80GSFC27R0002_LISA FRS Flight_Draft SOW.pdf
PDF 925 KB Posted
- Solicitation number
- Not on record
About this file
LISA FRS Flight Statement of Work Summary
This is a Statement of Work (SOW) for the procurement of the Laser Interferometer Space Antenna (LISA) Frequency Reference System (FRS), a critical component for NASA's LISA mission scheduled to launch between 2035 and 2037. The Contractor shall design, develop, fabricate, integrate, test, analyze, verify, deliver, and provide post-delivery support for three flight FRS units (FM-1, FM-2, FM-3) and one spare unit. Each FRS consists of an optics box (FRS-O) and an electronics box (FRS-E) used to control and maintain laser frequency stability across three spacecraft separated by 1.55 million miles. The work is divided into three Contract Line Item Numbers: CLIN 0001 (Development, Cost Reimbursement) covering non-recurring engineering, development program, and parts procurement; CLIN 0002 (Production, Firm-Fixed Price) covering production and delivery; and CLIN 0003 (Task Orders, Time & Materials) for special studies. Delivery dates are FRS FM-1 by February 9, 2029; FRS FM-2 by September 4, 2029; FRS FM-3 by March 11, 2030; and FRS Spare by May 31, 2030.
The Contractor must comply with FRS Level 4 Requirements and the Contract Data Requirements List while implementing comprehensive systems engineering, configuration management, and mission assurance programs per LISA-SMA-REQ-0010. Key milestones include Integrated Baseline Review, System Requirements Review/Definition Review, Preliminary Design Review, Critical Design Review (requiring Technology Readiness Level 6 maturity and Government parts procurement concurrence), Manufacturing Readiness Review, Pre-Environmental Review, and Pre-Ship Review. The test program shall include electrical interface testing, comprehensive and limited performance tests using ESA LISA Power Spectral Density Recipe, EMI/EMC characterization, vibration testing, thermal balance analysis, and thermal vacuum (TVAC) testing with 8 thermal cycles for FM-1 and 4 cycles for other units. The Contractor must establish Earned Value Management Systems, maintain technical/cost/schedule baselines, support weekly Government meetings, designate an independent mission assurance point of contact, retain technical data for six years post-delivery, and provide post-delivery support in consultant-level remote capacity during post-shipment and integration phases. All reviews and meetings shall provide virtual attendance options, and deliverables include design documentation, analysis reports, test procedures, manufacturing plans, and quality assurance records per the CDRL.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision - Effective Date: July 29, 2026 ii Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
LISA FRS Flight Statement of Work (SOW) Review/Signature/Approval Page
Prepared by:
Zachary Denny
Reviewers/Approvers:
Noosha Haghani Aaron McCleskey Ira Thorpe Bradley Weidema Victor Sigmund Kenji Numata
Approved by:
Juli Lander
*** Electronic signatures are available on-line at: https://ipdtdms.gsfc.nasa.gov
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -iii Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
Preface
This document is under control by the LISA project configuration control board (CCB).
Changes to this document require prior approval of the LISA CCB chairperson or designee.
Proposed changes shall be submitted in the LISA Technical Data Management System (TDMS) via a configuration change request (CCR) along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.
All of the requirements in this document assume the use of the word "shall" unless otherwise stated.
Questions or comments concerning this document should be addressed to:
LISA Configuration Management Office (CMO) Mail Stop: 462 Goddard Space Flight Center Greenbelt, Maryland 20771
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -iv Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
Change History Log
Revision Effective Date Description of Changes (Reference the CCR & CCB/ERB Approval Date)
Draft Revision -
07/29/2026 Draft Release following the Approval of LISALSR-CCR-
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -v Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
Table of TBDs/TBRs/TBSs
[Required when TBDs/TBRs/TBSs are in Doc]
Action Item No.
Location Summary Individual/
Organization Actionee
Due Date
[This page to be completed by the Document Author.]
