SATPC0034523 TAB 04 4 SOW.pdf
PDF 138 KB Posted
- Attached to
- Install new Moog hydraulic valve controllers Federal contract opportunity
- Solicitation number
- 80NSSC24864767Q
About this file
This document is a Statement of Work (SOW) for the installation of new Moog hydraulic valve controllers for the main pitch and inching circuits of the National Transonic Facility (NTF) pitch controller system at the NASA Langley Research Center (LaRC) NTF. The SOW specifies the required parts, including one Moog D792 digital pilot stage valve, one Moog D637 valve, and onsite startup services with Hydraulic Pneumatic Systems and Moog personnel for installation, training, and tuning. The period of performance is 34 weeks, which includes procurement of long-lead materials, installation, and startup tuning.
The related federal contract opportunity is a sole-source procurement by NASA/NSSC to acquire the required products and services from Hydraulic and Pneumatic Systems Inc. under the authority of FAR 13.106-1(b)(1)(i). The procurement will be for commercial items and services using FAR Part 12 and FAR Part 13 procedures. Interested organizations may submit their capabilities and qualifications in writing by 3/25/2024 for the government's consideration of a competitive procurement.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements Install new Moog hydraulic valve controllers for the main pitch and inching circuits for the National Transonic facility (NTF) pitch controller system at the NASA Langley Research Center (LaRC) NTF.
2. Characteristics, Scope, and Specs
Procure:
Quantity: 1 Item Part: Moog D792 with digital pilot stage, S40KA5VSE2-BOK1A2
Quantity: 1 Item Part: Moog D637, R40K02MOHSE2-AOK1A1
Quantity: 1 Item Part: Onsite start up services with HPS and Moog, to include two full days onsite with Hydraulic Pneumatic Systems and Moog personnel. Service to include a 1/2 day of training on the digital valve software, installing new valves on manifolds and tuning the new valves to the existing system.
3. Place of Performance Materials to be used in NASA LARC NTF
4. Period of Performance 34 week (includes long lead materials, installation and startup tuning)