About this file

This document is a Questions and Answers (Q&A) compilation from Batch 2 of the Draft RFP (DRFP) for NASA Postdoctoral Program (NPP-3), RFP No. 80HQTR27R006. The Q&A addresses clarifications on contract requirements across multiple sections of the DRFP.

Key responses from the Government include the following notable changes to the Final RFP: the Significant Subcontractor threshold under GSFC 52.215-221 will increase from 15% to 20%, calculated against the FFP Program Management Services portion only; the Small Business Subcontracting Plan will be excluded from the Mission Suitability page count; and Authority to Operate (ATO) will become a gate criteria rather than a scored evaluation subfactor, eliminating the Information Technology Approach subfactor. The Annual Report in PWS Section G.3 and the draft Annual Performance Report in PWS Section H.10 are the same document, with reporting due dates added to Section G.3. References to a Mission Directorate Portal in Section B.5 will be removed, with alternative communication means provided instead. The recruitment language "from the U.S." will be removed from PWS Section C(4). For cost-reimbursement CPFF CLINs, Exhibit 1 will be updated to include G&A in the fee calculation. The contractor must manage current and future fellows for the longitudinal career-path study during the contract period only, not retroactively. All NPP fellows receive only NASA funding; non-NASA funding is not permitted. The successor contractor must provide its own program operation system and obtain a new ATO by the end of the 90-day transition phase, with the current system remaining operational during phase-in. The NPP system encompasses internal and external business systems requiring FISMA ATO and CSIRIA compliance. The NPP-3 contract will involve ITAR/EAR-controlled information, and the contractor is responsible for compliance. For joint ventures, all partners are combined to form a "JV Entity" for accounting system adequacy purposes. Offerors must demonstrate Department of State J-1 Exchange Visitor Program designation and may satisfy this through a subcontractor or joint venture member with documentation. Regarding small business participation, evaluation will assess whether proposed subcontracting goals are realistic, achievable, and reflect maximum practicable opportunities, with consideration given to the nature and constraints of the requirement and the proportion of meaningful, mission-relevant work assigned to small businesses.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA Postdoctoral Program (NPP-3) RFP No. 80HQTR27R006 DRFP Q&A's - Batch 2

DRFP Reference Questions Government Response

Section L, GSFC 52.215-221, Cost Volume Instructions (Significant Subcontractor definition, 15% threshold)

For the 15% Significant Subcontractor threshold in GSFC 52.215-221, please confirm whether “total estimated value” includes the Government-estimated Fellow costs under the cost-reimbursement CLINs or only proposed management and administrative services costs.

The "Total Estimated Value" referenced in GSFC 52.215-221 refers to 15% of the FFP Program Management Services portion of the work. This update will be reflected in the Final RFP. Please note, the percentage will also change from 15% to 20% in the Final RFP.

Attachment A, PWS Sections G.3-G.4 (Annual Report, program assessment and effectiveness);

Section H (Operational Performance Plan and Metrics)

Please provide the historical NPP datasets, established baselines, performance measures, and targets NASA has used to monitor program performance.

NPP datasets include PII data and cannot be shared publicly. Program performance will be monitored in accordance with PWS Section H and the Quality Assurance Surveillance Plan (QASP) provided as Enclosure 2.

Attachment A, PWS Section G.4(b) (5-, 10-, and 15-year longitudinal Fellows career-path study);

Section I.1(a) (transition of Fellow records and data)

For the 5-, 10- and 15-year longitudinal career-path study under PWS G.4, please clarify whether the contractor must include former Fellows who completed appointments before contract award, current Fellows, future Fellows, or all three, and what historical contact/data resources NASA will make available.

Contractor must manage current and future fellows, as indicated in the PWS. PWS G4b states "Contractor shall design and plan a continuing study of NPP Fellows’ career paths for 5, 10, 15 years. The contractor shall implement the first phase of this plan during the contract period of performance." This means it is for current contract period, not retroactive

Attachment A, PWS Sections G.3 (Annual Report);

Enclosure 2, QASP Section 6.3.1 (Annual Report and Annual Performance Report)

Please confirm whether the Annual Report in PWS G.3 and the draft Annual Performance Report in PWS H.10 are separate deliverables, and identify their respective submission schedules and required content if not already specified in Attachment E/CDRL or QASP.

