STATEMENT OF WORK

MARSHALL SPACE FLIGHT CENTER (MSFC)

(a) Delivery: Delivery and acceptance of product will normally be made Monday through Friday, at 7 AM. 7 AM to 11 AM is acceptable on non-test days. However, under unusual circumstances, the Contractor agrees to deliver product 24 hours a day, 7 days a week, including holidays.

(b) Clearance Procedures: Deliveries are required to pass through the Gate 1 (Martin Road) security checkpoint. Drivers are issued temporary badges for admission onto MSFC by showing Driver’s License, DD250 or equivalent commercial document and Bill of Lading. Deliveries are then to proceed to Ready Storage, Bldg. 4661 for check-in and weigh-in.

(c) Seals: Integrity seal is required for LNG deliveries to MSFC, however, a serialized seal is not required.

(d) Quantification of product delivered: LNG shall be delivered to MSFC through pressure feed only.

Contractor shall use certified scales located on MSFC to determine quantity of product delivered.

(e) Notice for Delivery: Under normal circumstances, MSFC will provide two weeks’ notice for requests, and one week for cancellations or delays. Under unusual circumstances, orders placed within 72 hours shall be accepted.

(f) MSFC responsibility during delivery: MSFC personnel must be present to operate MSFC equipment during the delivery of LNG.

(g) Receiving storage: Current facility storage containers in use at MSFC include those which are listed below.

However, the Government reserves the right to add, withdraw, change, or substitute receiving containers at any time during the life of the contract.

Location Type Bldg Capacity (Gallons)

MAWP

(PSI)

Tanker Trailer

Off-loading Stations

MSFC Methane 4539-TS116 5K 5K 1

MSFC Methane 4583-TS115 2K 1.5K 1

MSFC Methane 4530-TS300 5K 40 1

(h) Fill Point Interface: The interface at the fill point for each tank is a 3” CGA fitting (LNG 30).