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -vi Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
Table of Contents
1 INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 LISA Mission Overview
1.4 Definitions
1.5 Related Documentation
1.5.1 Applicable Documents [and Forms]
1.5.2 Reference Documents
2 PRECEDENCE
3 WORK TO BE PERFORMED
4 MANAGEMENT
4.1 Program Management
4.1.1 Government Insight
4.1.2 Subcontract Management
4.1.2.1 Flow Down of Requirements to Subcontractors
4.2 Financial Management and Schedule Reporting
4.3 Risk Management
4.4 Configuration Management
4.4.1 Configuration/Change Control
4.4.1.1 Design Changes
4.5 Reviews and Meetings
4.5.1 Review Details
4.5.1.1 Kickoff Meeting
4.5.1.2 Program Management Review
4.5.1.3 Engineering Peer Reviews
4.5.1.4 Manufacturing Readiness Review
4.5.1.5 Test Data Reviews
4.5.1.6 Test Process Decision Meetings
4.5.1.7 Technical Interchange Meetings and Other Reviews and Meetings
4.5.2 Government-Chaired Instrument Reviews
4.5.2.1 Integrated Baseline Review [DEV]
4.5.2.2 System Requirements/Definition Review [DEV]
4.5.2.3 Preliminary Design Review (PDR) [DEV]
4.5.2.4 Critical Design Review (CDR) [DEV]
4.5.2.5 Pre-Environmental Review (PER)
4.5.2.6 Pre-Ship Review (PSR)
4.5.3 Higher-Level Reviews
4.6 Data Retention
4.7 Security
5 SYSTEMS ENGINEERING
5.1 Requirements Deviations, Waivers, Analyses, Derivations, and Allocations
5.1.1 Technical Performance Metrics
5.1.2 Interface Control Documents (ICDs)
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -vii Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
5.1.3 Giver/Receiver
5.2 Contamination Control
5.3 Design, Analysis, and Verification Documentation
5.3.1 Trending
5.4 Special Studies [TO]
6 MISSION ASSURANCE
6.1 Management
6.2 Surveillance
7 FABRICATION AND ASSEMBLY
7.1 Spare Parts/GSE
7.2 Hardware
7.3 Engineering Development Program [DEV]
7.4 Flight Models
7.5 Ground Support Equipment
8 TEST PROGRAM
8.1 Notification of Tests
8.2 Verification and Validation
8.2.1 Verification and Validation Plan
9 DELIVERY
9.1 Packaging, Handling, Storage, and Transportation
9.2 Delivery, Checkout, and Acceptance
9.2.1 Documentation Delivered with Hardware
9.2.2 Photographic Documentation
9.3 Test Data Files
9.4 FRS Post-Delivery Support [DEV, TO]
9.4.1 Post-Delivery Support Planning
9.4.2 Post-Shipment and Integration Support
Appendix A Abbreviations and Acronyms
List of Figures
No table of figures entries found.
List of Tables
Table 1. Top-Level FRS Reviews Table 2. LISA Mission Assurance Requirements Applicability
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
1 INTRODUCTION
1.1 Purpose
The Laser Interferometer Space Antenna (LISA) Frequency Reference System (FRS) consists of an optics box (FRS-O) and an electronics box (FRS-E) used to control and maintain the frequency stability of the LISA instrument lasers. Each of the three LISA spacecraft contain one FRS. The purpose of this document is for procurement of LISA FRS – three flight FRS and one spare FRS.
1.2 Scope
This Statement of Work (SOW) reflects the Contractor’s scope within the period of performance as defined in the Contract. Throughout the remainder of the document, the FRS supplier will be referred to as the “Contractor.” The National Aeronautics and Space Administration (NASA) and Goddard Space Flight Center (GSFC), including their support services contractors, will be referred to as the Government. The Contract, this SOW, and the Contract Data Requirements List (CDRL) (LISALSR-FRS-CDRL-0021) identify the deliverables associated with LISA FRS.
This SOW defines the effort required of the Contractor to design, develop, fabricate, integrate, test, analyze, verify, deliver, and provide post-delivery support.
This SOW covers all LISA FRS builds. Any requirement that is only applicable to the first flight unit or any other unit is specifically called out. Where no clarification regarding applicability is provided, the requirements are applicable to all flight units.
This SOW includes an identifier where each section or requirement applies to Development [DEV], Production [PROD], or Task Order [TO] Contract Line Item Numbers (CLIN). If there is no callout, the section or requirement applies to all CLINs. The CLINs are defined below:
Development CLIN (Cost Reimbursement):
CLIN 0001 – FRS Flight Model (FM)-1, Parts for FRS FM-1, FRS FM-2, FRS FM-3, and FRS Spare
CLIN 0001 shall include: Non-Recurring Engineering, Engineering Development Program, Post-Delivery Support, and Parts for FRS FM-1, FRS FM-2, FRS FM-3, and FRS Spare.
CLIN 0001 shall include all requirements identified as Development (DEV). If the section or requirement is not identified as DEV, PROD, or TO, the section or requirement applies to all CLINs.
Production CLIN (Firm-Fixed Price):
CLIN 0002 – FRS FM-1, FRS FM-2, FRS FM-3, and FRS Spare Production
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
CLIN 0002 shall include: FRS FM-1, FRS FM-2, FRS FM-3, and FRS Spare Production through delivery to Government.
