NNG04EB99C_MMS_JOFOC _FINAL_mdc.pdf
PDF 195 KB Posted
- Solicitation number
- 80GSFC928487R
About this file
This document is a Justification for Other Than Full and Open Competition (JOFOC) prepared by NASA's Goddard Space Flight Center for a contract extension with Southwest Research Institute (SwRI).
NASA seeks to extend contract NNG04EB99C with SwRI for one year (October 1, 2026 through September 30, 2027) to continue the Magnetospheric Multiscale (MMS) Science Investigation extended mission. The extension covers instrument operations, data analysis and archiving, and scientific analysis. The estimated total cost-plus fixed fee is $10.76 million. SwRI manages the science payload for all four MMS spacecraft, including Central Instrument Data Processors (CIDP), Hot Plasma Composition Analyzer (HPCA) instruments with 64 Fast Plasma Instrument (FPI) spectrometers, and 8 Active Spacecraft Potential Control (ASPOC) instruments. Partner institutions include the University of New Hampshire (FIELDS instrumentation), Johns Hopkins University Applied Physics Laboratory (FEEPS and EIS instruments), and the University of Colorado Laboratory for Atmospheric and Space Physics (science operations and data processing). The justification cites 10 U.S.C. 3204(a)(1) as the statutory authority, asserting SwRI is the only qualified source. SwRI was competitively selected in May 2005 under Announcement of Opportunity AO-02-OSS-03 and has operated the mission since launch in March 2015. The JOFOC emphasizes that successful transition to another organization would require six months to develop local operating procedures, minimum six months for engineer training, and approximately 1.5 years to replicate the Science Operations Center's specialized software systems. A SAM.gov synopsis was published July 16, 2026, closing July 30, 2026, with zero interested parties responding. The Contracting Officer will evaluate the contractor's proposal to ensure fair and reasonable pricing prior to contract execution.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev.:4/2026
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Goddard Space Flight Center (GSFC)
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
(JOFOC)
For Extension of Magnetospheric Multiscale (MMS) Science Investigation
Extended Mission, Contract NNG04EB99C
1. Federal Acquisition Regulation (FAR) 6.104-1(a)(1) – Identification of the agency and the contracting activity, and specific identification of the document as a “Justification for other than full and open competition.”
This document is a justification for other than full and open competition prepared by
National Aeronautics and Space Administration (NASA) Goddard Space Flight Center
(GSFC).
The procuring agency is NASA, and the contracting activity is Goddard Space Flight Center.
2. FAR 6.104-1(a)(2) – The nature and/or description of the action being approved:
This justification provides the rationale for contracting by other than full and open competition to award a one (1) year extension to contract number NNG04EB99C with
Southwest Research Institute (SwRI) for extended mission instrument operations, data analysis/archiving, and scientific analysis under the Magnetospheric Multiscale (MMS)
Science Investigation contract. The period of performance for the contract extension will be from 10/1/2026 through 9/30/27.
The NASA HQ Program Executive for Operating Missions has released the proposal for the
2026 Heliophysics Senior Review which is expected to be reviewed in August 2026. This contract will be extended and implemented after the extended mission request has been reviewed by HQs.
3. FAR 6.104-1(a)(3) – A description of the supplies or services required, to meet the
Agency’s needs (including the estimated value):
The contract extension is for the continuation of MMS extended mission instrument operations, data analysis/archiving, and scientific analysis.
SwRI is currently managing the science payload for MMS, including all subcontracting and management functions, management of foreign partners and agreements, science operations planning, the maintenance, health and safety of the four onboard Central Instrument Data
Processors (CIDP), and the maintenance, health and safety, command planning, calibrations, data processing, and 2 data quality maintenance of the four Hot Plasma Composition
Analyzer (HPCA) instruments, and providing the system engineering services for the science payload. As part of the continued investigation, SwRI plans the activities for the Theory and
Modeling Team and for the maintenance, health and safety, command planning, calibrations, data processing, and data quality maintenance for the 64 Fast Plasma Instrument (FPI) spectrometers. Through a partnership with the Austrian Academy of Science, SwRI plans activities for maintenance, health and safety, command planning, calibrations, data processing, and data quality maintenance for the 8 Active Spacecraft Potential Control
(ASPOC) instruments. SwRI also leads the scientific analysis and services of a wide range of science investigators across the U.S.
As part of the SWRI investigation team, the University of New Hampshire performs maintenance, health and safety, command planning, calibrations, data processing, and data quality support for the FIELDS instrumentation, including the electric field probes, magnetometers, search coil magnetometers and wave receivers, and Electron Drift
Instrument (EDI) sensors. The Johns Hopkins University Applied Physics Laboratory performs operations, maintenance, calibrations, data processing, and data quality support for the Fly's Eye Energetic Particle Spectrometer (FEEPS) and Energetic Ion Spectrometer (EIS) instruments. The University of Colorado Laboratory for Atmospheric and Space Physics
(LASP) performs instrument and science operations planning, scheduling, engineering review, burst data selection, and data processing, dissemination, and archiving through the
MMS Science Operations Center and Science Data Center.