The document referenced in H.10 is the same document in G.3, except the expectation in H.10 is that G.3's annual report is in draft form to provide the Government time to provide feedback. The RFP (Section C, Pg. 19-

20) details reporting schedule. Reporting due dates are added to Section G.3.

Attachment A, PWS Section H.1(f) (tracking third-year NASA support); Sections G.2(c) and G.2(e) (Fellow financial accounting and funding sources)

For NPP fellows receiving third-year support from sources other than the NPP contract, please clarify whether the contractor is responsible only for tracking funding status and outcomes or also for processing compensation, travel, and other costs. If the latter, what authorization and funding-transfer procedures apply?

NPP fellows receive only NASA funding; non-NASA funding is not allowed on this contract. As per the PWS, the contractor is responsible for supporting the fellows throughout their tenure, regardless of the type of NASA funding provided (project vs. SMD HQ Slot). See section G.2(e) of the PWS.

Attachment A, PWS Sections K.9-K.10 (SI ATO compliance and CSIRIA); Section I, NFS 1852.240- 76; Attachments E-1 (IT security) and E-2 (CSIRIA)

Please clarify the intended NASA ATO boundary for the NPP system, including whether it encompasses only the online portals or also external business and SI systems. In addition, what regulations, technical requirements, and authorization requirements apply to SI systems operating within or outside the NASA-authorized environment?

After careful consideration and evaluation by the Government, NASA has decided ATO will be a gate criteria and the RFP will be updated to reflect this change. However, below is our response to the original question.

The NPP system encompasses internal and external business systems.

Any IT System or SI processing NASA data on behalf of NASA must meet FISMA ATO and CSIRIA •The term "Federal information system” means an information system used or operated by an executive agency, by a contractor of an executive agency, or by another organization on behalf of an executive agency.

[40 USC 11331]

•Nonfederal organizations that collect or maintain information on behalf of a federal agency or that use or operate a system on behalf of an agency, must comply with the requirements in [FISMA], including the requirements in [FIPS 200] and the security controls in [SP 800-53] (See [44 USC 3554] (a)(1)(A)).

•On behalf of an agency occurs when a non-executive branch entity uses or operates an information system or maintains or collects information for the purpose of processing, storing, or transmitting Federal information, and those activities are not incidental to providing a service or product to the Government. [32 CFR 2002.4] •Non-executive branch entity is a person or organization established, operated, and controlled by individual(s) acting outside the scope of any official capacity as officers, employees, or agents of the executive branch of the Federal Government. Such entities may include: Elements of the legislative or judicial branches of the Federal Government; state, interstate, tribal, or local government elements; and private organizations. [32 CFR 2002.4]

• NASA data on external system incidental to providing a service or product to NASA is not a Federal Information system that requires FISMA ATO.

•Example: CAD drawings to build spacecraft or instrument
•However, if the incidental data is marked NASA Controlled Unclassified Information, it must be protected via

NIST 800-171r2, Protecting CUI in Nonfederal Systems and Orgs

Section L.2, Subfactor B.3 (Phase-In Plan);

Attachment A, PWS Section I (Phase-Out Activities);

Section I, NFS 1852.240-76; Attachment E-1, DRD 1 (system ownership and initial security plans)

Please clarify whether the incumbent NPP system may remain operational under its existing authorization during the 90-day phase-in, and confirm the required date for the successor contractor’s system to obtain NASA ATO relative to the contract effective date. In addition, please clarify whether the NPP online system is classified as Government-owned/contractor-managed or contractor-owned for cybersecurity and transition purposes, and distinguish NASA ownership of program data and transferable subscriptions from ownership of proprietary platform components.

The current NPP system will remain operational during the transition phase. The successor Contractor system must be fully operational by the end of the transition phase. The NPP-3 online system would be contractor-owned system. There is no expectation that vendor owned proprietary platform components will be transferred upon contract transition.

The current NPP systems has an active ATO. NASA will extend the ATO to coincide with the end of the transition phase.

Section B – Contract Pricing; Section L, GSFC 52.215- 221 – Cost Volume Instructions; Attachment B – Financial Management Reporting Requirements;

Pricing Model, Exhibits 1 and 2.

