80KSC020Q0002

Statement of Work

November 7, 2019

Contract SOW for Inficon to procure both material components and associated labor support

Center: NASA KSC

1 Background The Volatiles Investigating Polar Exploration Rover (VIPER) is being developed by NASA for flight on a Commercial Lunar Payload Services (CLPS) lander. VIPER carries a Mass Spectrometer observing lunar operations (MSolo) instrument with a drill to analyze volatiles given off by regolith, as well as a neutron spectrometer and near infrared spectrometer. MSolo utilizes a modified commercially available off-the-shelf (COTS) item approach, where NASA procures a commercial mass spectrometer from INFICON, as well as support, and modifies the hardware to operate in a lunar environment.

2 Objectives INFICON will support VIPER development and testing occurring at NASA. INFICON will provide instrumentation for VIPER mission, as well as technical support during modification of their mass spectrometer for space flight. This Statement of Work details specific tasks that INFICON shall perform either as hardware deliverables or technical support in the form of labor hours.

3 Tasks INFICON shall perform the following tasks associated with the MSolo instrument:

Tasks Details Deliverable Period of Performance

Task 1:

Telecons & meetings

Support meetings and telecons

Support meetings, telecons, and reviews as necessary

Jan 10, 2020- Jan 9, 2022

Task 2:

Hardware delivery for chamber

Deliver items in Table 1 for vacuum chamber (interchangeability required)

Hardware detailed in Table 1 by Feb 15, 2020

Task 3:

Experimental test setup and data analysis

Instrument expert support for experimental parameter evaluation to support validation and verification testing as well as data analysis.

Data/report Jan 10, 2020- Jan 9, 2022

Task 4:

Instrument calibration chamber

Installation and calibration of Transpector MPH RGA on chamber at Kennedy Space Center

Instrument setup parameters for RGA applications

Jan 10, 2020- Jan 9, 2022

Task 5:

Instrument optimization for analysis

Support during testing to optimize instrument settings (ionizer values, voltages, detector settings) for operation in vacuum chamber for mission applications

Mission specific instrument methods and setpoints

Jan 10, 2020- Jan 9, 2022

Task 6:

Firmware upgrade for board modifications

Updated firmware for changes required for modified boards

Firmware Jan 10, 2020- Jan 9, 2022

Task 7:

Electrometer calibration

Calibration parameters of electrometer assembly specific to each electrometer assembly

Calibration parameters reports

Jan 10, 2020- Jan 9, 2022

Task 8: Sensor calibration

Sensor calibration of integrated instruments for system optimization with KSC designed avionics cards

Report including instrument specific optimized operational parameters

Jan 10, 2020- Jan 9, 2022

Task 9:

Mechanical design consultation

Review mechanical designs and provide input on mechanical enclosure for instrument

Participate in review meetings

Jan 10, 2020- Jan 9, 2022

Task 10:

Additional Firmware Upgrades

Firmware upgrades/modifications

Firmware upgrades/ modifications as needed

Jan 10, 2020- Jan 9, 2022

Task 11:

Design Review meetings/travel for on-site support

4 trips for full development team plus 12 individual consultation trips

Jan 10, 2020- Jan 9, 2022

4 Deliverables

Table 1 – Hardware Deliverables, details hardware deliverables as noted in Task 2 above.

Additionally, the contractor shall supply Certificates of Conformance/Compliance for all hardware components delivered as part of this contract.

The contractor is responsible for ensuring that technical information concerning significant problems involving parts, materials, and unsafe conditions are exchanged, internal and external to NASA, using the GIDEP (Government-Industry Data Exchange Program). To support this activity, the Contractor supply chain shall:

a. Eliminate or mitigate any negative effects pertaining to identified usage and inform the Government of such actions to ensure GIDEP Notices adhere to close-loop reporting.

b. Generate applicable GIDEP Alerts whenever failed or nonconforming items are discovered.

c. Communicate information and status updates to the NASA KSC GIDEP Coordinator, applicable NASA organizations, and their subcontractors when GIDEP Notices affect their products provided for NASA’s projects and programs.

d. Impound suspect/counterfeit parts furnished under this agreement. Note: payment may be withheld pending the outcome of an investigation by the NASA Office of Inspector General (NOIG) and/or FBI.

TABLE 1: Hardware Materials

Hardware Delivery Date Qty BCG450 Triple Gauge, VGC503 controller and 3m gauge cables by Feb 15, 2020 1

BCG450 Triple Gauge and cable but w/o controller by Feb 15, 2020 1 Spare BCG450 sensor by Feb 15, 2020 2

Replacement Open Ion Source by Feb 15, 2020 5 Replacement XB Ion Source by Feb 15, 2020 6

Replacement Detector (ruggedized and conditioned) by Feb 15, 2020 2 Replacement RF boards (KSC configuration specific* with thin films removed) by Feb 15, 2020 6

Ruggedized XB MPH Residual Gas Analyzer, MPH100M (no gap pad) by Feb 15, 2020 4

XB MPH100M Sensor by Feb 15, 2020 6 Electrometer assembly (electrometer front end, electrometer interface board, integrated into brass assembly) by Feb 15, 2020 6

Transpector MPH100M open XB Ruggedized Transpector MPH with compact custom pumping system, calibration reference, ion gauge and atmospheric inlet.

by Feb 15, 2020 2

ULTEM feedthrough component with grounding clip by Feb 15, 2020 10 canned head system (getter assembly for no pump testing) by Feb 15, 2020 1

6 Government Points of Contact (POC)

Technical Representative: Janine Captain Email: Janine.E.Captain@nasa.gov Phone: (321) 867-6970

Contract Specialist: Rose Dougherty Email: Rose.A.Dougherty@nasa.gov Phone: 321-867-2304 mailto:Janine.E.Captain@nasa.gov mailto:Rose.A.Dougherty@nasa.gov

1 Background
2 Objectives
3 Tasks
4 Deliverables
Table 1 – Hardware Deliverables, details hardware deliverables as noted in Task 2 above. Additionally, the contract shall supply Certificates of Conformance/Compliance for all hardware components delivered as part of this contract.

File details come from the government source that posted it. Updated .