80H Repair Plans Drawings.pdf

PDF 5 MB Posted

Attached to
Y1DZ--512-519 | 80H BASEMENT STRUCTURAL REPAIRS (MINOR CONSTRUCTION) (VA-19-00048593)
Solicitation number
36C24521R0005
Issued by

View the file

Other files

File Type Posted
36C24521R0005.docx DOCX document
80H Specifications.pdf PDF
80H BID FORM.pdf PDF
Tiered Solicitation Notice.pdf PDF
SCOPE OF WORK.pdf PDF
36C24521R0005.pdf PDF
Request for Information Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURAL REPAIRS AT BUILDING 80H

MARYLAND HEALTH CARE SYSTEM - PERRY POINT VA MEDICAL CENTER

PERRY POINT, MD

LOCATION MAP

NOT TO SCALE

DRAWING LIST

PROJECT SCHEDULING

VA

M

H

CS

P

ER

RY

P

OI

N

T

BU

IL

DI

N G

H

PE

RR

Y

PO

IN

T, M

AR

YL

AN

D

CO

N

CR

ET

E

RE

PA

IR

S

AutoCAD SHX Text

COOLING

AutoCAD SHX Text

TOWER

AutoCAD SHX Text 80H

AutoCAD SHX Text 19H

AutoCAD SHX Text

SEVENTH STREET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AVENUE D

AutoCAD SHX Text

BOILER HOUSE ROAD

AutoCAD SHX Text PROJECT No. 512-519

AutoCAD SHX Text

DEPARTMENT OF VETERANS AFFAIRS

AutoCAD SHX Text TS TITLE SHEET TITLE SHEET S101 FIRST FLOOR WEST CONCRETE REPAIR PLAN FIRST FLOOR WEST CONCRETE REPAIR PLAN S102 FIRST FLOOR EAST CONCRETE REPAIR PLAN FIRST FLOOR EAST CONCRETE REPAIR PLAN S201 TYPICAL CONCRETE REPAIR DETAILS AND TYPICAL CONCRETE REPAIR DETAILS AND GENERAL NOTES S202 TYPICAL CONCRETE REPAIR DETAILSTYPICAL CONCRETE REPAIR DETAILS

AutoCAD SHX Text THIS PROJECT HAS RESTRICTED WORK HOURS THAT WILL REQUIRE DEMOLITION AND OTHER HEAVY NOISE/VIBRATION GENERATING ACTIVITIES TO BE COMPLETED AFTER-HOURS AND/OR UTILIZE WEEKEND WORK TO AVOID DISRUPTION OF DAILY WEEKDAY MEDICAL CENTER OPERATIONS. FOR BIDDING PURPOSES, HOURS OF MEDICAL CENTER OPERATION SHALL BE MONDAY-FRIDAY 7:30AM-4PM. ACTUAL WORK HOURS SHALL BE DETERMINED AFTER AWARD AND SUBMISSION OF SCHEDULE. CONTRACTOR SHALL ACCOUNT FOR ALL OFF-HOURS WORK REQUIRED IN SCHEDULE AND BID PRICING. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR WORK HOUR MODIFICATION AFTER AWARD OF CONTRACT.

AutoCAD SHX Text

TS

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text 3/16" = 1'-0"

AutoCAD SHX Text 11141

AutoCAD SHX Text Sheet No.:

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text Scale:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text Revisions

AutoCAD SHX Text Date

AutoCAD SHX Text No.

AutoCAD SHX Text

OWNER:

AutoCAD SHX Text

PROJECT:

AutoCAD SHX Text Approved

AutoCAD SHX Text Checked

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text

SEAL:

AutoCAD SHX Text

FEBRUARY 14, 2020

512-519_StructuralRepairs_TITLE PAGE-COVER PAGE.pdf
Sheets and Views
COVER PAGE

File details come from the government source that posted it. Updated .