Attachment_1_Cost Forms_Draft revision inspected.xlsx

XLSX spreadsheet 4 MB Posted

Attached to
DRAFT Request for Proposal for NASA LARC Research, Science, and Engineering Services Federal contract opportunity
Solicitation number
80LARC22R0003
Issued by
National Aeronautics and Space Administration Langley Research Center

About this file

This document summarizes a draft request for proposal for research, science, and engineering services to support 15 technical discipline areas at the National Aeronautics and Space Administration Langley Research Center. The contract will be awarded as a total small business set-aside and have a period of performance of eight years with a three-year base period followed by option periods. The work encompasses technology readiness levels from fundamental research through flight hardware and requires expertise across disciplines from autonomous systems to atmospheric science. The contract type will be cost-plus award fee with the ability to convert to cost-plus fixed fee based on performance. The anticipated release date for the draft RFP is March 29, 2022 with the final RFP approximately 60 days later and proposals due 45 calendar days after that. The pre-solicitation conference details will be in the draft RFP and all questions must be submitted electronically by March 16. Additional information is available at the provided website.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT Request for Proposal for NASA LARC Research, Science, and Engineering Services, newest first.
File Type Posted
80LARC22R0003_RSES_DRFP_QAs_v3.2_20220512_sam.gov.pdf PDF
80LARC22R0003_RSES_DRFP_QAs_v2.0_20220503_sam.gov.pdf PDF
80LARC22R0003_RSES_DRFP_QAs_v2.0_20220503_sam.gov.pdf PDF
RSES Pre-solicitation Conf Attendance Report (1).pdf PDF
RSES Conference_Directorate Presentations.zip ZIP file
RSES Pre-Solicitation Conf_20220419(1).pdf PDF
80LARC22R0003_RSES_DRFP_Q-A_v1.0_20220331.pdf PDF
RSES DRFP Attachments.zip ZIP file
RSES DRFP_Cover Letter and Sections A-M_20220329.pdf PDF
RSES DRFP Exhibits.zip ZIP file
RSES_Presolicitation Notice_3MAR2022.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Research Science and Engineering Services (RSES)

INSTRUCTIONS FOR COST FORMS A - K

NOTE: For ALL Cost Forms Offeror is to enter data or create formulas in GREEN HIGHLIGHTED cells only. If an offeror enters data or modifies a formula in a non highlighted cell, offeror shall HIGHLIGHT the cell in YELLOW.
1. Follow the instructions found in Section L.23 INSTRUCTIONS FOR VOLUME III - COST/PRICE PROPOSAL (FACTOR 3) and below, and those on the Cost Forms. This reduces duplication of data input effort, minimizes errors, and allows a consistent, timely and fair evaluation of all proposals.
2. Submit Cost Forms CLIN Summary, Phase-In, and Cost Forms A - J, along with supporting direct and indirect rates under a single file name or directory. Provide formulas (bases, rates and cost calculations) used to derive all dollars shown, where applicable. Do not hard code values. The composition of a composite rate must be shown. Formulas have been provided for linkage between worksheets. It is the offeror's responsibility to ensure accuracy of all fomulas.
3. CLIN Summary - formulas have been provided that brings the costs from the other worksheets as appropriate. Offeror is to confirm accuracy of all formulas.
4. Cost Form K - Phase-In - offeror to provide FFP price for 90 day Phase-In period and to provide a narrative of what will be performed during the phase-in period and when, to ensure an effective phase-in of contract performance.
5. Cost Form A - Summary - Formulas have been provided that summarize the costs and fee by year and period. The IDIQ maximum is aslo summarized. Offeror is to confirm accuracy of all formulas.
6. Cost Form A1- & A2: Summarizes the proposed hours, costs by specific element, fee and IDIQ by contract period. Formulas have been prepared that brings the hours and costs from the appropriate worksheets. Offeror is to confirm accuracy of all formulas. Offeror to provide formulas that accurately distributes indirect costs based on offeror's accounting system.
7. Cost Form A3-A4 Program Management Costs: Offerors to provide direct cost or pool information for program management costs to be charged to the contract.
8. Cost Form A5 Offsite Facility Costs: Offerors to provide direct cost or pool information for offsite facility costs to be charged to the contract.
9. Cost Form B: Summarize proposed labor rates by labor category. Offeror to enter contractor fiscal month end, escalation rates by period, and direct labor rates by labor category. See additional instructions on Cost Form B
10. Cost Form C: Offeror to enter all indirect rates in accordance with their accounting system. Create formulas to calculate composite indirect rates where the contract years cross over contractor fiscal years. Appropriate contract year indirect rates shall be used to determine indirect costs on Cost Forms A1 and A2.
11. Cost Forms D1, D2, D3 and Do - Offeror's Significant Subcontractors to complete Cost Form D1,D2,D3 and submit to NASA, redacted Cost Form may be submitted to Offeror. Additional Cost Forms D4 and so on may be added for additional Significant Subcontractors. Modify remaining Cost Forms to accommodate.
12. Cost Form E4.1-E4.15: PRIME CONTRACTOR ONLY - Offeror to enter Prime (offeror) and Subcontractor Hours and WYEs by Discipline in appropriate column. Distribute only those hours in column C (4.n Hours) so that Column X (Hours Check) equals zero (0).
13. Cost Form F1-F4 - Schedule of Rates - Offeror to enter formulas to build up labor rates, linking to Cost Form C and using formulas consistent with those entered on Cost Forms A1 and A2. Significant Subcontractors toenter formulas to build up labor rates, linking to Cost Form C and using formulas consistent with those entered on Cost Forms A1 and A2 for htose Labor Categories they will be supporting the Offeror.
14. Cost Form G: Provides the estmated hours by discipline, not to be manipulated by the contractor.
15. Cost Form H: Summarize status of contractor's systems reviews. Offeror to complete.
16. Cost Form I: Offerors shall complete the cost form "Limitations on Subcontracting to show compliance with FAR 52.219-14(b)(1). Distribute the appropriate similarly situated costs and provide evidence that subcontractor qualifies as similarly situated.
17. Cost Form J - Enter Contractor proposed ODCs descriptions and costs not covered by Government Directed ODCs.
BEFORE YOU SUBMIT THIS COST PROPOSAL:
* Be sure you have complied with the instructions provided in the solicitation and in this spreadsheet.
* Verify the cell contents are showing formulas rather than absolute values.
* Confirm all categories and elements have been addressed.
* Save all electronically submitted price information and Cost Forms under a single file or directory name.
* Additional instrutions provided on each cost form tab.

Cost Forms Data Flow

- requires Offeror input.
- No Offeror input required. Offeror to confirm accuracy of formulas.
Cost Form B Labor RatesOfferor inputs direct labor rates by labor category
Cost Form D1-D3 Significant SubK Labor RatesOfferor inputs Significant SubK rates by labor category, redacted
Significant SubK inputs unredacted data by labor category and submits to NASA directly
Cost Form Do Other SubK RatesOfferor inputs Other SubK Bill Rates by labor category
Cost Form G - Labor Hour SummaryNASA Provided Labor Hours by Labor Category/PWS
Cost Forms E4.1-E4.15Offeror inputs hours by labor category to be performed by Offeror, Significant SubK, and/or Other SubK
Cost Form ECalculated summary by CLIN/PWS
Cost Form C - Indirect RatesOfferor inputs indirect pools, identifies Allocation Bases
Cost Form F1-4 Schedules of RatesOfferor and Sig Subks provide formulas for the buildup of Labor Category rates, bringing labor rates and indirect rates from other cost forms
Cost Form A3 Program Management SummaryOfferor to provide approach and rationale for charging program management costs to the contract.
Cost Form A4 - Program Management LaborOfferor to provide approach and rationale for charging program management costs to the contract.
Cost Form A5 - Offsite FacilityOfferor to provide approach and rationale for charging offsite facility costs to the contract.
Costs Forms A1 and A2Offeror inputs formulas for indirect pools to calculate estimated costs.
Cost Form A summaryCalculated Summary by cost elements
Cost Form PHASE INOfferor provides a FFP price for phase in and provides narrative of what will be perfomred during phase in.
CLIN SummaryCalculated summary by CLIN/PWS

Cost Form A1 CLIN 002 SUMMARY

Cost Form A2 CLIN 003 SUMMARY

Cost Form A TOTAL COST SUMMARY

Cost Form E

Cost Forms E4.1-E4.15

CLIN SUMMARY

Cost Form B Labor Rates

Cost Form D1-D3 Significant SubK Rates

Cost Form Do Other SubK Rates Cost Form C - Indirect Rates

Cost Form G - Labor Hour Summary

Green Blue Cost Form F PRIME SCHEDULE OF RATES Cost Form CLIN 0001 PHASE IN Cost Form A3 PROGRAM MANAGEMENT SUMMARY

Cost Form A4 PROGRAM MANAGEMENT LABOR

Cost Form A5 OFFSITE FACILITY

CLIN Summary

CLIN SUMMARY
Research Science and Engineering Services (RSES)
Summary of Total CPAF/CPFF
CLIN 0001Phase In$ - 0
CLIN X002$ 13,000,000
CLIN X003$ 7,800,000
CLIN X004 IDIQ$ 400,000,000
Total$ 420,800,000

All data flows from other worksheets. Confirm accuracy of formulas.

Cost Form K - Phase In

CLIN 0001
Phase in Price - FFP$ - 0
Enter FFP Price and provide narrative of phase In work.
Show build up of Price supporting approach.

Cost Form A - Summary

COST FORM A - All CLINs
Research Science and Engineering Services (RSES)
Summary of Total CPAF/CPFF
Offeror:5/1/2023-
4/30-20245/1/2024-
4/30-20255/1/2025-
4/30-20265/1/2026-
4/30-20275/1/2027-
4/30-20285/1/2028-
4/30-20295/1/2029-
4/30-20305/1/2030-

4/30-2031

NotePhase In PeriodBase Yr 1 12 mos.Base Yr 2 12 mos.Base Yr 3 12 mos.Total Base 36 mos.Opt 1 Yr 1 12 mos.Opt 1 Yr 2 12 mos.Total Opt 1
24 mos.Opt 2
12 mos.Opt 3
12 mos.Opt 4
12 mos.Total Option Periods 60 mos.Total Contract

96 mos.

Phase In - FFP 1 $0 $0

Total Cost $0 $2,600,000 $2,600,000 $2,600,000 $7,800,000 $2,600,000 $2,600,000 $5,200,000 $2,600,000 $2,600,000 $2,600,000 $13,000,000 $20,800,000

Total Fee N/A $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total Base Mission Support $0 $2,600,000 $2,600,000 $2,600,000 $7,800,000 $2,600,000 $2,600,000 $5,200,000 $2,600,000 $2,600,000 $2,600,000 $13,000,000 $20,800,000

IDIQ Maximum $50,000,000 $50,000,000 $50,000,000 $150,000,000 $50,000,000 $50,000,000 $100,000,000 $50,000,000 $50,000,000 $50,000,000 $250,000,000 $400,000,000

Total CPAF/CPFF $0 $52,600,000 $52,600,000 $52,600,000 $157,800,000 $52,600,000 $52,600,000 $105,200,000 $52,600,000 $52,600,000 $52,600,000 $263,000,000 $420,800,000

Instructions:
(1) Cost Form A is the summary, CLIN 001 FFP Phase-In and proposed costs and fee for CLIN 002 from Cost Form A1 and CLIN 003 from Cost Form A2. All data flows from other worksheets. Confirm accuracy of formulas before submission.

Cost Form A1 - Summary

COST FORM A1 - CLINs X002
Research Science and Engineering Services (RSES)
Summary of Total Contract Hours, Costs, and Price
Offeror:
Cost ElementNoteBase Yr 1 12 mos.Base Yr 2 12 mos.Base Yr 3 12 mos.CLIN 0002 Total (36 mos.)Opt 1 Yr 1 12 mos.Opt 1 Yr 2 12 mos.CLIN 1002 Total Opt 1
24 mos.CLIN 2002

Opt 2 12 mos. CLIN 3002 Opt 3 12 mos. CLIN 4002 Opt 4 12 mos. Total Option Period 60 mos. CLIN X002 Total Contract

1
Direct Labor Hours:2
Prime Contr. Direct Labor Hours- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Subcontr. Direct Labor Hours
Significant Subcontractor 1- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Significant Subcontractor 2- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Significant Subcontractor 3- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Other Subcontractors- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Total Subcontr. Direct Labor Hours- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Total Direct Labor Hours- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Direct Labor Cost3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fringe Benefits4$ - 0$ - 0$ - 0$ - 0
Overhead4$ - 0$ - 0$ - 0$ - 0
Subtotal Labor Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subcontract Costs
Significant Subcontractor 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Significant Subcontractor 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Significant Subcontractor 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other Subcontractors5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Subcontract Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other Direct Costs:
Government Directed ODCs6$ 1,625,000$ 1,625,000$ 1,625,000$ 4,875,000$ 1,625,000$ 1,625,000$ 3,250,000$ 1,625,000$ 1,625,000$ 1,625,000$ 8,125,000$ 13,000,000
Other ODCs (List Separately)7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Other Direct Costs$ 1,625,000$ 1,625,000$ 1,625,000$ 4,875,000$ 1,625,000$ 1,625,000$ 3,250,000$ 1,625,000$ 1,625,000$ 1,625,000$ 8,125,000$ 13,000,000
Material /Subcontractor Handling (if applicable)4$ - 0$ - 0$ - 0$ - 0
Program Management8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Offsite Facilities9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal$ 1,625,000$ 1,625,000$ 1,625,000$ 4,875,000$ 1,625,000$ 1,625,000$ 3,250,000$ 1,625,000$ 1,625,000$ 1,625,000$ 8,125,000$ 13,000,000
G&A4$ - 0$ - 0$ - 0$ - 0
Total Fee Bearing Cost$ 1,625,000$ 1,625,000$ 1,625,000$ 4,875,000$ 1,625,000$ 1,625,000$ 3,250,000$ 1,625,000$ 1,625,000$ 1,625,000$ 8,125,000$ 13,000,000
FCCOM4$ - 0$ - 0$ - 0$ - 0
Total Cost$ 1,625,000$ 1,625,000$ 1,625,000$ 4,875,000$ 1,625,000$ 1,625,000$ 3,250,000$ 1,625,000$ 1,625,000$ 1,625,000$ 8,125,000$ 13,000,000
Fixed Fee10$ - 0$ - 0$ - 0$ - 0
Award Fee10$ - 0$ - 0$ - 0$ - 0

Total Base Mission Support $ 1,625,000 $ 1,625,000 $ 1,625,000 $ 4,875,000 $ 1,625,000 $ 1,625,000 $ 3,250,000 $ 1,625,000 $ 1,625,000 $ 1,625,000 $ 8,125,000 $ 13,000,000

Total $ 1,625,000 $ 1,625,000 $ 1,625,000 $ 4,875,000 $ 1,625,000 $ 1,625,000 $ 3,250,000 $ 1,625,000 $ 1,625,000 $ 1,625,000 $ 8,125,000 $ 9,750,000

Instructions:
(1) Cost Form A1 is the summary of all proposed costs and fee for CLIN X002. Summary Cost Form A1 applicable information consistent with Cost Form E. Each significant subcontractor providing direct labor hours must provide applicable Cost Form D1 with unredacted information pursuant to Section L.23 INSTRUCTIONS FOR VOLUME III - COST/PRICE PROPOSAL (FACTOR 3)
(2) Proposed Direct Labor Hours for Prime, Significant Subcontractors and Other Subcontractors shall flow from Cost Form E.
(3) Proposed Direct Labor Costs shall flow from Cost Form E.
(4) Proposed indirect costs shall be developed using the appropriate contract year indirect rates from Cost Form C. Offeror shall provide FORMULAS applying indirect costs.
(5) Offeror shall show the name and total costs for each significant subcontractor (defined at L.22(b)) separately.
(5) Total Other Subcontractor Costs shall flow from Cost Form E.
(6) Include dollar amounts per year pursuant to Section L.23 INSTRUCTIONS FOR VOLUME III - COST/PRICE PROPOSAL (FACTOR 3)
(7) List separately any other ODCs not identified in Section L.23, government provided ODC amount
(8) Proposed Program Management Costs shall flow from Cost form A3
(9)Proposed Offsite Facility Costs shall flow from Cost form A5
(10) Offeros shall propose an Award fee which shall be included for evaluation purposes. Offerors shall aslo propose a fixed fee equal to or less than the award fee for use if contract is converted from award fee to fixed fee.

Cost Form A2 - Summary

COST FORM A2 - CLINs X003
Research Science and Engineering Services (RSES)
Summary of Total Contract Hours, Costs, and Price
Offeror:
Cost ElementNoteBase Yr 1 12 mos.Base Yr 2 12 mos.Base Yr 3 12 mos.CLIN 0003
Total Base 36 mos.Opt 1 Yr 1 12 mos.Opt 1 Yr 2 12 mos.CLIN 1003

Total Opt 1 24 mos. CLIN 2003 Opt 2 12 mos. CLIN 3003 Opt 3 12 mos. CLIN 4003 Opt 4 12 mos. Total Option Period 60 mos. CLIN X003 Total Contract

1
Direct Labor Hours:2
Prime Contr. Direct Labor Hours- 0- 0- 00- 0- 00- 0- 0- 000
Subcontr. Direct Labor Hours0000
Significant Subcontractor 1- 0- 0- 00- 0- 00- 0- 0- 000
Significant Subcontractor 2- 0- 0- 00- 0- 00- 0- 0- 000
Significant Subcontractor 3- 0- 0- 00- 0- 00- 0- 0- 000
Other Subcontractors- 0- 0- 00- 0- 00- 0- 0- 000
Total Subcontr. Direct Labor Hours- 0- 0- 00- 0- 00- 0- 0- 000
Total Direct Labor Hours- 0- 0- 00- 0- 00- 0- 0- 000
Direct Labor Cost3$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 000
Fringe Benefits4$ - 0$ - 000
Overhead4$ - 0$ - 000
Subtotal Labor Costs$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 000
Subcontract Costs
Significant Subcontractor 1$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 000
Significant Subcontractor 2$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 000
Significant Subcontractor 3$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 000
Other Subcontractors5$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 000
Total Subcontract Costs$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 000
Other Direct Costs:000
Government Directed ODCs6$ 975,000.00$ 975,000.00$ 975,000.002,925,000$ 975,000.00$ 975,000.001,950,000$ 975,000.00$ 975,000.00$ 975,000.004,875,0007,800,000
Other ODCs (List Separately)7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Other Direct Costs$ 975,000.00$ 975,000.00$ 975,000.002,925,000$ 975,000.00$ 975,000.001,950,000$ 975,000.00$ 975,000.00$ 975,000.004,875,0007,800,000
Material /Subcontractor Handling (if applicable)$ - 0$ - 000
Program Management8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Offsite Facilities9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal$975,000$975,000$975,000$2,925,000$975,000$975,000$1,950,000$975,000$975,000$975,000$4,875,000$7,800,000
G&A4$ - 0$ - 000
Total Fee Bearing Cost$975,000$975,000$975,0002,925,000$975,000$975,0001,950,000$975,000$975,000$975,0004,875,0007,800,000
FCCOM4$ - 0$ - 000
Total Cost$975,000$975,000$975,0002,925,000$975,000$975,0001,950,000$975,000$975,000$975,0004,875,0007,800,000
Fixed Fee10$ - 0$ - 0$ - 0$ - 0
Award Fee10$ - 0$ - 0$ - 0$ - 0

Total Base Mission Support 975000 975000 975000 2925000 975000 975000 1950000 975000 975000 975000 4875000 7800000

Total $975,000 $975,000 $975,000 2,925,000 $975,000 $975,000 1,950,000 $975,000 $975,000 $975,000 4,875,000 7,800,000

Instructions:
(1) Cost Form A1 is the summary of all proposed costs and fee for CLIN X003. Summary Cost Form A1 applicable information consistent with Cost Form E. Each significant subcontractor providing direct labor hours must provide applicable Cost Form D1 with unredacted information pursuant to Section L.23 INSTRUCTIONS FOR VOLUME III - COST/PRICE PROPOSAL (FACTOR 3)
(2) Proposed Direct Labor Hours for Prime, Significant Subcontractors and Other Subcontractors shall flow from Cost Form E.
(3) Proposed Direct Labor Costs shall flow from Cost Form E.
(4) Proposed indirect costs shall be developed using the appropriate contract year indirect rates from Cost Form C. Offeror shall provide FORMULAS applying indirect costs.
(5) Offeror shall show the name and total costs for each significant subcontractor (defined at L.22(b)) separately.
(5) Total Other Subcontractor Costs shall flow from Cost Form E.
(6) Include dollar amounts per year pursuant to Section L.23 INSTRUCTIONS FOR VOLUME III - COST/PRICE PROPOSAL (FACTOR 3)
(7) List separately any other ODCs not identified in Section L.23, government provided ODC amount
(8) Proposed Program Management Costs shall flow from Cost form A3
(9)Proposed Offsite Facility Costs shall flow from Cost form A5
(10) Offeros shall propose an Award fee which shall be included for evaluation purposes. Offerors shall aslo propose a fixed fee equal to or less than the award fee for use if contract is converted from award fee to fixed fee.

CF A3 Program Mgmt Summary

COST FORM A3 - Program Management
Research Science and Engineering Services (RSES)
Program Management Costs Direct Costs or Pool
Offeror:
Cost ElementNoteBase Yr 1 12 mos.Base Yr 2 12 mos.Base Yr 3 12 mos.CLIN 0003
Total Base 36 mos.Opt 1 Yr 1 12 mos.Opt 1 Yr 2 12 mos.CLIN 1003

Total Opt 1 24 mos. CLIN 2003 Opt 2 12 mos. CLIN 3003 Opt 3 12 mos. CLIN 4003 Opt 4

12 mos.Total Option Period 60 mos.CLIN X003
Total ContractInstructions:
PM Indirect Pool or Direct Cost ?Notate in Cell A6 whether Direct Cost or Indirect pool
Labor Category/Costs
Program Manager or other title- 0- 0- 00- 0- 00- 0- 0- 000Program Management as a Direct Cost.
Program Position 2 - Provide title and position description- 0- 0- 00- 0- 00- 0- 0- 0001. Enter Labor categories on Cost Form A4.
Program Position 3 - Provide title and position description- 0- 0- 00- 0- 00- 0- 0- 0002. Add formulas to bring labor costs to Cost Form A3.
Program Position 4 - Provide title and position description- 0- 0- 00- 0- 00- 0- 0- 0003. Create formulas and apply indirect costs to Direct Labor in accordance with offeror's Accounting system
Program Position 5 - Provide title and position description- 0- 0- 00- 0- 00- 0- 0- 0004. Add any ODC's for Program Management and provide rationale.
Program Position 6 - Provide title and position description- 0- 0- 00- 0- 00- 0- 0- 0005. Create formulas and apply indirect costs to ODCs in accordance with offeror's Accounting system
Program Position 7 - Provide title and position description- 0- 0- 00- 0- 00- 0- 0- 0006. Allocate Total Cost of Program Management Costs to A1 and A1.
Program Position 8 - Provide title and position description- 0- 0- 00- 0- 00- 0- 0- 000
Program Management Labor Cost$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 000Program Management as a Indirect Cost. Provide TOTAL Program Management Pool Costs.
Fringe Benefits00001. Enter Labor categories on Cost Form A4.
Overhead00002. Add formulas to bring labor costs to Cost Form A3.
Subtotal Labor Costs$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 0003. Create formulas and apply indirect costs to Program Managment Labor in accordance with offeror's Accounting system
PM ODCs (List Separately)00004. Add any ODC's for Program Management and provide rationale.
00005. Create formulas and apply indirect costs to ODCs in accordance with offeror's Accounting system
00006. Divide Total Cost of Program Management (Overhead Pool) by the Program Management Pool Base. Provide costs included in Base.
00007. Create Formulas and calculate the Program Management costs based on rate times costs from A1 or A2.,
00008. Provide percent of Program Management Overhead Pool allocated to RSES (RSE PM Base Costs/Total PM Base Costs)
0000
0000
0000
Total Other Direct Costs$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 000
Material Handling (if applicable)0000
Total Cost of Program Management$0$0$00$0$00$0$0$000
Overhead pool calculations, if applicable
PMO Overhead Pool$0$0$0$0$0$0$0$0
PMO Base
PMO RateERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Amount to CLIN A10000
Amount to CLIN A20000

Apply to A1 A2 based on PMO Overhead rate or allocated direct cost, based on subtotal costs before PM Costs.

Percent of PM Overhead for RSES

CF A4 Program Management Labor

Cost Form A4 - ProgrmaManagment Labor
Research Science and Engineering Services (RSES)
Summary of Hours by PM Category
Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8
Labor CategoryHoursPay RateCostHoursPay RateCostHoursPay RateCostHoursPay RateCostHoursPay RateCostHoursPay RateCostHoursPay RateCostHoursPay RateCost
Program Manager or other title- 0- 0- 0- 0- 0- 0- 0- 0
Program Position 2 - Provide title and position description- 0- 0- 0- 0- 0- 0- 0- 0
Program Position 3 - Provide title and position description- 0- 0- 0- 0- 0- 0- 0- 0
Program Position 4 - Provide title and position description- 0- 0- 0- 0- 0- 0- 0- 0
Program Position 5 - Provide title and position description- 0- 0- 0- 0- 0- 0- 0- 0
Program Position 6 - Provide title and position description- 0- 0- 0- 0- 0- 0- 0- 0
Program Position 7 - Provide title and position description- 0- 0- 0- 0- 0- 0- 0- 0
Program Position 8 - Provide title and position description- 0- 0- 0- 0- 0- 0- 0- 0
Total Labor- 0- 0- 0- 0- 0- 0- 0- 0
Add lines as necessary, ensure formuls are adjusted for added lines.

CF A5 Offsite Facility

COST FORM A5 - Offsite Facility
Research Science and Engineering Services (RSES)
Offsite Facility Costs Direct Costs or Pool
Offeror:
Cost ElementNoteBase Yr 1 12 mos.Base Yr 2 12 mos.Base Yr 3 12 mos.CLIN 0003
Total Base 36 mos.Opt 1 Yr 1 12 mos.Opt 1 Yr 2 12 mos.CLIN 1003

Total Opt 1 24 mos. CLIN 2003 Opt 2 12 mos. CLIN 3003 Opt 3 12 mos. CLIN 4003 Opt 4

12 mos.Total Option Period 60 mos.CLIN X003
Total ContractInstructions:
Offsite Pool or Direct Cost ?Notate in Cell A6 whether Direct Cost or Indirect pool
Labor Category/Costs
0000Offsite Facility as a Direct Cost.
00001. Enter Labor categories and costs, and provide rationale.
00002. Create formulas and apply indirect costs to Direct Labor in accordance with offeror's Accounting system
00003. Add ODC's for Offsite ODCs and provide rationale.
5. Create formulas and apply indirect costs to ODCs in accordance with offeror's Accounting system.
Direct Labor Cost$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 0006. Allocate Total Cost - Offsite Facility to A1 and A2.
Fringe Benefits0000
Overhead0000
Subtotal Labor Costs$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 000
Other ODCs (List Separately)000Offsite Facility as a Indirect Cost. Provide TOTAL Offsite Facility Pool Costs.
00001. Enter Labor categories and costs, and provide rationale.
00002. Add formulas to bring labor costs to Cost Form A3.
00002. Create formulas and apply indirect costs to Direct Labor in accordance with offeror's Accounting system
00003. Add ODC's for Offsite ODCs and provide rationale.
00005. Create formulas and apply indirect costs to ODCs in accordance with offeror's Accounting system.
00006. Divide Total Cost - Offsite Facility (Overhead Pool) by the Offsite Facility Pool Base. Provide costs included in Base.
7. Create Formulas and calculate the Offsite Facility Costs based on rate times costs from A1 or A2.
Total Other Direct Costs$ - 0$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 000
Material Handling (if applicable)0000
Total Cost - Offsite Facility$0$0$00$0$00$0$0$000
Overhead pool calculations, if applicable
Offsite Overhead Pool$0$0$0$0$0$0$0$0
Offsite Base
Offsite RateERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Amount to CLIN A10000
Amount to CLIN A20000

Apply to A1 A2 based on Offsite Overhead rate or allocated direct cost, based on subtotal costs before Offsite Costs.

CF B-Labor Rates

Cost Form B
Research Science and Engineering Services (RSES)
Labor Rate Chart
Offeror:
LABOR RATE INFORMATION - CONTRACTOR FISCAL YEAR (FY)
Contractor Fiscal Year end Month
Escalation Rate %
Labor CategoriesBase RateCFY 1CFY 2CFY 3CFY 4CFY 5CFY 6CFY 7CFY 8CFY 9
Cloud Architect 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Computer Scientist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Computer Scientist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Computer Scientist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Computer Scientist 6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Computer Scientist 8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Computer Scientist 9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer 6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer 7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer 8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer 9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor 6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor 8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor 9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Software Engineer 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Software Engineer 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
IT System Engineer 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Operational Aircraft Pilot 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Programmer 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Programmer 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Programmer 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Programmer 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Programmer 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Programmer 6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Programmer 7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Research Scientist 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Research Scientist 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Research Scientist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Research Scientist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Research Scientist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Research Scientist 6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Research Scientist 7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Research Scientist 8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Research Scientist 9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scientist 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scientist 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scientist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scientist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scientist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scientist 6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scientist 7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scientist 8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Senior Scientist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Senior Scientist 6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Senior Scientist 8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Senior Scientist 9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter Expert (SME) 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter Expert (SME) 6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter Expert (SME) 7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter Expert (SME) 8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter Expert (SME) 9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Visualization Specialist 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Visualization Specialist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Visualization Specialist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Visualization Specialist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Data Specialist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Data Specialist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Database Administrator 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Operations Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scientific Analyst/Programmer 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scientific Analyst/Programmer 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scientific Analyst/Programmer 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Software Developer 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Software Developer 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Software Developer 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Software Engineer 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Software Engineer 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Software Tester 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Systems Administrator 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Systems Administrator 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Lead 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Supervisor 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Configuration And Data Management Specialist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subcontract Administrator 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Task Project Coordinator 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Task Project Coordinator 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Task Project Coordinator 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Task Project Coordinator 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Task Project Coordinator 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Writer/Editor 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Writer/Editor 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Field Campaign Specialist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Designer 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technician 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technician 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technician 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technician 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technician 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Assistant 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Instructions:
(1) Identify Contractor Fiscal Year (CFY).
(2) Identify the base labor rate and escalation factors used to develop the CFY rates.
(3) If contract year (CY) rates are a composite of CFY rates, confirm the calculation in table below.
(4) All direct labor rates for each CY shall flow to Cost Forms E4.1-E4.15. Offeror to confirm accuracy of formulas.
LABOR RATE INFORMATION - CONTRACT YEAR - Calculated
Contract Year Month end4
Escalation Rate %ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Labor CategoriesCY 1CY 2CY 3CY 4CY 5CY 6CY 7CY 8
Cloud Architect 5- 0- 0- 0- 0- 0- 0- 0- 0
Computer Scientist 3- 0- 0- 0- 0- 0- 0- 0- 0
Computer Scientist 4- 0- 0- 0- 0- 0- 0- 0- 0
Computer Scientist 5- 0- 0- 0- 0- 0- 0- 0- 0
Computer Scientist 6- 0- 0- 0- 0- 0- 0- 0- 0
Computer Scientist 8- 0- 0- 0- 0- 0- 0- 0- 0
Computer Scientist 9- 0- 0- 0- 0- 0- 0- 0- 0
Engineer 1- 0- 0- 0- 0- 0- 0- 0- 0
Engineer 2- 0- 0- 0- 0- 0- 0- 0- 0
Engineer 3- 0- 0- 0- 0- 0- 0- 0- 0
Engineer 4- 0- 0- 0- 0- 0- 0- 0- 0
Engineer 5- 0- 0- 0- 0- 0- 0- 0- 0
Engineer 6- 0- 0- 0- 0- 0- 0- 0- 0
Engineer 7- 0- 0- 0- 0- 0- 0- 0- 0
Engineer 8- 0- 0- 0- 0- 0- 0- 0- 0
Engineer 9- 0- 0- 0- 0- 0- 0- 0- 0
Engineer Supervisor 4- 0- 0- 0- 0- 0- 0- 0- 0
Engineer Supervisor 5- 0- 0- 0- 0- 0- 0- 0- 0
Engineer Supervisor 6- 0- 0- 0- 0- 0- 0- 0- 0
Engineer Supervisor 8- 0- 0- 0- 0- 0- 0- 0- 0
Engineer Supervisor 9- 0- 0- 0- 0- 0- 0- 0- 0
Software Engineer 3- 0- 0- 0- 0- 0- 0- 0- 0
Software Engineer 4- 0- 0- 0- 0- 0- 0- 0- 0
IT System Engineer 5- 0- 0- 0- 0- 0- 0- 0- 0
Operational Aircraft Pilot 4- 0- 0- 0- 0- 0- 0- 0- 0
Programmer 1- 0- 0- 0- 0- 0- 0- 0- 0
Programmer 2- 0- 0- 0- 0- 0- 0- 0- 0
Programmer 3- 0- 0- 0- 0- 0- 0- 0- 0
Programmer 4- 0- 0- 0- 0- 0- 0- 0- 0
Programmer 5- 0- 0- 0- 0- 0- 0- 0- 0
Programmer 6- 0- 0- 0- 0- 0- 0- 0- 0
Programmer 7- 0- 0- 0- 0- 0- 0- 0- 0
Research Scientist 1- 0- 0- 0- 0- 0- 0- 0- 0
Research Scientist 2- 0- 0- 0- 0- 0- 0- 0- 0
Research Scientist 3- 0- 0- 0- 0- 0- 0- 0- 0
Research Scientist 4- 0- 0- 0- 0- 0- 0- 0- 0
Research Scientist 5- 0- 0- 0- 0- 0- 0- 0- 0
Research Scientist 6- 0- 0- 0- 0- 0- 0- 0- 0
Research Scientist 7- 0- 0- 0- 0- 0- 0- 0- 0
Research Scientist 8- 0- 0- 0- 0- 0- 0- 0- 0
Research Scientist 9- 0- 0- 0- 0- 0- 0- 0- 0
Scientist 1- 0- 0- 0- 0- 0- 0- 0- 0
Scientist 2- 0- 0- 0- 0- 0- 0- 0- 0
Scientist 3- 0- 0- 0- 0- 0- 0- 0- 0
Scientist 4- 0- 0- 0- 0- 0- 0- 0- 0
Scientist 5- 0- 0- 0- 0- 0- 0- 0- 0
Scientist 6- 0- 0- 0- 0- 0- 0- 0- 0
Scientist 7- 0- 0- 0- 0- 0- 0- 0- 0
Scientist 8- 0- 0- 0- 0- 0- 0- 0- 0
Senior Scientist 5- 0- 0- 0- 0- 0- 0- 0- 0
Senior Scientist 6- 0- 0- 0- 0- 0- 0- 0- 0
Senior Scientist 8- 0- 0- 0- 0- 0- 0- 0- 0
Senior Scientist 9- 0- 0- 0- 0- 0- 0- 0- 0
Subject Matter Expert (SME) 5- 0- 0- 0- 0- 0- 0- 0- 0
Subject Matter Expert (SME) 6- 0- 0- 0- 0- 0- 0- 0- 0
Subject Matter Expert (SME) 7- 0- 0- 0- 0- 0- 0- 0- 0
Subject Matter Expert (SME) 8- 0- 0- 0- 0- 0- 0- 0- 0
Subject Matter Expert (SME) 9- 0- 0- 0- 0- 0- 0- 0- 0
Visualization Specialist 1- 0- 0- 0- 0- 0- 0- 0- 0
Visualization Specialist 3- 0- 0- 0- 0- 0- 0- 0- 0
Visualization Specialist 4- 0- 0- 0- 0- 0- 0- 0- 0
Visualization Specialist 5- 0- 0- 0- 0- 0- 0- 0- 0
Data Specialist 3- 0- 0- 0- 0- 0- 0- 0- 0
Data Specialist 4- 0- 0- 0- 0- 0- 0- 0- 0
Database Administrator 3- 0- 0- 0- 0- 0- 0- 0- 0
Operations Analyst 3- 0- 0- 0- 0- 0- 0- 0- 0
Scientific Analyst/Programmer 3- 0- 0- 0- 0- 0- 0- 0- 0
Scientific Analyst/Programmer 4- 0- 0- 0- 0- 0- 0- 0- 0
Scientific Analyst/Programmer 5- 0- 0- 0- 0- 0- 0- 0- 0
Software Developer 2- 0- 0- 0- 0- 0- 0- 0- 0
Software Developer 3- 0- 0- 0- 0- 0- 0- 0- 0
Software Developer 5- 0- 0- 0- 0- 0- 0- 0- 0
Software Engineer 4- 0- 0- 0- 0- 0- 0- 0- 0
Software Engineer 5- 0- 0- 0- 0- 0- 0- 0- 0
Software Tester 3- 0- 0- 0- 0- 0- 0- 0- 0
Systems Administrator 3- 0- 0- 0- 0- 0- 0- 0- 0
Systems Administrator 5- 0- 0- 0- 0- 0- 0- 0- 0
Technical Lead 4- 0- 0- 0- 0- 0- 0- 0- 0
Technical Supervisor 4- 0- 0- 0- 0- 0- 0- 0- 0
Configuration And Data Management Specialist 5- 0- 0- 0- 0- 0- 0- 0- 0
Subcontract Administrator 4- 0- 0- 0- 0- 0- 0- 0- 0
Task Project Coordinator 1- 0- 0- 0- 0- 0- 0- 0- 0
Task Project Coordinator 2- 0- 0- 0- 0- 0- 0- 0- 0
Task Project Coordinator 3- 0- 0- 0- 0- 0- 0- 0- 0
Task Project Coordinator 4- 0- 0- 0- 0- 0- 0- 0- 0
Task Project Coordinator 5- 0- 0- 0- 0- 0- 0- 0- 0
Technical Writer/Editor 4- 0- 0- 0- 0- 0- 0- 0- 0
Technical Writer/Editor 5- 0- 0- 0- 0- 0- 0- 0- 0
Field Campaign Specialist 3- 0- 0- 0- 0- 0- 0- 0- 0
Designer 5- 0- 0- 0- 0- 0- 0- 0- 0
Engineering Associate 1- 0- 0- 0- 0- 0- 0- 0- 0
Engineering Associate 3- 0- 0- 0- 0- 0- 0- 0- 0
Engineering Associate 4- 0- 0- 0- 0- 0- 0- 0- 0
Engineering Associate 5- 0- 0- 0- 0- 0- 0- 0- 0
Technician 1- 0- 0- 0- 0- 0- 0- 0- 0
Technician 2- 0- 0- 0- 0- 0- 0- 0- 0
Technician 3- 0- 0- 0- 0- 0- 0- 0- 0
Technician 4- 0- 0- 0- 0- 0- 0- 0- 0
Technician 5- 0- 0- 0- 0- 0- 0- 0- 0
Test Assistant 5- 0- 0- 0- 0- 0- 0- 0- 0
Test Conductor 3- 0- 0- 0- 0- 0- 0- 0- 0
Test Conductor 4- 0- 0- 0- 0- 0- 0- 0- 0
Test Conductor 5- 0- 0- 0- 0- 0- 0- 0- 0