CLIN 0002 shall include all requirements identified as Production (PROD). If the section or requirement is not identified as DEV, PROD, or TO, the section or requirement applies to all CLINs.
Task Order CLIN (Time & Materials):
CLIN 0003 – Task Orders
CLIN 0003 shall include Task Orders for Special Studies.
1.3 LISA Mission Overview
The Laser Interferometer Space Antenna (LISA) consists of three spacecraft that are separated by 1.55 million miles and trailing tens of millions of miles, more than one hundred times the distance to the Moon, behind the Earth as we orbit the Sun. These three spacecraft relay laser beams back and forth between the different spacecraft in order to measure changes in the interspacecraft distances caused by passing gravitational waves.
This Sun-sized astronomical observatory will catch gravitational waves in the millihertz band, which has yet to be observed but is expected to have a large number of astrophysical and cosmological gravitational wave sources. NASA is a major collaborator in this European Space Agency (ESA) led mission, which is scheduled to launch between 2035 and 2037 as per the LISA Mission Requirements Document (R- MIS-0630). NASA's contributions to the LISA mission are crucial to its success and reflect the agency's commitment to exploring the universe and advancing our understanding of the cosmos. NASA is specifically providing 4 Systems including a science ground segment to LISA. These include:
1. (6) Telescope systems: The light exchanged between the spacecraft pass through telescopes on both the transmit and receive end. The telescopes vastly improve the efficiency of optical transmission across the vast inter-spacecraft distances, allowing sufficient power to be exchanged such that the length precision required for gravitational wave detection can be met. Each telescope interfaces in both the transmit and receive directions with the optical bench, where various signals are combined to produce interferometric signals that are recorded by the phasemeter and transmitted to ground. The telescopes must have extremely high dimensional stability, low backscatter of the transmit beam, and must be able to operate in the harsh environment of space.
2. (3) Laser systems: The laser systems provide the light which is used to make the interferometric measurements across the constellation. Each of the two optical benches on each spacecraft has a dedicated laser which provides the primary light source for measurements made on that bench. In addition, the majority of the light delivered to the bench is directed towards the distant spacecraft via the bench/telescope interface. To reach the required sensitivity, the laser must provide sufficient optical power while also meeting stability requirements in frequency, intensity, and spectral content. Reliability to enable
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE high science duty cycle and long observation times are an additional design driver and have a direct impact on science return.
3. (3) Charge management devices: The interferometric measurement between the LISA spacecraft is ultimately referenced to “test masses” located inside each spacecraft. The test masses are freely-falling cubes of gold-platinum which have no physical contact with the spacecraft. Electrostatic charge buildup on the test masses caused by the cosmic ray environment can lead to stray forces on the test masses that will disturb the gravitational wave measurement. The charge management device (CMD) uses ultra violet light to control the charge on the test mass without disturbing it. This UV charge control technique was successfully demonstrated on LISA Pathfinder. The CMD must provide precise levels of UV light to the right location within the test mass assembly and must be able to operate in the extreme environment of space over the duration of the mission.
4. The NASA Science Ground Segment (N-SGS). This supports the science objectives of the NASA LISA Project and fulfills NASA’s commitments to ESA in science analysis as specified in the NASA-ESA MoU for LISA. The N-SGS will receive data from the ESA Science Operations Centre and run pipelines to search for gravitational wave signals, characterize the residual instrumental noise, and identify unknown features or transients for further study. Products generated by the N-SGS will inform LISA’s science operations and contribute to the public data releases as defined in the LISA Science Management Plan.
The N-SGS pipelines must accommodate LISA’s signal-rich data set, in which tens of thousands of gravitational wave signals, as well as instrumental effects, are simultaneously present in the data streams.
1.4 Definitions
Contractor – The developer of the item of reference. If the term Contractor is used in this document without specific reference to an item (e.g., FRS, ground support equipment (GSE), etc.), then the term shall be interpreted to imply the FRS Contractor. In all cases, the term Contractor also implies any and all associated suppliers and subcontractors.
Government – Federal Civil Servants and support contractors (contractors that represent NASA or are delegates for NASA).
Shall – Compliance by the Contractor is mandatory. Any deviations from these contractually imposed mandatory requirements require the approval of the Contracting Officer.
Should – Preferred good practices are identified by “should” statements. “Should” designates performance, which is requested, but not mandatory. Noncompliance of a “should” statement does not require Government approval but should be addressed at the earliest applicable project milestone.
May – At the discretion of the Contractor or Government.
Will – Designates the intent of the Government.
