SATPC0041258 TAB 10 2 SOW REDACTED.pdf

PDF 106 KB Posted

Attached to
Current probes for Core Stage Circ Pump BMC Testing
Solicitation number
80NSSC26934359Q
Issued by

About this file

This is a Statement of Work for testing equipment related to the Space Launch System Core Stage Circulation Pump Boeing Motor Controller (BMC). The work requires integration testing to verify compatibility with Ground Support Equipment and existing harnessing for two current probes and their associated amplifiers. Marshall Space Flight Center engineers will perform the testing and have identified a need for specific equipment: one Tektronix TCP303 (qty 2) 150 Amp current probe and one TCPA300 (qty 2) current probe amplifier. The required delivery date for these items is July 8, 2026, to support planned test activities at the facility.

View the file

Other files

File Type Posted
SATPC0041258 TAB 10 SAM RFQ.pdf PDF
SATPC0041258 TAB 10 SOW REDACTED.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .