J-09.2_Schedule_Roadway_Mowing.pdf
PDF 18 KB Posted
- Solicitation number
- 80KSC018R0014
About this file
J-09-02 Schedule, Roadway Mowing
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
80KSC018R0014, Kennedy Space Center Grounds and Pest Contract II (KGPC II) Attachment J-09.2 Schedule, Roadway Mowing
Line
No. General Location Roadway Name Section Typical
Annual Road
Shoulder
Frequency Backslopes (all 2 times/yr) Acreage Note
1 Contractor's Rd Contractor's Rd. all 4 lane no median 6 Yes 12.3447 2 Fluids Servicing Area Fluids Servicing Rd all 2 lane 6 Yes 8.5629 3 Fluids Servicing Area Converter/Compressor Rd. all 2 lane 6 No 4.7398 4 Fluids Servicing Area Safety Rd. all 2 lane 6 No 2.4732 5 HMF G Ave SE all 2 lane 6 Yes 8.8694 6 HMF F Ave SE all 2 lane 6 Yes 3.1816 7 HMF 6th St. SE all 2 lane 6 Yes 3.4328 8 HMF 7th St. SE all 2 lane 6 Yes 1.3339 9 HMF 8th St. SE all 2 lane 6 Yes 0.4819 10 HMF 9th St. SE all 2 lane 6 Yes 2.7264 11 HMF 10th St. SE all 2 lane 6 Yes 3.1749 12 Industrial Area C Ave NE NASA Pkwy to L7-1557 2 lane 6 No 7.5884 13 Industrial Area 5 St. SE Kennedy Pkwy to C Ave SE 4 lane no median 6 Yes 4.4126 14 Industrial Area 5 St. SE C Ave SE to D Ave SE 2 lane 6 Yes 2.0528 15 Industrial Area 5 St. SE E Ave SE to G Ave SE 2 lane 6 Yes 14.5474 16 Industrial Area 4th St. SE all 2 lane 6 Yes 13.9480 17 Industrial Area 3rd St. SE all 2 lane 6 Yes 15.4229 18 Industrial Area 2nd St. SE A Ave SE to D Ave SE 2 lane 6 Yes 10.1585 19 Industrial Area 2nd St. SE E Ave SE to H Ave SE 2 lane 6 Yes 1.2906 20 Industrial Area 1st St. SE all 2 lane 6 Yes 9.3034 21 Industrial Area A Ave SE all 2 lane 6 Yes 7.6710 22 Industrial Area B Ave SE all 2 lane 6 Yes 9.4604 23 Industrial Area C Ave SE all 4 lane 6 Yes 7.6806 24 Industrial Area D Ave SE all 2 lane 6 Yes 9.1319 25 Industrial Area E Ave SE all 2 lane 6 Yes 20.6052 26 Industrial Area H Ave SE all 2 lane 6 Yes 2.3575 27 South KSC 22nd Street SE all fire break/access road 6 No 7.1019 28 Industrial Area 10th St SW all access road 6 No 6.9128
29 Industrial Area Ransom Rd
Kennedy Pkwy west to Space
Commerce Way 2 lane 6 No 2.0790
30 Kennedy Parkway Kennedy Parkway (North)
Wilson's Corner North to KSC
Boundary 2 lane 16 Yes 244.9624 *
31 Kennedy Parkway 57th St. NW all 2 lane 16 Yes 0.8643 *
32 Kennedy Parkway Kennedy Parkway (North)
Wilson's Corner south to
NASA Pkwy
4 lane w/ median (with some areas having additional through and turn lanes) 16 Yes 149.2635 *
33 Kennedy Parkway Kennedy Parkway (South)
NASA Pkwy to KSC South
Boundary
4 lane w/ median (with some areas having additional through and turn lanes) 16 Yes 80.9210 *
34 KSC East Samuel C. Phillips Pkwy
Patrol Rd. South to KSC South
Boundary 2 lane 16 No 38.7674 *
80KSC018R0014, Kennedy Space Center Grounds and Pest Contract II (KGPC II) Attachment J-09.2 Schedule, Roadway Mowing
No. General Location Roadway Name Section Typical
Annual Road
Shoulder
Frequency Backslopes (all 2 times/yr) Acreage Note
35 LC-39 Saturn Causeway
Transporter Rd. East to LC-
39A entrance 2 lane 16
Shoulder and backslopes on
South-side only 2.3921 *
36 LC-39 Saturn Causeway
Transporter Rd. West to
Kennedy Pkwy (North) 4 lane no median 6 No 27.6318
37 LC-39 Launcher Rd. all 2 lane 6
North and East shoulders only -no backslope 11.8794 38 LC-39 Transporter Rd. all 4 lane no median 6 No 1.4199 39 LC-39 LCC Rd. all 2 lane 6 No 0.1676 40 LC-39 Utility Rd. all 2 lane 6 No 0.9182 41 LC-39 Safehaven Rd. all 2 lane 6 No 0.4453 42 LC-39 VAB Rd. all 2 lane 6 No 0.7988 43 LC-39 Towway Kennedy Pkwy East to VAB 4 lane no median 6 No 1.8789
44 LC-39
Road from OPF#3 North to
RPSF all 2 lane 6 No 45 LC-39 Instrumentation Rd all 2 lane 6 No 3.6841 46 LC-39 Ordnance Rd all 2 lane 6 Yes 3.1189
47 NASA Parkway NASA Parkway West
KSC West Boundary (SR405) east to the west end of the drainage canals 4 lane w/ median 16 Yes 31.5678 *
48 NASA Parkway NASA Parkway West
West end of drainage canals to
Kennedy Parkway 5 lane w/ median 16 No 75.8958 *
49 NASA Parkway NASA Parkway East 5 lane w/ median 4 lane w/ median 16 Yes 40.9117 *
50 NASA Parkway NASA Parkway East H Ave to KSC East Boundary 2 lane 16 Yes 100.3062 *
51 Pad A Pad A By-pass Rd. all 2 lane 2 No 16.2810
52 Pad B Patrol Rd.
Beach Rd. to Samuel C.
Phillips Pkwy 2 lane 2
Mow South side of road only -
No backslopes either side 7.4485 53 Pad B Titusville Beach Rd. Patrol Rd to LC-39B 2 lane 2 Yes 8.2120 54 Pad B Pad B By-pass Rd. all 2 lane 2 No 8.4322
55 Pad B Pad B Rd. all 2 lane 2
East shoulders only - no backslopes either side 10.1302 56 Pad B Pad A Emergency Rd all 2 lane 2 No 4.0402 57 Q6 grid Banana River Dr. SE Hall Rd. to 42nd St. SE 2 lane 2 No 8.4134 58 Q6 grid 42 St. SE all 2 lane 2 No 0.8267 59 Schwartz Rd Schwartz Rd. West Kennedy Pkwy to G Ave NW 2 lane 2 No 23.2120 60 Schwartz Rd G Ave NW all 2 lane 2 No 3.6486
61 Schwartz Rd Banana River Dr. NE
K8-1404 south to Schwartz Rd.
East 2 lane 2 No 9.1633
62 Schwartz Rd Schwartz Rd. East
Kennedy Pkwy east to KSC
Landfill 2 lane 2 No 12.3139 63 Shiloh Golk Rd. all 2 lane 2 Yes 0.0532
80KSC018R0014, Kennedy Space Center Grounds and Pest Contract II (KGPC II) Attachment J-09.2 Schedule, Roadway Mowing
No. General Location Roadway Name Section Typical
Annual Road
Shoulder
Frequency Backslopes (all 2 times/yr) Acreage Note
72 Space Commerce Way Space Commerce Way all
2 lane, except for the ends where 4 lane w/ median 8 Yes 32.0198
73 SR402 Titusville Rd.
Beach Rd. West to KSC West
Boundary (Gate 4TT) 2 lane 8 Yes 25.7320 74 Static Test Rd Fire Training Rd. all 2 lane 4 No 1.9589 75 Static Test Rd 2 St. NE all 2 lane 4 No 1.4304 76 Static Test Rd Static Test Rd South of NASA Pkwy 2 lane 4 West-side only 9.6121 77 Static Test Rd Static Test Rd North of NASA Pkwy 2 lane 4 No 28.1433 78 STDN E Ave SW all 2 lane 4 No 3.4243 79 STDN 4th St. SW all 2 lane 4 No 1.4435 80 Tel-IV B Ave SW all 2 lane 2 Yes 24.4872 81 Tel-IV 28th St. SW all 2 lane 2 Yes 20.5802 82 Tel-IV Banana River Dr. SE 22nd St SE to 26th St SE 2 lane 2 No 2.8930
83 Tel-IV Banana River Dr. SE Tel-IV south to KARS I gate 2 lane 2
West shoulder only - no backslopes 2.6964 84 Wilson's Corner Beach Rd. Gate 6T West to Titusville Rd. 2 lane 8 Yes 43.9087
1,331.35
*Note: During the Base Year this area will be part of the Growth Regulator Pilot Ptoject. The government estimates that this area will only need to be mowed 3 to 5 times during the pilot project. In place of the remaining rows the contractor will mow other roadways as discussed in Attchement J-09.1 Section 2.8.
File details come from the government source that posted it.