Cost Form C - Indirect Rates

COST FORM C
Research Science and Engineering Services (RSES)
Proposed Indirect Rates

Offeror:

INDIRECT RATESAllocation Base
Indirect Rates (List)CFY 2023CFY 2024CFY 2025CFY 2026CFY 2027CFY 2028CFY 2029CFY 2030CY 1CY 2CY 3CY 4CY 5CY 6CY 7CY 8
Fringe Benefits
Overhead1
Overhead2
Material/Subcontract Handling
G&A

Facilities Capital Cost of Money

Fixed Fee
Award Fee
Escalation - Labor
Escalation - Other
Instructions
(1) Identify Contractor fiscal year rates (CFY).
(2) If contract year (CY) rates cross over CFY rates, show derivation.
(3) Lines may be added as necessary.
(4) CY indirect rates shall be used to develop the proposed indirect costs on Cost Forms A1 and A2.

Cost Form D1 - Sig SubK Rates

Cost Form D1
Research Science and Engineering Services (RSES)
Labor Rate Chart
INDIRECT RATESAllocation Base
Offeror:Indirect Rates (List)CY 1CY 2CY 3CY 4CY 5CY 6CY 7CY 8
SubK RATE INFORMATION - CONTRACT YEAR 1Fringe Benefits
Significant SubK #1Overhead1
Escalation Rate %Overhead2
Labor CategoriesBase RateLabor RateFringeOverhead1Overhead2G&ABurdened Labor RateFixed FeeBill RateG&A
Cloud Architect 5- 0- 0- 0
Computer Scientist 3- 0- 0- 0
Computer Scientist 4- 0- 0- 0
Computer Scientist 5- 0- 0- 0
Computer Scientist 6- 0- 0- 0Facilities Capital Cost of Money
Computer Scientist 8- 0- 0- 0
Computer Scientist 9- 0- 0- 0Fee
Engineer 1- 0- 0- 0
Engineer 2- 0- 0- 0Escalation - Labor
Engineer 3- 0- 0- 0
Engineer 4- 0- 0- 0
Engineer 5- 0- 0- 0
Engineer 6- 0- 0- 0Instructions:
Engineer 7- 0- 0- 0(1) Significant subcontractor to provide completed form to NASA.
Engineer 8- 0- 0- 0(2) Provide supporting information for Labor Rates and indirect rates
Engineer 9- 0- 0- 0(3) Redacted form with just Bill Rates may be provided to Prime Offeror.
Engineer Supervisor 4- 0- 0- 0(4) Add additional Cost Form D4 and on for additional Significant Subcontractor(s), adjust other Cost Forms, accordingly.
Engineer Supervisor 5- 0- 0- 0
Engineer Supervisor 6- 0- 0- 0
Engineer Supervisor 8- 0- 0- 0
Engineer Supervisor 9- 0- 0- 0
Software Engineer 3- 0- 0- 0
Software Engineer 4- 0- 0- 0
IT System Engineer 5- 0- 0- 0
Operational Aircraft Pilot 4- 0- 0- 0
Programmer 1- 0- 0- 0
Programmer 2- 0- 0- 0
Programmer 3- 0- 0- 0
Programmer 4- 0- 0- 0
Programmer 5- 0- 0- 0
Programmer 6- 0- 0- 0
Programmer 7- 0- 0- 0
Research Scientist 1- 0- 0- 0
Research Scientist 2- 0- 0- 0
Research Scientist 3- 0- 0- 0
Research Scientist 4- 0- 0- 0
Research Scientist 5- 0- 0- 0
Research Scientist 6- 0- 0- 0
Research Scientist 7- 0- 0- 0
Research Scientist 8- 0- 0- 0
Research Scientist 9- 0- 0- 0
Scientist 1- 0- 0- 0
Scientist 2- 0- 0- 0
Scientist 3- 0- 0- 0
Scientist 4- 0- 0- 0
Scientist 5- 0- 0- 0
Scientist 6- 0- 0- 0
Scientist 7- 0- 0- 0
Scientist 8- 0- 0- 0
Senior Scientist 5- 0- 0- 0
Senior Scientist 6- 0- 0- 0
Senior Scientist 8- 0- 0- 0
Senior Scientist 9- 0- 0- 0
Subject Matter Expert (SME) 5- 0- 0- 0
Subject Matter Expert (SME) 6- 0- 0- 0
Subject Matter Expert (SME) 7- 0- 0- 0
Subject Matter Expert (SME) 8- 0- 0- 0
Subject Matter Expert (SME) 9- 0- 0- 0
Visualization Specialist 1- 0- 0- 0
Visualization Specialist 3- 0- 0- 0
Visualization Specialist 4- 0- 0- 0
Visualization Specialist 5- 0- 0- 0
Data Specialist 3- 0- 0- 0
Data Specialist 4- 0- 0- 0
Database Administrator 3- 0- 0- 0
Operations Analyst 3- 0- 0- 0
Scientific Analyst/Programmer 3- 0- 0- 0
Scientific Analyst/Programmer 4- 0- 0- 0
Scientific Analyst/Programmer 5- 0- 0- 0
Software Developer 2- 0- 0- 0
Software Developer 3- 0- 0- 0
Software Developer 5- 0- 0- 0
Software Engineer 4- 0- 0- 0
Software Engineer 5- 0- 0- 0
Software Tester 3- 0- 0- 0
Systems Administrator 3- 0- 0- 0
Systems Administrator 5- 0- 0- 0
Technical Lead 4- 0- 0- 0
Technical Supervisor 4- 0- 0- 0
Configuration And Data Management Specialist 5- 0- 0- 0