The estimated total cost-plus fixed fee for the 1-year contract extension is $10.76M.
4. FAR 6.104-1(a)(4) – An identification of the statutory authority permitting other than full and open competition:
The statutory authority permitting other than full and open competition is 10 U.S.C.
3204(a)(1), as implemented by FAR 6.103-1, only one responsible source and no other supplies or services will satisfy agency requirements.
5. FAR 6.104-1(a)(5) – A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited:
The rationale supporting the use of 10 U.S.C. 3204(a)(1) is that SwRI, originally selected through an Announcement of Opportunity (AO) and later approved for continued operations under the agency’s Heliophysics Senior Review process, is the only organization currently qualified to perform the subject requirement as described below.
SwRI was competitively selected in May 2005, under the AO for MMS (AO-02-OSS-03), for science payload development, flight operations, and mission scientific analysis. The AO provided for the mission formulation, development, flight, and closeout phases. NASA
Science Mission Directorate (SMD) invited the GSFC Project Scientist (PS) and the MMS
Science Principal Investigator (PI) from SwRI, to propose to the 2026 Heliophysics Senior
Reviews. For the Senior Review, based on the proposal and the results of the Senior Review
Panel Reports, NASA SMD will notify the GSFC PS and SwRI PI when MMS is approved to continue as an extended mission. This Senior Review approval for an extension to the
MMS investigation is expected in August 2026.
The SwRI MMS investigation team have performed the MMS flight science operations and data analysis/archive functions since mission operations began in September 2015. They developed the original science operations concept, designed and built the science payload consisting of more than 125 instrument detectors/components distributed across the four-spacecraft constellation, and developed the associated payload operations software, support tools, operational procedures, and data processing workflows. Over more than a decade of successful mission operations, the team has accumulated extensive mission-specific knowledge required to safely operate the instrument suite, calibrate and interpret complex science measurements, and maximize scientific return. While the Government owns or has appropriate rights to many mission assets, successfully transitioning these highly specialized science operations to another organization would require substantial knowledge transfer, operational validation, personnel training, and certification. Such a transition would introduce significant schedule and mission risk and would likely reduce the continuity, quality, and efficiency of science operations.
SwRI managed the design, fabrication, calibration, testing, and integration of all 125+ MMS instrument boxes on the four MMS spacecraft, including the testing at the spacecraft level after delivery to GSFC. SwRI has successfully carried out the science operations and exceeded the science data analysis expectations for the instruments since their launch in
March 2015. The work is performed by several Instrument Team Facilities (ITFs) and the
Science Operations Center (SOC). The SwRI investigation team are unique in their knowledge of the MMS instrument payload, including the commanding, in-flight calibration procedures, and the interpretation of the data. This is especially true for discerning what is true scientific signal rather than instrumental “noise”, the knowledge of which is unique to each of these custom-made detectors. While some of the detectors are similar to those flown on previous missions (e.g., MAG and EDP), others are substantially advanced from those flown previously (e.g., HPCA and FPI), and at least two detectors (EDI and ASPOC) have never been built by anyone other than the SwRI team. NASA estimates it would require approximately six months to develop the local operating procedures (LOP) to transfer the
ITF engineering capabilities to other sources and a minimum of six months for training replacement engineers. There are a limited number of satellite operation facilities in the U.S.
with equipment and secure networks to directly interface with the GSFC Mission Operations
Center and none with identical or directly compatible instrument commanding and data processing/archive software as the MMS SOC. While there are many underlying similarities, space flight monitoring and commanding systems are unique to each operations center. For example, the current Science Operations Center required three years to develop the current
MMS instrument monitoring, commanding systems, and data processing pipeline and it is reasonable to assume that at least half that time would be required to duplicate, test, and validate these capabilities utilizing another facility’s flight operations equipment/software/protocols after all NASA-funded design materials were transferred.
GSFC would need to assume responsibility for all instrument and science operations during this transfer, which represents a duplication of effort and would increase the cost of the mission by an equivalent amount of funding. Information Technology is estimated at approximately 15-20% of the support software at the ITFs and SOC and could be designated as proprietary and would need to be re-developed.
The SwRI Principal Investigator (PI), Deputy PI, and Co-Investigators (Co-I) are leading experts in the field of magnetospheric and space plasma physics. Only SwRI and its Lead
Co-Investigators possess the scientific expertise and detailed knowledge of the MMS instrumentation and science operations to carry out the determination of regions of interest and detailed operations in a manner that the scientific operations can be merged with the flight operations to maintain the scientific return of the mission. Several instruments (e.g., ASPOC and EDI) have been built by team institutions and there are no other known sources with the knowledge to operate them safely. Training replacement PhD scientists in these specialized labor skills would require between 1 and 5 years, depending on their base level of the specialized plasma physics expertise required. This would substantially delay the scientific progress of the mission.
