SATPC0041097 Tab 04 4 SOW-REV.docx
DOCX document 21 KB Posted
- Attached to
- Iridium Wire for SuperHERO Coatings Federal contract opportunity
- Solicitation number
- 80NSSC26932753Q
About this file
This is a Statement of Work (SOW) for the procurement of Iridium wire required for SuperHERO mandrel coatings. The contractor must supply one length of iridium wire meeting the following specifications: minimum 99.9% purity, 0.08 inches (2mm) in diameter, 33 inches (840mm) in length, with surface quality less than 1 micron Ra, and free from marks, pits, and scratches. The work will be performed at the contractor's facility with a period of performance of 60 days from the award date of May 20, 2026.
The related solicitation (80NSSC26932753Q) is a brand name requirement issued by NASA's Marshall Space Flight Center and represents a Request for Quote (RFQ) for this iridium wire procurement. Bidders must submit quotes in PDF format and include their CAGE/UEI code, FOB destination terms, leadtime for delivery, and a point of contact with email address. The RFQ notice ID number must be referenced in the subject line of bid submissions. The SOW has been revised and the RFQ deadline has been extended to allow additional time for vendor responses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0041097 Tab 10 4 RFQ Questions.pdf | ||
| SATPC0041097 Tab 10 1 RFQ Open Market-Revised.pdf | ||
| SATPC0041097 Tab 04 4 SOW.pdf | ||
| SATPC0041097 Tab 10 1 RFQ Open Market.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
for Iridium Wire Purchase 5/20/2026
1. Objective: SuperHERO mandrels require coatings of Iridium. This purchase is to obtain the Iridium wire to meet that requirement.
2. Characteristics: The SuperHERO project needs Iridium Wire that meets the following specifications:
· Iridium wire, at least 99.9% purity
· 0.08” (2mm) diameter x 33” (840mm) long
· Surface quality < 1 microns Ra
· Avoiding marks, pits and scratches on the surface
· Quantity: 1
3. Place of Performance: This work will be done at the contractor’s facility.
4. Period of Performance: The period of performance is 60 days from the day of the award.