SATPC0035503 Tab 04 4 SOW..pdf

PDF 218 KB Posted

Attached to
Five-bladed propeller for NASA LaRC B-200 (N529NA). P/N 19BC-61-42-1E.
Solicitation number
80NSSC24874506Q
Issued by

About this file

This document is a Statement of Work (SOW) for a federal contract opportunity to provide a five-bladed propeller, part number 19BC-61-42-1E, for a NASA B200 aircraft (N529NA) operated by the Langley Research Center (LaRC). The vendor shall provide the propeller, necessary airworthiness documentation, installation drawings, and instructions. The parts procurement must be completed by July 31, 2024, with installation to be performed by NASA LaRC personnel during scheduled maintenance. This is a sole-source requirement, with the NASA Shared Services Center as the procuring agency. No place of performance is specified, as this is a parts procurement only contract.

View the file

Other files

File Type Posted
SATPC0035503 Tab 07 Capability Statement SAM.gov.pdf PDF
SATPC0035503 Tab 06 RDSS..pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements Upgrade the NASA B200 (N529NA) to improve aircraft performance for the purpose of expanding capability in support of future Airborne Science Projects.

2. Characteristics, Scope, and Specs The vendor shall provide the following items (description):

a. 19BC-61-42-1E (5 Blade Propeller)

b. 8130-3 (FAA Airworthiness)

c. Shipping

The vendor shall provide all installation drawings and instructions for the parts listed above. The vendor shall provide applicable FAA Supplemental Type Certificate (STC) or airworthiness certificates, Airplane Flight Manual (AFM) Supplement, and Instructions for Continued Airworthiness (ICA).

3. Place of Performance Not applicable. Parts procurement only. Installation of parts will be performed at NASA LaRC by Research Services Directorate (RSD), Research Services Integration Branch (RSIB) personnel.

4. Period of Performance Procurement of parts before 31 July 2024. Installation to be determined during scheduled maintenance of N529NA.

mailto:dsylvester@raisbeck.com

File details come from the government source that posted it. Updated .