The Pricing Model appears to contain inconsistent treatment of fee on General and Administrative (G&A) expenses. Exhibit 1 calculates the fixed fee for Cost-Plus-Fixed-Fee (CPFF) Fellow-related costs without including G&A in the fee base, while Exhibit 2 permits profit to be calculated on fully burdened costs, including G&A. Please clarify whether fixed fee may be applied to G&A expenses under the CPFF CLINs or whether G&A is specifically excluded from the fee base. If excluded, please identify the applicable solicitation provision establishing this restriction.

Exhibit 1 will be updated in the Final RFP to include G&A in the fee calculation.

SF33 and TCs, L.4 Subfactor D – Small Business Participation (Volume II) (Pg. 95-99)

Subfactor D – Small Business Participation states that all offerors, except small businesses, must respond to (b) Small Business Subcontracting Plan. Can the Offeror provide the Small Business Subcontracting Plan as an appendix to Volume II Mission Suitability and be excluded from the 45-page limit for this volume?

The Final RFP will be updated to exclude the Small Business Subcontracting Plan from the Mission Suitability page count.

SF33 and TCs, GSFC 52.215-230 Past Performance Volume (b) Prior Customer Evaluations (Past Performance Questionnaires); Enclosure 1, Section

3. (Pg. 106, Enclosure 1, Pg. 2)

The Past Performance Volume Section (b) Prior Customer Evaluations (Past Performance Questionnaires) states the following: “The questionnaire respondent must be a representative from the technical customer and responsible Contracting Officer with direct knowledge of your firm’s performance.”

Please confirm that NASA is only expecting one completed PPQ response per contract and not a completed PPQ from both the CO and technical representative.

NASA's preference is that the CO and Technical Representative work together to provide one completed questionnaire.

Attachment A. Draft Performance Work Statement;

B.5; B.5.e.iv.; I.1.d (PWS Pg. 5-6, 14)

The current draft PWS does not list a Mission Directorate Portal in Section B.5, although it retains Mission Directorate-related activities, including Advisor funding requests to Host Organization Representatives under Section B.5.d.c and the provision of requested reports and documents to Mission Directorates under Section B.5.e.iv. The PWS also refers to Mission Directorate portals in Section I.1.d and materials being available to Mission Directorate points of contact through their NPP portals in Section G.6.

Please clarify whether the omission of a dedicated Mission Directorate Portal is intentional. If yes, please identify the portal or process through which Mission Directorate personnel will receive, access, review, or act upon NPP funding information, reports, documents, and program materials. If a dedicated Mission Directorate Portal remains required, will NASA revise Section B.5 to identify its required users, functionality, access controls, and information-exchange requirements?

The omission is intentional. The PWS is being updated in the Final RFP to remove references to the Mission Directorate portal (Sections B.5 and I.1.d) and to provide alternative means of vendor communication with the Mission Directorates (Section G.6).

Attachment A. Draft Performance Work Statement;

Section J (PWS Pg. 15)

Can NASA provide additional details on the duties of the Facility Security Officer (FSO)?

The Government is seeking a process or individual(s) who have responsibility in ensuring that incoming fellows can obtain proper credentials to access NASA facilities. The vendor will be required to address how this work be will be performed. Section J.1 has been updated.

Section L.4(b)(2)–(3), p. 97; Section M D.1, p. 110

Section L.4(b)(3) allows a goal of '0' when the offeror provides detailed rationale and describes its efforts to establish a goal. We request that NASA confirm that a 0% goal for a small business category, supported by that rationale, will be considered acceptable and will not by itself lower the offeror's Subfactor D score or the acceptability of the Subcontracting Plan?

For example if a bidder meets the total Small Business goal with meaningful involvement to a SDB (but not a WOSB, HUB, etc) and justifies the rationale for not partnering with other small business classifications in the mission suitability plan, will they receive a point deduction in Subfactor D.

Offerors are encouraged to propose the maximum small business subcontracting opportunities available. The acceptability of the proposed plan is based on compliance with 52.219-9. See Section M, Subfactor D.

PWS §C, p. 7; §G.3(b), p. 12

The PWS asks the contractor to recruit well-qualified applicants 'from the U.S.' while the annual report tracks U.S./LPR vs. non-U.S. Fellows and the program requires J-1 sponsorship. Please clarify whether 'from the U.S.' limits recruitment to U.S. citizens and LPRs, refers to applicants currently in the U.S., or describes where outreach occurs, and whether any eligibility change from NPP-2 is intended.

From the US' in Section C(4) will be removed from the PWS in the Final RFP.

