This document is a Statement of Work (SOW) for the procurement of consulting services for the design of a Low Voltage Power Converter (LVPC) board for the Lunar Environment Monitoring Station (LEMS) project.
The SOW outlines the scope of the consulting services, which includes reviewing the current LVPC design, assessing the circuit architecture, design performance, breadboard testing plan, and migration to a flight design. The consultant must be a sensor power systems engineer. The deliverables include four remote meetings with the GSFC LVPC development team, a brassboard circuit performance assessment, an engineering unit schematic review, an engineering unit test plan review, and a flight implementation plan review.
The related federal contract opportunity is a sole source procurement for the consulting services, to be awarded to BATTEL ENGINEERING INC under FAR 13.106-1(b)(1)(i). The solicitation number is 80NSSC24872865Q, and the performance location is at NASA/Goddard Space Flight Center (GSFC). The agency is the National Aeronautics and Space Administration Shared Services Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0035450 Tab 07 Capability Statement SAM Comm.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FORMAT
Procurement of Consulting Service for Low Voltage Power Convertor Design
06/04/2024
PR: _____________________
Note: Only use the sections that are applicable to your service procurement.
Background The Lunar Environment Monitoring Station (LEMS) project is ordering consulting service for a senior power systems engineer to review the current design and implementation plan of the Low Voltage Power Convertor (LVPC) board.
Scope The supplier shall provide consulting time to the LEMS team. Consulting will include the following topics:
- circuit architecture
- design expected performance
- breadboard testing plan
- breadboard migration to flight design.
Requirements
- The consultant shall be a sensor power systems engineer.
Deliverables or Delivery Schedule
• 4 meetings (remote) with the GSFC LVPC development team
• Brassboard Circuit Performance assessment
• Engineering Unit Schematic review
• Engineering Unit Test plan review
• Flight implementation plan review