The MMS Science payload is a state-of-the-art field and particles science payload comprised of many individual sensors on each of the four identical MMS spacecraft. It advances the prior art by a factor of up to 100 through use of multiple linked sensors to view the entire sky without waiting for the spacecraft to spin. The entire mission science payload was conceived, planned, and managed by SwRI, including unique processes and software for:
a. Managing instrument modes and operations across the large number of sensors and spacecraft.
b. Managing the collected data to identify and select high resolution segments for downlink.
c. Processing raw data for scientist manipulation, display, and analysis.
d. Maintaining transparent documented access to the data for both team members and the general research community of guest investigators.
This effort requires detailed understanding of the numerous instruments and all related software. No other organization was involved with these activities on an in-depth level, and no other organization on than SwRI and its team currently has the knowledge and experience to fulfil the requirement with the level of return required for this mission.
6. FAR 6.104-1(a)(6) – A description of the efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by Subpart 5.1 and, if not, which exception under 5.101 applies:
A notice to the Government Point of Entry (GPE) website (Sam.gov) was published on July
16, 2026, in accordance with FAR Subpart 5.1. This posting informed potential sources of
NASA’s intent to award this sole-source extension to SwRI. The results of this synopsis are summarized in Section 10 below.
7. FAR 6.104-1(a)(7) – A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable:
The Contracting Officer’s signature on this document indicates that the Contracting Officer has determined that the anticipated cost to the government will be fair and reasonable. The
Contractor is required to submit a proposal to be evaluated and negotiated by the
Government. Prior to execution of the contract extension, a proposal analysis will be performed. The proposal analysis will ensure that the final agreed-to price for the extension is fair and reasonable.
The Contracting Officer will perform a comprehensive evaluation of the Contractor's proposal to ensure that the negotiated cost is fair and reasonable. This evaluation will be based on inputs from a technical evaluation to be performed by the Contracting Officer’s
Representative (COR) and from verification of direct and indirect costs. The proposed workplan and labor hours will be evaluated against (1) applicable MMS Project Level 2 and
Level 3 operational requirements; (2) the scientific analysis goals/objectives proposed to be approved by the 2026 Heliophysics Senior Review; and (3) the data processing and archiving requirements documented in the MMS Project Data Management Plan, which will also be reviewed at the time of the 2026 Heliophysics Senior Review. The NF634, Structured
Approach Profit/Fee Objective, will be used to assess the appropriate fixed fee.
8. FAR 6.104-1(a)(8) – Description of the market research conducted, and the results, or a statement of the reasons market research was not conducted (e.g., urgent, and compelling requirement):
Based upon the knowledge and experience of the COR, no other entities currently exist that can perform the merged technical requirements of this procurement because they would require extensive and detailed knowledge of the unique instruments due to the reasons stated above. Therefore, extensive market research was not performed beyond publishing on
SAM.gov. The results of this synopsis are summarized in Section 10 below. The outcome confirms the COR’s assessment that no other entities currently exist that can perform the merged technical requirements of this procurement without unacceptable delays or risks.
9. FAR 6.104-1(a)(9) – Any other facts supporting the use of other than full and open competition:
The instrumentation was designed approximately twenty years ago and while significant documentation exists, much of the needed operational and calibration specifications and descriptions applicable after launch – and after in-flight anomaly mitigations – exists only in the personal knowledge and expertise of those currently operating the equipment. There are very few organizations with the expertise to analyze the data coming from these technically advanced and custom-built scientific instruments and there are no other organizations with the current knowledge to safely operate the instruments or to calibrate the raw data. An investment of several years of specialized technical training would be needed to propose against the requirements of this unique instrumentation. This mission is in flight and is now eight years beyond its design lifetime and still providing valuable science.
10. FAR 6.104-1(a)(10) – A listing of the sources, if any, that expressed an interest in writing in the acquisition:
A notice of NASA’s intent to award this sole-source action was synopsized on the GPE website (Sam.gov) per FAR Subpart 5.2 (See Section 6 above). The synopsis notified all interested sources that this requirement will be issued on a sole-source basis and provided them an opportunity to submit their interest and capabilities to the Contracting Officer within
15 days of the synopsis posting. The synopsis was posted on July 16, 2026, and closed on
July 30, 2026.
We received zero responses upon the expiration of the synopsis.
11. FAR 6.104-1(a)(11) – A statement of actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required:
The Agency will continue to examine the market in the future for alternative solutions or new sources before executing any subsequent acquisitions for the same requirements. Future decisions for continued operations and full competition will be based on the technical/scientific merits of the mission and the availability of funds.
File details come from the government source that posted it. Updated .