Applicable documents – The term “applicable documents” denotes Government-prepared and
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE controlled documents and industry standards documents that levy additional requirements on the Contractor. The Contractor is required to comply with the documents, or the tailored version of the documents provided by the Government.
Reference documents – The term “reference documents” denotes documents that amplify or clarify the information presented in this document. The Contractor is not required to meet any requirements listed within these documents.
TBS – The term “to be supplied” (TBS) refers to a document or information that will be developed or provided.
TBR – The term “to be reviewed” (TBR) means that the stated requirements or values will be reviewed for appropriateness jointly by the Contractor and the Government and the information may be changed. The TBR requirement/value remains a requirement until formal process of configuration change review, approval, and Contract modification.
TBP – The term “to be proposed” (TBP) indicates required Contractor fill-ins as part of the solicitation process.
TBD – The term “to be determined” (TBD) identifies a missing requirement or value; indicates further research or analysis is needed to determine the information. All changes to resolve these items will be completed through a formal process of configuration change review, approval, and Contract modification.
Virtual/Virtually – The terms “Virtual” or “Virtually,” when applied to products being provided, indicate that the products will be provided electronically.
1.5 Related Documentation
All document citations are assumed to be the latest version unless otherwise noted.
1.5.1 Applicable Documents [and Forms]
Document Number Document Name NASA-STD-5020 Requirements for Threaded Fastening
Systems in Spaceflight Hardware NASA-STD-5019 Fracture Control Requirements for
Spacecraft Hardware LISA-ELEC-ICD-0013 Laser System Tuning Digital Interface LISA-MGMT-TN-0027 ESA: LISA Power Spectral Density (PSD)
Recipe SAE AS9100 Quality Systems – Aerospace
Model for Quality Assurance in Design, Development, Production, Installation, and Servicing
LISALSR-FRS-CDRL-0021 FRS Contract Data Requirements List LISALSR-FRS-REQ-0067 FRS Level 4 Requirements
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
NASA-STD-8739.4 Workmanship Standard for Crimping, Interconnecting Cables, Harnesses, and Wiring
NASA-STD-8739.6 Implementation Requirements for NASA Workmanship Standards
NASA-STD-8739.12 Metrology & Calibration NPR 8000.4 Agency Risk Management Procedural
Requirements GSFC-STD-1001A Criteria for Flight and Flight Support
Systems Life Cycle Reviews GSFC-STD-6001 Area Array Package Assembly and
Manufacturing Practices for Flight Hardware
GSFC EEE-INST-002 Instructions for Electrical, Electronic, and Electromechanical (EEE) Parts Selection, Screening, Qualification, and Derating
IPC/WHMA-A-620x-S Requirements and Acceptance for Cable and Wire Harness Assemblies
IPC J-STD-001, class 3 Standard Soldering Requirements LISA-SMA-REQ-0010 Mission Assurance Requirements (MAR) IPC-2225 Sectional Design Standard for Organic
Multichip Modules (MCML) and MCM-L Assemblies
IPC-6015 Qualification and Performance Specification for Organic Multichip Module (MCM-L) Mounting and Interconnecting Structures
IPC-6012 Qualification and performance of rigid printed boards
ANSI/ESD S20.20 Protection of Electrical and Electronic Parts
MIL-PRF-55110 Performance Specification: Printed Wiring Board, Rigid General Specification
ECSS-Q-ST-70-60 Qualification and procurement of printed circuit boards
GEIA-STD-0005-1 Standard for Developing a Lead-Free Control Plan to Manage the Risks of Lead-Free Solders and Finishes in Aerospace, Defense, and High-Performance Soldered Electronic Products
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
GEIA-STD-0005-2 Standard for Mitigating the Effects of Tin Whiskers in Aerospace and High Performance Electronic Systems
LISA-CNTM-PLAN-0067 LISA Contamination Control Plan NIST SP 800-37 Risk Management Framework for
Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy
NIST SP 800-53 Security and Privacy Controls for Information Systems and Organizations
NPR 1600.1 NASA Security Program Procedural Requirements (Updated with Change 1)
NPR 2810.1F Security of Information Technology (IT) GPR 7120.4 Risk Management 540-PG-8700.2.1.E Design of Dollies, Stands, and Spacecraft
Shipping Containers 500-PG-8700.2.2E Electronics Design and Development LISA-SYS-REQ0039 Radiation Hardness Assurance
Requirement Document (RHARD) LISA-SYS-REQ0038 LISA Radiation Engineering Input to
Environmental Requirements (RADER) LISA-SMA-PLAN0041 LISA Materials and Processes Selection, Control, and Implementation Plan LISA-ELEC-PLAN0088 LISA Laser System Electromagnetic
Compatibility (EMC) Control Plan
1.5.2 Reference Documents
Document Number Document Name NASA-TM-86556 Lubrication Handbook for the Space
Industry (Part A: Solid Lubricants, Part B: Liquid Lubricants)
LISA-ELEC-PLAN0084 LISA Magnetics Plan NPR 7120.5 NASA Space Flight Program and Project
