About this file

This Statement of Work (SOW) details NASA Armstrong Flight Research Center's contract with Elodin Systems, Inc. for developing additional capabilities for the Aleph Flight Computer for unmanned vehicles. The specific requirements include PX4 Aleph Flight Integration, Doodle Labs Radio Integration, RTK GPS Integration, NASA GNC PX4 Aleph Deployment, and onsite development and support, which involves flight testing the Albatross UAV. The contract includes estimated travel expenses for two round-trip airfares, a five-day rental car, and five nights of lodging, with all development to be completed by June 15, 2025, and the system to be delivered and integrated by June 30, 2025.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Government’s Minimum Need

Summary:

This statement of work outlines the scope of services provided by Elodin Systems, Inc. to NASA Armstrong Flight Research Center (NASA AFRC) for additional capability development of the Aleph Flight Computer for unmanned vehicles.

NASA AFRC has purchased an Elodin Aleph flight computer for test and evaluation. Elodin will integrate RTK GPS units, an L-band mesh radio and systems development support to integrate onto Albatross unmanned vehicle owned by NASA AFRC model shop. A detailed listing of the tasks, quantity and cost are given in the Requirements section.

Requirement(s):

The discrete tasks for this contract are listed below

PX4 Aleph Flight Integration (all standard PX4 features running on Aleph) PX4 Aleph Doodle Labs Integration (bi‑directional QGC communication over Doodle Labs radios) PX4 Aleph RTK GPS Integration (high‑accuracy position telemetry via RTK) NASA GNC PX4 Aleph Deployment (seamless GNC workflow deployment onto Aleph‑enabled aircraft) Onsite Development & Support (flight test of the Albatross UAV running Aleph over Doodle Labs‑enabled QGC).

Estimated travel expenses include two round‑trip airfares, a five‑day rental car, and five nights of lodging.

Period of Performance/Lead Time/ Need by Date:

All development will be completed by June 15, 2025 and system should be delivered to be integrated by June 30, 2025. Any delays or issues should be promptly reported via email.

File details come from the government source that posted it. Updated .