PWS §B.2–B.3, p. 4; §K.9, p. 17

We request that NASA confirm that the new contractor may process NASA information during phase-in under an interim authorization or NASA-approved security controls, and that a full ATO is required only before operational go-live. Please also identify the expected authorization boundary, baseline, and assessment and approval milestones during phase-in.

After careful consideration and evaluation by the Government, NASA has decided ATO will be a gate criteria and the final RFP will reflect this change. However, below is our response to the original question.

NASA does provide Time-bound ATOs during development, then transitions to a full ATO before operational go-live.

The authorization boundary should include devices processing NASA data, current NIST 800-53 controls in place, or compensating controls, and risk assessment during the development phase. Approval will be required in the NASA system security plan repository RISCS. During development phase, this can just be supporting documentation and not full control set within the system.

PWS §B(3), p. 4; §L.1(a), p. 17

The PWS requires full functionality in both dual-stack and IPv6-only environments per the NIST USGv6 program. We request that NASA confirm that offerors may meet this requirement through a documented IPv6 transition plan with a target date after go-live, and that NASA's waiver process is available for commercial SaaS components that are not yet IPv6-only capable.

Offerors may meet this requirement with a documented IPv6 transition plan. The plan would be tracked with a Plan of Action and Milestones against the appropriate NIST 800-53 security controls with an approved completion date. Commercial SaaS components that are not yet IPv6 capable shall have a Risk Based Decision submitted documenting compensating controls.

Section L.3 (Information Technology Approach;

proposal instructions omitted); Section M, Subfactor C, C.1-C.2+A2:C14

Section M refers to Section L.3, Subfactor C, including C.1 and C.2, but corresponding proposal instructions are not included in the draft. Please provide the complete Section L.3 requirements for the Information Technology Approach.

After careful consideration and evaluation by the Government, NASA has decided to make ATO a gate criteria, thus eliminating Subfactor C, IT Approach from the RFP. Subfactor C now addresses Small Business Participation.

Attachment E-1 – Security Requirements for Unclassified IT Resources (applicable security assessment and authorization requirements)

Please provide the most recent ITS-HBK-AASTEP handbooks referenced in the solicitation to prospective offerors before proposals are due. The most recent publicly available version identified by the team is from 2024.

The ITS-BHK-AASTEP handbooks will be available to the vendor upon contract award as stated in PWS Section M.

Attachment E-1, DRD 1 (Security Requirements for Unclassified IT Resources); Section I, NFS 1852.240- 76 (Security Requirements for Unclassified IT Resources); Attachment A, PWS Section I.1 (transfer of NPP data and system materials)

What interconnection documentation is required for interfaces between the NPP portals and external systems?

The interconnection documentation will be available to the vendor upon contract award as stated in PWS Section M.

Reference: Section L.4, pp. 96–98; Section M, Subfactor D.1, pp. 109–112; Section M.1(b)

The NPP-3 solicitation establishes substantially different proposal submission and evaluation requirements for Small Business (SB) and Other Than Small (OTS) offerors under Subfactor D, Small Business Participation. Specifically, SB prime offerors automatically receive the full 100 points allocated to this subfactor without submitting a Small Business Utilization approach or Small Business Subcontracting Plan, whereas OTS offerors must prepare and submit both documents and are subject to a detailed evaluation of their proposed subcontracting commitments.

Under the current evaluation structure, an SB prime receives the maximum 100 points without demonstrating any subcontracting commitments, while an OTS prime must incur additional proposal preparation costs, develop subcontracting arrangements within a highly constrained scope of work, and remain subject to a potential scoring disadvantage despite proposing an equally effective or superior technical and management solution.

Given these circumstances, will NASA consider amending Section M, Subfactor D, to award all otherwise eligible and responsive offerors the full 100 points allocated to Small Business Participation, regardless of business size, while retaining the subfactor within the Mission Suitability evaluation framework?

This is being competed as a Full & Open Competition subject to the applicable RFO and NASA FAR Supplement provisions and clauses. At this time, there will not be an amendment to Section M in this regard. Points will not be assigned until proposals are evaluated.

GSFC 52.215-203(8), p. 91.

We request clarification regarding the scope of the required disclosure of an offeror's intent to use Super Intelligence (SI).

Specifically, is the disclosure intended to address SI capabilities proposed for use in performing NPP-3 program operations, rather than commercially available productivity applications or SI-enabled features embedded within standard enterprise software, such as office suites, email platforms, or search tools?