Management Requirements NASA/CR-2005-213424 Lubrication for Space Applications NPR 7123.1 NASA Systems Engineering Processes and Requirements Updated w/Change 2
GSFC 500-PG-8700.2.7 Procedures and Guidelines for Design of Space Flight Field Programmable Gate Arrays
GSFC-STD-7000A General Environmental Verification Standard (GEVS)
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
GPR 8700.6 Engineering Peer Reviews 400-PG-7120 Schedule Management SP-2010-3403 NASA Schedule Management Handbook
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
2 PRECEDENCE
In the case of conflicting requirements, the order of precedence of documents not specifically called out in the Contract is: The Contract takes precedence over the SOW, followed by the CDRL, FRS Level 4 Requirements, and the remaining applicable documents. In the event of an inconsistency between any of the reference documents herein and the requirements of this SOW, the SOW shall take precedence. Any conflicts discovered by the parties between the requirements in this SOW and any referenced specification herein shall be brought to the attention of the other party for resolution.
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
3 WORK TO BE PERFORMED
This section, along with the Contract, CDRL (LISALSR-FRS-CDRL-0021), and all documents invoked within these documents, describes the work to be accomplished by the Contractor.
Specifically, the Contractor shall provide the effort and resources that include, but are not limited to, personnel, materials, equipment, and facilities necessary for the successful and on-time design, analysis, development, fabrication, assembly, integration, test, calibration, qualification, delivery, and post-delivery support of all FRS units. “Fabrication” in this sense also includes procured items.
The Contractor shall comply with all FRS Level 4 Requirements (LISALSR-FRS-REQ-0067) except those labeled “Government Requirement”. The Contractor shall comply with the CDRL
(LISALSR-FRS-CDRL-0021).
The Contractor shall deliver to the Government FRS units that are fully tested, qualified, and calibrated. The Contractor shall support the development of bilateral documents, analyses, and models, which define the details of the FRS-to-Laser-System interface and operating information.
The Contractor shall deliver numeric data in a digital format that is not a scanned format.
The Contractor shall provide all necessary effort to produce and deliver all materials required in the CDRL (LISALSR-FRS-CDRL-0021). Call-outs for individual CDRLs within this SOW are stated as a convenience. Not all required CDRL deliverables and the necessary efforts to develop those CDRLs are stated in this SOW.
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
4 MANAGEMENT
4.1 Program Management
The Contractor shall assign a point of contact to the Contracting Officer Representative who is responsible for the performance of the contractual effort.
4.1.1 Government Insight
The Contractor’s management, tracking, control, and reporting processes shall facilitate insight by the GSFC Program Office into the FRS progress and status, including Contractor systems necessary to share information and review material within the scope of the contract.
The Contractor shall share information with the Government via the Government’s on-line collaborative workspace.
The Contractor shall support weekly meetings and telecons with the Government to discuss status, progress, and planned work; technical issues; financial and business metrics such as staffing, spending, and funding; and special studies’ task status and hours.
The Contractor shall invite the Government to critical reviews and ensure Government access to their data within the scope of the Contract.
4.1.2 Subcontract Management
The Contractor shall ensure that all subcontractors establish and maintain technical, cost and schedule baselines.
4.1.2.1 Flow Down of Requirements to Subcontractors
The Contractor shall flow all applicable requirements and controls stated or referenced herein to its Subcontractors.
4.2 Financial Management and Schedule Reporting
The Contractor shall use and maintain an Earned Value Management System (EVMS) in accordance with the EVMS requirements described in this Contract Section I, Clause NFS 1852.234-2. The EVMS shall be supported by the Contractor's management processes and systems and in accordance with the Contractor’s Earned Value Management (EVM) Plan.
4.3 Risk Management
The Contractor shall establish and maintain a comprehensive risk management program that meets the requirements of the Contractor’s established Risk Management processes or NASA Procedural Requirement (NPR) 8000.4, Risk Management Procedural Requirements.
The Contractor shall invite the Government to attend Contractor Risk Management Board meetings.
4.4 Configuration Management
The Contractor shall implement a configuration control process that enables the Contractor Program Manager (PM) to assess and control configuration planning, identification, control, status accounting, and verification.
