SOW.pdf

PDF 807 KB Posted

Attached to
60ft Sphere HEPA Filters Federal contract opportunity
Solicitation number
80NSSC24867897Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This document is a Statement of Work (SOW) for the Human Landing System (HLS) Plume Surface Interaction Ground Test project, which requires the installation of HEPA filters into six different locations inside the 60ft Vacuum Sphere Facility at the Langley Research Center.

The contractor shall produce 34 HEPA filters that are 99.97% efficient at 0.3 microns and rated for 2000 CFM, with stainless steel frames and vacuum-approved silicone gaskets. The contractor shall also produce 8 custom filter frame assemblies for the sphere's diffusion pumps, in-bleed and vent adapters, lid, raised floor, and main intake. The contractor shall collaborate with the Langley test team to ensure accurate measurements, bolt patterns, placements, and fit of the components. The period of performance requires the contractor to design, develop, and deliver the required materials by August 2024.

The related federal contract opportunity is a sole source procurement for the 60ft Sphere HEPA Filters, which NASA intends to award to FILTRA-SYSTEMS COMPANY, LLC under the authority of FAR 13.106-1(b)(1)(i). The NAICS code for this procurement is 333998. Interested organizations may submit their capabilities and qualifications to the identified point of contact by 5/8/2024, after which the government will determine whether to conduct a competitive procurement.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements Human Landing System (HLS) Plume Surface Interaction Ground Test project requires HEPA filter installation into six different locations inside the 60ft Vacuum Sphere Facility. The HEPA filters are intended to protect the facility vacuum system from the entry of particulate matter during a test with lunar simulant ejecta inside the sphere at vacuum. Proposal/Bid will be chosen based on technical acceptance and past performance.

2. Characteristics, Scope, and Specs

The contractor shall perform the following duties:

Produce HEPA filters according to the following specifications:

o 99.97% @ 0.3 micron HEPA filters rated for 2000 CFM each o Frame constructed from 304 stainless steel o Outside dimensions of 23.375” x 23.375” x 11.5” o 1.4” Vacuum approved silicone gaskets shall be included for each to seal filter to the frame assembly o Can withstand a vacuum of .7 TORR o Potted internally with a 2-part polyurethane sealant

Produce filter frame assemblies for:

o Sphere Diffusion Pumps x (4)

3/8” aluminum alloy custom adaptor plate with multi-bolt pattern to match the mounting locations

Custom captive swing bolt style clamping system to seal filter to frame Frame is constructed from aluminum to reduce corrosion o In-bleed and Vent Adapters x (2) 36” diameter, custom circular cover with pull-down bracketry to seal with radius interior floor Constructed from aluminum to reduce corrosion Custom captive swing bolt style clamping system to seal filter to frame o Lid x (1) Keeping all filters consistent, the Regolith bin lid will utilize the same filter Constructed from aluminum to reduce corrosion Custom captive swing bolt style clamping system to seal filter to frame o Raised Floor x (1) Keeping all filters consistent, the Regolith bin lid will utilize the same filter Constructed from aluminum to reduce corrosion Custom captive swing bolt style clamping system to seal filter to frame o Sphere Main Intake x (1) Constructed from aluminum to reduce corrosion Custom captive swing bolt style clamping system to seal filter to frame o Vendor shall collaborate with LaRC test team to ensure measurements, bolt patterns, placements, and fit are accurate and technically acceptable.

On-site collaboration may be suggested

Components List:

Filters w/gaskets

Location Main Spares Lid 1 1 Raised Floor 1 1 Sphere In-bleed Vent 1 1 Sphere Vacuum Pump Vent 1 1 Sphere Diffusion Pump 4 4 Sphere Main Intake 9 9 Total 17 17 34

Frames Location Main Diffusion Pumps 3/8" thk Al Aly multi-bolt plate 4 Vent Adaptors 2 Additional (Lid & Raised Floor) 2 Total 8

3. Place of Performance Langley Research Center, Hampton, VA

4. Period of Performance Vendor shall design, develop, and deliver the required materials by August of 2024.