SATPC0039383 Tab 04 4 SOW.pdf
PDF 335 KB Posted
- Attached to
- Nanosecond pulser Federal contract opportunity
- Solicitation number
- 80NSSC25910847Q
About this file
This Statement of Work (SOW) details NASA's requirement for a specialized high-voltage nanosecond pulser for the Applied Chemistry Lab at Kennedy Space Center. The power supply must meet specific technical specifications, including supplying up to 20 kV of adjustable voltage, pulse width adjustment down to 100 ns, pulse frequency adjustment from ≤1 kHz to at least 10 kHz, and provide floating voltage with positive and negative output leads. The device must be contained in a single unit less than 8 cubic feet. Performance is scheduled to begin in September 2025 and continue through 2030, with testing to be conducted in room 2214 of the Operations and Checkout building at Kennedy Space Center.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements The Applied Chemistry Lab has a requirement for a floating, high voltage, nanosecond pulser with adjustable voltage, frequency, and pulse width.
2. Characteristics, Scope, and Specs
The power supply shall perform the following duties:
Supply up to 20 kV of adjustable voltage Provide adjustment of pulse width down to at least 100 ns level Provide adjustment of pulse frequency from less than or equal to 1 kHz to at least 10 kHz Provide floating voltage with positive and negative output leads Be contained in one unit, less than 8 cubic feet
3. Place of Performance Applied Chemistry Labs in room 2214 of the Operations and Checkout building at Kennedy Space Center
4. Period of Performance Testing shall be performed starting September 2025 and continue on until 2030.
File details come from the government source that posted it. Updated .