STATEMENT OF WORK.pdf

PDF 105 KB Posted

Attached to
642‐1(30W) SOFT X‐RAY SOURCE
Solicitation number
80NSSC242524
Issued by

About this file

The document provided is a Statement of Work (SOW) and a related Federal Contract Opportunity.

The SOW outlines the requirement for a Soft X-Ray Source, including specific details on the product characteristics, scope, and specifications. The vendor is required to supply a Soft X-ray source "642-1(30W)" with a carousel holding six anodes, along with a compatible power supply and accessories such as Mg, Al, Si, Sapphire, Mn, and Fe anodes. The place of performance is not specified, and the vendor quotes a factory lead time of 16 weeks.

The related Federal Contract Opportunity is a pre-solicitation for the "642‐1(30W) SOFT XRAY SOURCE" requirement. NASA/NSSC intends to issue a sole source contract to MCPHERSON, INC. under the authority of FAR 13.106-1(b)(1)(i) due to the compatibility of the equipment with existing NASA instruments. The NAICS code for this procurement is 334516. Interested organizations may submit their capabilities and qualifications by 9/11/2024, which the government will evaluate to determine if the procurement should be conducted on a competitive basis.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements Provide soft X-ray source as enumerated below.

2. Characteristics, Scope, and Specs

The vendor shall supply the following Soft X-ray source “642-1(30W)” with accompanying power supply and anodes:

1 Soft x-ray multianode light source, 30 Watt, with carousel holding six anodes (642-1(30W))

1 100% UHV Compatible (642-UHV) 1 Spellman HV power supply compatible cable (XUL-10) 1 Mg Anode (266-113206-Mg) 1 Al Anode (266-113206-Al) 1 Si Anode (266-113206-Si) 1 Sapphire Anonde (266-113206-Al2O3) 1 Mn Anode (266-113206-Mn) 1 Fe anode (266-113206-Fe)

Place of Performance N/A

3. Period of Performance Vendor quotes factory lead time of 16 weeks.

File details come from the government source that posted it. Updated .