sizes (96-gallon, 65-gallon, and executive consoles measuring approximately 36" L x 20" W x 20" H). The scope includes paper documents, CDs, and DVDs, but excludes hard drives. The contract base period runs from October 1, 2026 through September 30, 2027, with two option years requested. The contractor must supply a certificate of destruction after each service event; however, no specific destruction standard (such as NAID AAA or NSA/CSS certification) is mandated as long as certification documentation is provided to the customer. Contractor personnel and vehicles must obtain Stennis Access and G Access for Test Stand servicing to enter the facility. No specific brand name or model is required for the shredding equipment or containers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0042581 Tab 10 Open Market RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ Questions
1. Scope and locations: How many buildings/sites at Stennis Space Center require shredding service, and what are the specific pickup locations? 21 buildings
2. Volume: What is the estimated volume of material per service (e.g., number of bins, consoles, or pounds per pickup)? ~60 receptacles
3. Frequency: Is this a one-time purge or a recurring service? If recurring, what is the required schedule (weekly, biweekly, monthly)? Every two weeks.
4. Service method: Is on-site (witnessed) mobile shredding required, or is off-site pickup and destruction acceptable? On-site required.
5. Contract term: What is the base period of performance, and are there option periods? Oct 1, 2026 - September 30 2027. Yes, requesting 2 options years.
6. Security/certification standard: Is a specific destruction standard required (e.g., NAID AAA certification, NSA/CSS-listed equipment), and is there a required particle size? Any certification as long as a certificate of destruction is provided to Customer
7. Certificate of Destruction: Is a certificate required after each service event? Any certification as long as a certificate of destruction is provided to Customer
8. Material types: Is the scope limited to paper documents, or does it include other media (e.g., hard drives, electronic storage)? No Hard drives. Yes to CD, DVDs
9. Containers: Is the contractor required to supply and maintain locked bins/consoles on-site, and if so, how many? Yes, Contractor is responsible to provide locked consoles/bins. Approximately 60, various sizes per contractor experience.
10. Brand Name or Equal: Section 2 references a “Brand Name or Equal To” requirement. Could you identify the referenced brand, model, or standard so we can confirm an equal alternative meets the requirement? No brand name required. Sizes range from 96 gallon, 65 gallon, and executive consoles estimated (L x 20” W x 20” H x 36”)
11. Site access: Are there base access, escort, or background-check requirements for
RFQ Questions contractor personnel/vehicles entering Stennis Space Center? Yes, Stennis Access and G Access for Test Stand servicing.
12. Performance expectations: Is there a required turnaround time or service window per pickup? Every two weeks.