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
The Contractor shall submit for Government consideration a waiver or deviation for any flight item that is considered non-compliant with the requirements.
4.4.1 Configuration/Change Control
The Contractor shall notify the Government as soon as practical for any changes, waivers, or deviations that would affect the requirements of this contract or its execution. Impacts to the ICD or MICD are highly sensitive to early identification and coordination among all affected parties.
4.4.1.1 Design Changes
The Contractor shall document and control engineering changes and deliver to the Government
(CDRL SE-XX).
4.5 Reviews and Meetings
The Contractor shall conduct, host, prepare, and present Instrument reviews and provide review packages in accordance with the stated CDRL (LISALSR-FRS-CDRL-0021) for each sensor Instrument as shown in Table 1-1. The Government shall be invited to participate in all required reviews. All reviews and meetings shall provide a virtual attendance option, unless otherwise agreed to by the Government.
The top-level Instrument reviews are provided in Table 1 below. Further details for each review can be found in the subsequent sections of this SOW.
The Contractor shall develop and apply a process for capturing, responding, and closing assigned action items assigned by the Government; reviews are not complete until actions are complete or a detailed plan for closure is submitted by the Contractor and approved by the Government.
Table 1. Top-Level FRS Reviews
Review Applicability CDRL Reference Chair Integrated Baseline Review (IBR)
[DEV] RE-XX Government
System Requirements Review (SRR) / System Defintion Review (SDR)
[DEV] RE-XX Government
Preliminary Design Reivew (PDR)
[DEV] RE-XX Government
Critical Design Review
[DEV] RE-XX Government
Manufacturing Readiness Review
(MRR)
All FRS Units RE-XX Contractor
Pre-Environmental Review (PER)
All FRS Units RE-XX Government
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
Pre-Ship Review
(PSR)
All FRS Units RE-XX Government
4.5.1 Review Details
4.5.1.1 Kickoff Meeting
The Contractor shall hold a Kickoff Meeting [DEV] (CDRL RE-XX).
The Contractor shall hold a Production Kickoff Meeting [PROD] for FRS FM-1 and beyond.
Individual Production Kickoff Meetings will be conducted for FRS FM-1, FRS FM-2, FRS FM- 3, and FRS Spare. The Contractor may combine the Production Kickoff Meeting with the Manufacturing Readiness Review (MRR) if there are minimal changes between FMs.
4.5.1.2 Program Management Review
The Contractor shall hold monthly Program Management Reviews (CDRL PM-XX).
4.5.1.3 Engineering Peer Reviews
The Contractor shall conduct EPRs in accordance with the EPR Plan (CDRL PM-X) and invite the Government to attend. The EPR plan highlights critical project areas early to facilitate discussion and alignment. Finally, it ensures the review process remains streamlined and engineering-focused, eliminating the administrative overhead of unnecessary charts and presentations.
4.5.1.4 Manufacturing Readiness Review
The Contractor shall prepare for and conduct an MRR (CDRL RE-XX).
4.5.1.5 Test Data Reviews
The Contractor shall invite the Government personnel to Quicklook reviews and Post-Test data reviews.
4.5.1.6 Test Process Decision Meetings
The Contractor shall conduct Test Readiness Reviews (TRR) in accordance with CDRL RE-XX prior to the start of any critical test of FRS as identified in the EPR Plan (CDRL PM-XX).
The Contractor shall include Government personnel in TRRs and in the test procedure review process and provide a copy of the final procedure (CDRL IT-XX).
4.5.1.7 Technical Interchange Meetings and Other Reviews and Meetings The Contractor shall conduct technical/management meetings with the Government as needed or as requested to discuss and resolve any technical and/or managerial issues or concerns; any actions shall be managed by the Contractor to completion.
4.5.2 Government-Chaired Instrument Reviews
All Government-chaired reviews will have review boards appointed by the Government. The Contractor shall propose, for Government chair approval, one independent senior engineer or PM familiar with the Instrument to this review board. The Contractor shall determine the optimum number of consecutive days to perform each of these reviews to meet the requirements in GSFC-STD-1001, Criteria for Program Flight Critical Milestone Reviews, as identified in the
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE associated CDRL DIDs. Formal action items are logged and tracked by the Government Review Team. The Contractor shall demonstrate compliance with the review success criteria identified in the associated CDRL DIDs (CDRLs RE-X). The Government will work with the Contractor to refine the review agenda.
If the review success criteria are not met to the Government's satisfaction, a “delta” review shall be conducted. This “delta” review shall meet the requirements of the appropriate system-level review (e.g., Critical Design Review (CDR)) and must cover all updates, modifications, and impacted designs and analyses as defined herein and in the applicable CDRL.
