80NSSC22799316Q - SOW.pdf
PDF 144 KB Posted
- Attached to
- A new 24-inch vacuum chamber door and associated hardware to mount it to an existing vacuum chamber.
- Solicitation number
- 80NSSC22799316Q
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 80NSSC22799316Q - Requirement Drawings.pdf | ||
| 80NSSC22799316Q - Requirement Drawings.pdf | ||
| 80NSSC22799316Q - RFQ Open Market.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NASA Glenn Research Center Statement of Work for 24 Inch Vacuum Chamber Parts
10/23/17 sdm
A. Background
GRC is currently working to procure hardware to allow an existing vacuum chamber to keep running for tests.
B. Quality Assurance
100% Dimensional Inspection, Mill Test Reports and Certificates of Conformance are required for all materials and any Special Processes. Documentation shall be delivered with hardware.
C. Reference Documents (e.g. drawings, procedures, computer files, etc.)
Drawing Number Drawing Name Quantity DOR101 Door Machining 1 DOR101W Door Welding 1 DOR102 Tab 1 DOR103 Hinge 1 DOR104 Hinge Block 2 DOR105 Bolt Tab 2 DOR106 Hinge Pin 1 DOR107 Knob Bolt 2 DOR108 Knob Bolt Tab 2 DOR109 Knob Bolt Nut 2 DOR110 Stepped Washer 8
D. Government Furnished Equipment
None
E. Scope of Work to be Performed
Disciplines:
1) Machining
2) Welding/Metal Joining
3) Instrumentation
4) Materials
F. Environmental Impacts
None
NASA Glenn Research Center Statement of Work for 24 Inch Vacuum Chamber Parts
10/23/17 sdm
G. Inspections
100%-Dimensional Inspection for all dimensions shown on drawings, with documentation is required for all manufactured items. Documentation shall be delivered with hardware.
H. Milestones
Weekly progress reports are required. Parts are to be delivered in 8 weeks after receipt of order.
I. Deliverables
All hardware per provided drawings, full inspection report for all manufactured hardware, Mill Test Reports and Certificates of Conformance for all material.
J. Period-of-Performance
Parts are to be delivered in 8 weeks after receipt of order.
K. Non-Conforming Parts
Non-Conforming parts will be evaluated by NASA Glenn Research Center for possible rework or re-make or acceptance “as-is”. Parts determined to require rework or re-make will be reworked at the vendor’s expense, including shipping and handling from and to NASA Glenn Research Center.