This document is a Questions and Answers batch from the NASA Postdoctoral Program (NPP-3) Draft RFP (RFP No. 80HQTR27R006). The Q&A addresses clarifications on proposal preparation requirements, contract structure, and evaluation criteria.

Key clarifications include: the Phase-In Plan submission requires five pages separate from the 45-page limit for Mission Suitability Volume; Volume III requires both a consolidated searchable PDF containing completed exhibits and a separate editable Excel workbook with formulas; the Total Compensation Plan is not required as part of proposal submissions, with PWS language to be updated accordingly; and the contract structure consists of a 12-month base period followed by four 12-month option periods (the DRFP Cover Letter will be corrected to reflect this). Regarding subcontracting, offerors may propose subcontractors for administrative and other support tasks subject to solicitation requirements and Revolutionary FAR Overhaul (RFO) provisions. No scenario will be included in the final RFP, and no industry day is currently planned. Interested vendors should reference sam.gov for the vendors list. Regarding past performance evaluation, NASA declined to lower the minimum average annual incurred cost/fee threshold of $7 million for prime contractor references, maintaining this requirement despite concerns that Fellow-related costs may not reflect actual program management effort performed.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA Postdoctoral Program (NPP-3) RFP No. 80HQTR27R006 DRFP Q&A's - Batch 1

DRFP Reference Questions Government Response

General

For the NPP-3 draft solicitation, is there an interested-vendor list or planned industry exchange where a small business can identify prospective primes seeking support with defined reconciliation and reporting tasks? Please also confirm whether any draft provision restricts subcontracting those administrative tasks.

The interested vendors list is provided on sam.gov. An industry day is not currently planned. Offerors may propose the use of subcontractors in support of contract performance, subject to the requirements and conditions established in the solicitation and applicable Revolutionary FAR Overhaul (RFO) provisions and clauses. See RFO 52.244-2, RFO 52.244-5 and RFP M.1.1 (a) for relative information. These references are not exhaustive and the offeror is encourgaged to review the RFP in its entirety.

This response does not waive or modify any existing solicitation requirement.

General

The previous solicitation included a Scenario for interested vendors to respond to as part of the Mission Suitability Volume. The draft RFP does not include a Scenario. Will NASA include a Scenario with the Final RFP? If so, will additional pages be allocated for the Scenario?

No. NASA will not include a scenario with the Final RFP.

NPP-3 SF33 and TCs, GSFC 52.215-201 Proposal Preparation – Proposal Content and Page Limitations (b)(1) (Pg. 86-87)

The Mission Suitability Volume shows 45 pages (total) under the Page Limitations column in the table. The Phase-In Plan shows 5 pages under Page Limitations in the table. The previous solicitation excluded the Phase-In Plan in the page count. Would NASA consider the same requirement for NPP-3?

The page count for the Phase-In Plan remains (5) pages, which is separate from the (45) page limitation for Mission Suitability.

Attachment A. Draft Performance Work Statement; Section F(4) (PWS Pg. 9)

Section F - Supporting Fellows During Their Tenure (Hybrid) references a Total Compensation Plan. Is a Total Compensation Plan required as an appendix to Volume II Mission Suitability or in another volume?

The PWS will be updated in the Final RFP to remove any language regarding Total Compensation Plan, which is not required.

GSFC 52.215-201(b)(1), pp. 87–88; Section L.2 B.3, p. 94

The page-limit table lists the Phase-In Plan with its own five-page limit, on a separate line from the 45-page limit for Volume II – Mission Suitability. We request that NASA confirm the Phase-In Plan is in addition to the 45 pages.

The (5) Page Limit for the Phase-In Plan is in addition to the (45) Page Limit for Mission Suitability.

GSFC 52.215-201(a)(3), p. 86 Please confirm whether Volume III requires both one consolidated searchable PDF containing the completed exhibits and a separate editable Excel workbook with formulas.

Correct. Volume III requires both. Offerors shall submit one consolidated searchable PDF containing the completed exhibits, AND a separate editable Excel workbook with all formulas in accordance with 52.215- 201(a)(3).

DRFP Cover Letter, p. 1; Section B, pp. 12–14.

We noted a discrepancy between the contract duration described in the DRFP Cover Letter and the schedule presented in Section B.

The Cover Letter identifies four one-month option periods, whereas Section B reflects four 12-month option periods.

Would NASA please confirm that the intended contract structure consists of a 12-month base period followed by four 12-month option periods and revise the Cover Letter accordingly?

The Draft RFP Cover Letter will be updated in the Final RFP to reflect the correct period of performance, which is 12 month base period and four (4) 12 month option periods.

GSFC 52.215-330, Past Performance Evaluation Factor (Services), pp. 116–117.

The Draft RFP establishes a minimum average annual incurred cost/fee threshold of $7 million for prime contractor past performance references to be considered minimally relevant.

Given the substantial proportion of NPP-3 contract value associated with Fellow-related costs, which may not directly reflect the level of program management effort performed by the contractor, would NASA consider reducing the $7 million threshold?

A lower threshold could broaden competition while allowing the Government to evaluate relevant experience based on the nature, complexity, and scope of the services actually performed.

At this time, the threshold will not be lowered.