Subcontract Administrator 4- 0- 0- 0
Task Project Coordinator 1- 0- 0- 0
Task Project Coordinator 2- 0- 0- 0
Task Project Coordinator 3- 0- 0- 0
Task Project Coordinator 4- 0- 0- 0
Task Project Coordinator 5- 0- 0- 0
Technical Writer/Editor 4- 0- 0- 0
Technical Writer/Editor 5- 0- 0- 0
Field Campaign Specialist 3- 0- 0- 0
Designer 5- 0- 0- 0
Engineering Associate 1- 0- 0- 0
Engineering Associate 3- 0- 0- 0
Engineering Associate 4- 0- 0- 0
Engineering Associate 5- 0- 0- 0
Technician 1- 0- 0- 0
Technician 2- 0- 0- 0
Technician 3- 0- 0- 0
Technician 4- 0- 0- 0
Technician 5- 0- 0- 0
Test Assistant 5- 0- 0- 0
Test Conductor 3- 0- 0- 0
Test Conductor 4- 0- 0- 0
Test Conductor 5- 0- 0- 0
SubK RATE INFORMATION - CONTRACT YEAR 2
Significant SubK #1
Escalation Rate %
Labor CategoriesLabor RateFringeOverhead1Overhead2G&ABurdened Labor RateFixed FeeBill Rate
Cloud Architect 5- 0- 0- 0
Computer Scientist 3- 0- 0- 0
Computer Scientist 4- 0- 0- 0
Computer Scientist 5- 0- 0- 0
Computer Scientist 6- 0- 0- 0
Computer Scientist 8- 0- 0- 0
Computer Scientist 9- 0- 0- 0
Engineer 1- 0- 0- 0
Engineer 2- 0- 0- 0
Engineer 3- 0- 0- 0
Engineer 4- 0- 0- 0
Engineer 5- 0- 0- 0
Engineer 6- 0- 0- 0
Engineer 7- 0- 0- 0
Engineer 8- 0- 0- 0
Engineer 9- 0- 0- 0
Engineer Supervisor 4- 0- 0- 0
Engineer Supervisor 5- 0- 0- 0
Engineer Supervisor 6- 0- 0- 0
Engineer Supervisor 8- 0- 0- 0
Engineer Supervisor 9- 0- 0- 0
Software Engineer 3- 0- 0- 0
Software Engineer 4- 0- 0- 0
IT System Engineer 5- 0- 0- 0
Operational Aircraft Pilot 4- 0- 0- 0
Programmer 1- 0- 0- 0
Programmer 2- 0- 0- 0
Programmer 3- 0- 0- 0
Programmer 4- 0- 0- 0
Programmer 5- 0- 0- 0
Programmer 6- 0- 0- 0
Programmer 7- 0- 0- 0
Research Scientist 1- 0- 0- 0
Research Scientist 2- 0- 0- 0
Research Scientist 3- 0- 0- 0
Research Scientist 4- 0- 0- 0
Research Scientist 5- 0- 0- 0
Research Scientist 6- 0- 0- 0
Research Scientist 7- 0- 0- 0
Research Scientist 8- 0- 0- 0
Research Scientist 9- 0- 0- 0
Scientist 1- 0- 0- 0
Scientist 2- 0- 0- 0
Scientist 3- 0- 0- 0
Scientist 4- 0- 0- 0
Scientist 5- 0- 0- 0
Scientist 6- 0- 0- 0
Scientist 7- 0- 0- 0
Scientist 8- 0- 0- 0
Senior Scientist 5- 0- 0- 0
Senior Scientist 6- 0- 0- 0
Senior Scientist 8- 0- 0- 0
Senior Scientist 9- 0- 0- 0
Subject Matter Expert (SME) 5- 0- 0- 0
Subject Matter Expert (SME) 6- 0- 0- 0
Subject Matter Expert (SME) 7- 0- 0- 0
Subject Matter Expert (SME) 8- 0- 0- 0
Subject Matter Expert (SME) 9- 0- 0- 0
Visualization Specialist 1- 0- 0- 0
Visualization Specialist 3- 0- 0- 0
Visualization Specialist 4- 0- 0- 0
Visualization Specialist 5- 0- 0- 0
Data Specialist 3- 0- 0- 0
Data Specialist 4- 0- 0- 0
Database Administrator 3- 0- 0- 0
Operations Analyst 3- 0- 0- 0
Scientific Analyst/Programmer 3- 0- 0- 0
Scientific Analyst/Programmer 4- 0- 0- 0
Scientific Analyst/Programmer 5- 0- 0- 0
Software Developer 2- 0- 0- 0
Software Developer 3- 0- 0- 0
Software Developer 5- 0- 0- 0
Software Engineer 4- 0- 0- 0
Software Engineer 5- 0- 0- 0
Software Tester 3- 0- 0- 0
Systems Administrator 3- 0- 0- 0
Systems Administrator 5- 0- 0- 0
Technical Lead 4- 0- 0- 0
Technical Supervisor 4- 0- 0- 0
Configuration And Data Management Specialist 5- 0- 0- 0
Subcontract Administrator 4- 0- 0- 0
Task Project Coordinator 1- 0- 0- 0
Task Project Coordinator 2- 0- 0- 0
Task Project Coordinator 3- 0- 0- 0
Task Project Coordinator 4- 0- 0- 0
Task Project Coordinator 5- 0- 0- 0
Technical Writer/Editor 4- 0- 0- 0
Technical Writer/Editor 5- 0- 0- 0
Field Campaign Specialist 3- 0- 0- 0
Designer 5- 0- 0- 0
Engineering Associate 1- 0- 0- 0
Engineering Associate 3- 0- 0- 0
Engineering Associate 4- 0- 0- 0
Engineering Associate 5- 0- 0- 0
Technician 1- 0- 0- 0
Technician 2- 0- 0- 0
Technician 3- 0- 0- 0
Technician 4- 0- 0- 0
Technician 5- 0- 0- 0
Test Assistant 5- 0- 0- 0
Test Conductor 3- 0- 0- 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .