SATPC0041904 Tab 04 4 sow.pdf
PDF 147 KB Posted
- Solicitation number
- 80NSSC26939027Q
About this file
Statement of Work Summary
This Statement of Work outlines the requirement for supply and installation of a Brightlink COB LED Video Wall System at the Marshall Space Flight Center (MSFC) in Huntsville, Alabama. The specific system required is the Brightlink Pro Spectrum 245" with a 32:9 aspect ratio, featuring a 0.9mm pixel pitch and approximately 11,520,000 pixels (1.5 x 4k resolution). The system includes ultra-slim 1" HRD cabinets for low-profile installation, 4 x 1080P inputs, 2 x 4K inputs, premium aluminum mounting system, black acrylic trim kit, 10% spare parts package, and a comprehensive 5-year manufacturer warranty.
The contractor shall be responsible for complete supply and installation services including mounting system setup, LED cabinet and module installation, controller integration, LED module color and video calibration, system configuration, commissioning services, and on-site operational training to ensure optimal performance, image uniformity, and proper system operation. The work is to be performed at MSFC in Huntsville, AL, with payment terms set at Net 30.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Objective/Requirements A LED Video Wall System is needed for Concurrent Design Facility.
Characteristics, Scope, and Specs The LED Video Wall System would need the following specifications:
Supply and installation of the Brightlink COB LED Video Wall system, including mounting system setup, installation of LED cabinets and modules, controller integra on, LED module color and video calibration, system configuration, commissioning services, and on-site operational training to ensure
Place of Performance MSFC in Huntsville, AL
Pricing and Payment Terms Net 30
File details come from the government source that posted it. Updated .