SATPC0034111 Tab 04 4 SOW_Revised.pdf

PDF 189 KB Posted

Attached to
Electrical wires and connectors for Super Pressure Balloon Instrumentation system
Solicitation number
80NSSC24860525Q
Issued by

About this file

This statement of work outlines requirements for manufacturing and delivering electrical wires and connectors for a Super Pressure Balloon Instrumentation system. The National Aeronautics and Space Administration Shared Services Center seeks these products to support strain and load data collection as part of its Ultra Long-Duration Balloon flight qualification effort. The contractor shall manufacture and deliver specified quantities of various gauges of shielded and unshielded twisted pair wires, single conductor wires, ground lugs, and connector types by June 30, 2024 at a place of performance in Thief River Falls, Minnesota. The period of performance is from February 16, 2024 through completion of deliveries by June 30, 2024.

View the file

Other files

File Type Posted
SATPC0034111 Tab 04 4 SOW_Revised.pdf PDF
SATPC0034111 Tab 10 RFQ Open Market.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements The Balloon Program Office’s Ultra Long-Duration Balloon (ULDB), known as the “Super Pressure Balloon” requires strain and load data as part of its flight qualification effort. The balloon must meet the loading requirements as well as provide the ability to measure excessive loads during an anomaly to aid in root cause investigations of unplanned balloon flight terminations.

2. Characteristics, Scope, and Specs

The contractor shall perform the following duties: manufacture and deliver this BOM to

WFF:

List of Materials for SPBI Cable Builds Part Number Manufacturer

Quantity required

24AWG UTP

55A0121-24-0/9-

DS-ND

TE Connectivity Raychem Cable Protection 400

24AWG STP

55A1121-24-6/9-9-

DS-ND

TE Connectivity Raychem Cable Protection 400

24AWG single

44A0111-24-9-MX-

DS-ND

TE Connectivity Raychem Cable Protection 400

22AWG UTP

55A0121-22-0/9-

DS-ND

TE Connectivity Raychem Cable Protection 1000

22AWG STP A132388-DS-ND

TE Connectivity Raychem Cable Protection 100

22AWG Single

55A0111-22-9-DS-

ND

TE Connectivity Raychem Cable Protection 550

20AWG UTP

44A0121-20-0/9-

MX-DS-ND

TE Connectivity Raychem Cable Protection 50

Gnd lug WM24863-ND Molex 6

DB25P

1003-M24308/4- 8Z-ND ITT Cannon 24

DB25S

1003-M24308/2- 8F-ND ITT Cannon 18

DB9P IM24308/4-1F-ND ITT Cannon 45 DB9S IM24308/2-1Z-ND ITT Cannon 27

HD-26P A34442-ND TE Connectivity AMP Connectors 6

HD-26S

M24308/2-12FPG-

ND ITT Cannon 6

DB50S 1122-1268-ND TE Connectivity AMP Connectors 6 HD-78S 1122-1265-ND TE Connectivity AMP Connectors 15 HD-78P A34448-ND TE Connectivity AMP Connectors 24

HD-104S A34449-ND TE Connectivity Aerospace 3

HD-104P 1122-1266-ND 3

PT07H-12-10P

1178-PT07H-12-

10P-ND Amphenol Aerospace Operations 3

Sleeving 1030- CCP0.38BK100-ND Techflex 100

3. Place of Performance Thief River Falls, MN

4. Period of Performance February 16 2024 through June 30, 2024.

File details come from the government source that posted it. Updated .