Please confirm whether routine internal productivity tools fall outside the intended disclosure requirement.

In PWS Section L.4(a), there are SI reporting requirements that are effective over the contract lifetime. The Government does not provide a minimum to the required disclosures. As such, it would be better for potential offerors to over disclose the types of SI tools regardless of function, than not disclose.

Section L.4(a)–(b), pp. 96–99; Section M, Subfactor D, pp. 109–112.

Given the NPP-3 requirement's primary focus on fellowship program administration and the substantial proportion of Total Contract Value attributable to Fellow-related costs, additional guidance regarding the assessment of small business participation would be helpful.

When evaluating other-than-small offerors under Subfactor D, how will NASA account for the subcontracting opportunities realistically available within the program's staffing and operational structure?

In particular, will NASA consider the proportion of meaningful, mission-relevant work assigned to small businesses, supported by clearly defined deliverables and documented commitments, when the overall participation percentage is necessarily constrained by the nature of the requirement?

NASA will evaluate the offeror's proposed subcontracting goals (overall subcontracting goals and individual subcontracting goals by small business category for each period, including base and any option periods, as well as the cumulative Total Contract Value) ensuring that they are realistic, achievable and reflect a commitment to providing maximum practicable opportunities for small business and socio-economic concerns.

Evaluation will consider as applicable, the extent to which proposed small business subcontracting goals are supported by clear, evidentiary rationale. In addition to the goals, utilization as outlined in section M will also be evaluated.

The prior solicitation (80HQTR20R0013, Section M.2(b)(2)) required evidence of Department of State J-1 Exchange Visitor Program designation with the proposal. Will this requirement carry forward? If so, may an offeror satisfy it through a joint venture member or a subcontractor that holds the designation, and what documentation would NASA expect?

Yes, this requirement will carry forward and the Offerors will need to demonstrate evidence in their proposal.

Offerors would need to demonstrate the program designation from Department of State for their subcontractors. While this requirement may be satisfied by a joint venture member or subcontractor, evidence from the State Department of the J-1 Visa Processing approval must still be provided, along with a clear plan of how the prime and subcontractor/joint venture member will be interfacing to successfully meet this criteria in Subfactor L - A.1.

For a cost-reimbursement award to a joint venture, will NASA accept an adequate accounting system determination held by one or more joint venture members? If so, what should the proposal include to support it?

In accordance with DRFP Clause 52.215-221(a), "An important prerequisite for the award of the contract is that Prime Offerors or Joint Venture (JV) Entities must have an accounting system that has been determined adequate by the cognizant administrative office for segregating, accumulating, and allocating costs specifically attributed to the contract or order during contract performance, including incurred-cost accumulation and reporting, prior to contract award. If an Offeror is relying on the accounting system adequacy of a Joint Venture team member, partner, sister company, or any other affiliated company’s accounting system, they must specifically assert (in the submitted Offer Volume) such an intended reliance for the performance of the contract and must demonstrate a convincing basis for using that system as a source for determining their own adequacy. All JV partners in a JV are combined to form a "JV Entity".

Will the current NPP application, peer review, and Fellow portal systems and their data be provided to the successor contractor as government-furnished property or information, or will offerors be expected to provide and host their own systems? Is the current system hosted in a cloud environment?

Offerors are expected to provide their own program operation system. See section B.1 in the PWS.

Do the current systems operate under a NASA Authority to Operate (ATO)?

If so, does NASA expect the ATO to transfer to the successor contractor, or will a new ATO be required? What FIPS 199 security categorization applies?

After careful consideration and evaluation by the Government, NASA has decided ATO will be a gate criteria and will be reflected in the RFP. However, below is our response to the original question.

The ATO cannot be transferred. A new ATO will be required. The current FIPS 199 security categorization that applies is moderate.

Does NASA anticipate that NPP-3 work will involve information controlled under ITAR or EAR? If so, can NASA describe the expected scope?

NASA does expect NPP-3 to involve ITAR/EAR; see Sec. D.12 of the PWS. If/when ITAR/EAR related information arises during contract performance, in accordance with the PWS, the contractor is responsible for ITAR/EAR compliance for reviews and materials it will manage for NPP-3. For more information on NASA's export control program, please refer to https://www.nasa.gov/oiir/export-control/