StatementofWork-Triggs_20241104145250.673_X.pdf

PDF 18 KB Posted

Attached to
Steve Maher on bolometer readout support and running our cryogenic systems. Federal contract opportunity
Solicitation number
80NSSC256377
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This document is a Statement of Work (SOW) for a contract opportunity to provide support for running cryogenic systems and advanced analysis of bolometer readouts. The key details are:

The SOW requires the contractor to design and implement custom laboratory instrumentation and functionality for advanced bolometer array analysis, provide assistance and consultation in running bolometer lab equipment, collect and analyze experiment data, and document system design and modifications. The work will be performed at the NASA/Goddard Space Flight Center, with a period of performance from November 1, 2024 to September 30, 2025.

The associated federal contract opportunity is a sole source procurement by the NASA Shared Services Center to acquire these services from Triggs Tech LLC. The government intends to acquire commercial items and services using FAR Part 12 and FAR Part 13 procedures. Interested parties may submit capability statements by November 11, 2024, which will be evaluated to determine if the procurement should be competed.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (Sample)

1. Objective/Requirements

• Triggs will provide support for running our cryogenic systems and support of advanced analysis of bolometer readouts.

2. Characteristics, Scope, and Specs

• Design and implement custom laboratory instrumentation and functionality appropriate for advanced analysis of bolometer arrays

• Provide assistance and consultation in running bolometer laboratory equipment

• Collect and analyze experiment data and document results

• Document system design and modifications

3. Place of Performance

NASA/Goddard Space Flight Center

4. Period of Performance

• Start Date: Nov 1, 2024

• End Date: Sept 30, 2025

File details come from the government source that posted it. Updated .