4.5.2.1 Integrated Baseline Review [DEV]
The Contractor shall prepare for and support an Integrated Baseline Review (IBR) to assess and validate the Performance Management Baseline in accordance with CDRL RE-X. This review will be scheduled as early as practicable and conducted in accordance with NASA requirements within 180 days of Contract award or formal Contract Definitization.
4.5.2.2 System Requirements/Definition Review [DEV]
The Contractor shall conduct a System Requirements Review (SRR)/System Definition Review
(SDR) (CDRL RE-XX).
4.5.2.3 Preliminary Design Review (PDR) [DEV]
The Contractor shall conduct a Preliminary Design Review (PDR) at the conclusion of the preliminary design effort (CDRL RE-XX).
4.5.2.4 Critical Design Review (CDR) [DEV]
The Contractor shall conduct a CDR (CDRL RE-XX).
The Contractor shall obtain Government concurrence to purchase any parts and materials prior to CDR.
The Contractor shall ensure all subsystems have achieved Technology Readiness Level (TRL) 6 maturity by CDR.
4.5.2.5 Pre-Environmental Review (PER)
The Contractor shall conduct a Pre-Environmental Review (PER) prior to the start of environmental testing of each FRS to establish the readiness of the system to enter environmental test and to evaluate the readiness of environmental test plans and procedures.
4.5.2.6 Pre-Ship Review (PSR)
The Contractor shall conduct a Pre-Ship Review (PSR) (CDRL RE-XX) at the conclusion of the integration and test (I&T) effort prior to shipment and/or storage of each FRS FM. If the FRS FM is stored for a period greater than six months prior to shipment, the Contractor shall prepare an abbreviated delta-PSR immediately prior to shipment to review logistical shipping details as well as any additional work or testing performed on the Instrument since the
PSR.
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
4.5.3 Higher-Level Reviews
The Contractor shall support project-level Preliminary Design Review (PDR) and project-level Critical Design Review (CDR). The Contractor shall support these reviews by contributing to, preparing, reviewing, and/or presenting presentations and documentation; see CDRL RE-XX, Inputs to Project Level Reviews. The reviews will be conducted at GSFC.
Once the FRS FM is delivered, the Contractor shall support all reviews necessary for the successful integration, test, and operation as defined in Section 6 of this SOW.
4.6 Data Retention
Consistent with Contract Section E, Clause GSFC 52.246-102, INSPECTION SYSTEM RECORDS, the Contractor shall retain those data necessary to provide a technical and program database of significant decisions, plans, and the execution thereof as well as those data providing design, manufacturing, and test history of all deliverable items for the period of 6 years after delivery of all items and completion of all services called for by the Contract. Data to be retained include the following:
• Part and material procurement: Test, screening, and inspection data, including nonconformance reports.
• Subassembly and higher assembly: Fabrication, assembly, test, and inspection data.
• Shop travelers (including travelers at Subcontractors).
• Kitting/traceability records.
• Executed test procedures.
• Listing of test equipment used.
• Test and calibration data, including nonconformance reports.
• GSE certification, calibration of test equipment.
• As-built/as-designed verifications.
• Operating time logs.
• Total test time for each environment.
• End Item Data Packages.
• Design review data and packages.
• Drawings.
• Contractor Parts, Materials, and Processes.
• Control Authority records of all performed testing:
o Qualification and acceptance test data.
o Destructive physical analysis reports with samples.
o Radiation hardness assurance test data.
• Computer Aided Design data files that capture the mechanical design of the FRS and associated Ground Support Equipment (GSE).
• Photographic documentation.
• Models used to perform analyses for delivered CDRLs (e.g., thermal, optical, contamination, structural, electrical, magnetic, mechanical).
• Environmental records.
• Numeric data in digital format.
• Software lookup tables.
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
• Sensor data collected during formal testing.
• Documentation of National Institute for Standards and Technology (NIST)-traceability related to calibration or intercalibration, if applicable.
4.7 Security
The Contractor shall maintain the Federal Information Systems in accordance with the NIST Risk Management Framework (RMF) identified in Risk Management Framework for Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy, NIST SP 800-37, and Security and Privacy Controls for Information Systems and Organizations, NIST SP 800-53. Per NIST SP 800-37 (Appendix B and Appendix G), all systems that operate on behalf of NASA or that store or process data on behalf of NASA are Federal Information Systems subject to the same NIST SP 800-53 security and privacy requirements as NASA-owned systems.
