SOW.pdf
PDF 273 KB Posted
- Attached to
- FY26 Silicon Expert 12 Month Renewal
- Solicitation number
- 80NSSC26937383Q
About this file
This is a Statement of Work (SOW) for a 12-month Silicon Expert software renewal at NASA's Marshall Space Flight Center (MSFC). The contract period runs from August 16, 2026, through August 17, 2027, with performance taking place at MSFC in Washington, District of Columbia.
The requirement includes six line items focused on P5 platform software and professional services. Line 1 specifies the P5 BOM Manager Loyalty Package (quantity 1), which includes one floating seat, 5,000 manufacturer parts, unlimited Part Search, and BOM Risk capabilities. Line 2 covers four additional floating seats for the P5 platform. Lines 3 and 4 provide add-on modules: the Approved Component Library (ACL) and Approved Manufacturers' Library (AML) for the P5 platform, each with a quantity of 1. Line 5 includes 20,000 additional parts to expand the BOM Manager limit. Line 6 specifies one Professional Services engagement for a Geo Risk Report covering five manufacturers and up to 500 manufacturer parts.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
The information listed below is required to complete FY26 Silicon Expert 12 Month Renewal at Marshall Space Flight Center (MSFC).
2. Characteristics, Scope, and Specs
LINE PRODUCT DESCRIPTION QTY.
1 P5 | BOM Manager -
Loyalty Package P5 BOM Manager & Professional Services - Includes 1 floating seat, 5k mfr parts, unlimited Part Search and BOM Risk
2 P5 | BOM Manager Floating Seat
Additional Floating Seat for P5 platform 4
3 P5 | ACL Add on Approved Component Library Module for P5 platform 1 4 P5 | AML Add on Approved Manufacturers' Library Module for P5 platform 1 5 P5 | Additional Parts Additional parts added to BOM Mgr limit 20,000 6 Professional Services |
GeoRisk Geo Risk Report for 5 manufacturers, up to 500 mfr. parts. 1
3. Place of Performance
NASA/Marshall Space Flight Center 300 E Street Southwest Washington, District of Columbia 20546 United States
4. Period of Performance
8/16/2026 – 8/17/2027
File details come from the government source that posted it. Updated .