This Statement of Work outlines requirements for LWP Technologies, LLC to support NASA Wallops Flight Facility's RockOn and RockSat-C student launch programs from December 2024 to September 2025. The work primarily takes place in Aurora, Colorado, with required travel to WFF for workshops, integration, launch, and recovery activities.

The contractor's key responsibilities include: revising and testing flight code for RockOn equipment; installing approximately 400 surface mount components on flight computers; conducting 32 technical reviews across 4 RockSat-C teams with a 90% completion target; providing onsite technical support for 20-25 RockOn teams during June 2025 workshops; hiring 6-10 collegiate student helpers; and supporting a Minority Serving Institution Faculty workshop for 12-15 STEM faculty in May 2025. The work involves hardware preparation, software development, technical reviews, documentation support for NASA's Sounding Rocket Program Office, and direct support of student workshops and launch activities.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

The services to be performed by the LWP Technologies, LLC (LWP) company will support the WFF Education Team in delivering the RockOn and RockSat-C student launch opportunities conducted at Wallops Flight Facility (WFF) in collaboration with the NASA Sounding Rocket Program Office in December 2024 – September 2025.

2. Characteristics, Scope, and Specs The contractor shall perform the following duties in the following areas:

A. Provide support to NASA Wallops Flight Facility (WFF) for the RockOn and RockSat-C student launch opportunity which will include the following:

a. Revise and test flight code for the flight computer, Geiger counter, and sensor suite for the RockOn board

b. Perform installation of all surface mount components on the flight computer for

RockOn (~400 components)

c. Support kitting operations during final buildup of team hardware

d. Schedule and conduct required 8 reviews per team for 4 of the 8 RockSat-C teams (~32 reviews total) and provide a summary and required actions (Conceptual Design Review, Preliminary Design Review, Critical Design Review, Subsystem Test Review, Integrated Systems Test Review, Full Mission Simulation Review, Visual Verification Check-in) with the expectation that 90% of the teams will complete the reviews and finalize their experiments

e. Support WFF Education Team and experts on RockSat-C reviews and documentation for NASA Sounding Rocket Program Office

f. Support the work onsite at WFF for RockSat-C integration and testing in June 2025

g. Provide feedback on RockSat-C team final reports

h. Hire and pay 6-10 collegiate student helpers who will support the hands-on workshops at WFF

i. Provide onsite technical support at WFF during workshop instruction in June 2025 for the 20 to 25 teams with 3 to 4 students and faculty member for each RockOn Team

j. Travel support for item i

B. Provide support to NASA Wallops Flight Facility (WFF) for the Minority Serving

Institution (MSI) Faculty workshop

a. Support planning and conducting the MSI Faculty workshop to be held at WFF for 12 to 15 STEM MSI faculty from across the U.S. in May 2025

b. Travel support for item a

3. Place of Performance

Majority of the work will take place in Aurora, Colorado. Travel to WFF is required for workshops, integration, launch, and recovery.

4. Period of Performance Services provided from December 31, 2024 to September 30, 20