The Government will follow Space System Protection Standard, NASA-STD-1006, to prepare and submit Candidate Protection Strategies (CPS) leading to a Project Protection Plan (PPP).
The Contractor shall support these NASA-led CPS and PPP activities and updates throughout the lifecycle.
The Contractor shall respond to NASA-developed project-specific threat impact assessments and implement mitigations for threats, as needed.
The Contractor shall develop and implement a plan for ensuring security and emergency responses in accordance with NASA Security Program Procedural Requirements, NPR 1600.1, and NASA Continuity of Operations Planning Procedural Requirements, NPR 1040.1.
The Contractor shall implement and monitor physical security controls in all areas wherein FRS are being developed or manufactured.
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
5 SYSTEMS ENGINEERING
The Contractor shall implement a systems engineering approach applied to all FRS-related activities throughout its stages of development that includes such responsibilities as:
a. Providing technical direction and oversight throughout all phases of the program.
b. Leading, supporting, and/or preparing documentation for peer reviews as well as those reviews defined in Section 4.5.
c. Performing coordination, studies, and analyses required to interface FRS to the spacecraft, including FRS-specific support to ground system requirements development and operations.
d. Completing analyses and simulations in support of technical requirements compliance, verification, and demonstrations to fully establish, define, maintain, and control allocations for all required performance and design parameters.
5.1 Requirements Deviations, Waivers, Analyses, Derivations, and Allocations The Contractor shall provide the definition, allocation, derivation, and traceability of requirements and the verification approach (CDRL SE-XX).
The Contractor shall deliver verifications for FRS Level 4 Requirements (LISALSR-FRS-REQ- 0067) except those labeled “Government Requirement” (CDRL SE-XX).
Requests for deviations or waivers to the Government’s requirements shall be submitted to the Government’s Contracting Officer for Government approval and documented as Engineering Change Requests (CDRL SE-XX).
5.1.1 Technical Performance Metrics
The Contractor shall identify and manage Technical Performance Metrics (TPM) (CDRL SE- XX), comprised of key performance requirements for the end item product, including monthly tracking and reporting TPM status and changes (CDRL PM-XX).
5.1.2 Interface Control Documents (ICDs)
The Contractor shall develop and deliver FRS-specific ICDs (CDRL SE-XX) the Government will use to develop LISA Laser System ICDs. The Contractor shall collaboratively work with the Government to review and maintain accurate FRS-specific ICDs.
5.1.3 Giver/Receiver
The Contractor shall collaboratively support the development, maintenance, and review of the FRS giver/receiver (GR) list to be exchanged between the Contractor and the Government. The Contractor shall provide the items documented in the GR list per the schedules documented and agreed to therein.
The GR list shall be incorporated into the IMS in accordance with CDRL PM-XX, IPMDAR.
5.2 Contamination Control
The Contractor shall incorporate contamination control into the FRS design, processes, LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE and planning per LISA Contamination Control Plan (LISA-CNTM-PLAN-0067) and in accordance with CDRL SE-XX. The FRS shall be cleaned prior to its use and shipment. The Contractor shall monitor the FRS for contamination effects and validate FRS contamination controls. The Contractor shall document contamination analyses as specified in the analysis reports in accordance with CDRL SE-XX.
The Contractor shall verify that all contamination requirements are met prior to delivery to the Government.
GSE shall be delivered in a state that prevents particulate contamination.
All GSE intended to be used in vacuum shall be baked out prior to delivery.
5.3 Design, Analysis, and Verification Documentation
The Contractor shall perform and document all analyses of the data and information from the design, qualification testing, and acceptance testing of the Contractor’s hardware and software which are required to ensure that the FRS will meet its specifications and objectives. All analyses performed by the Contractor under this Contract shall be made available to the Government upon request.
5.3.1 Trending
The Contractor shall establish and implement a method for trending test data through the life of the program (CDRL SE-X).
5.4 Special Studies [TO]
The Contractor shall conduct, in addition to the requirements specified in this document and the Contract, additional engineering studies, tests, technical analyses, reviews of test results, design modifications, risk reduction activities, and tasks relating to the development, implementation, characterization, and operation of the FRS, as authorized by the Government and in accordance with the Contract. Each task will be initiated by written direction from the Government Contracting Officer. The Government will coordinate with the Contractor to define each task in detail, and establish manpower ceilings, performance schedules, and deliverables.
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
6 MISSION ASSURANCE
The Contractor shall develop, implement, and maintain a comprehensive mission assurance program in compliance with LISA Mission Assurance Requirements (LISA-SMA-REQ-0010) Table 2. LISA Mission Assurance Requirements Applicability.
Table 2. LISA Mission Assurance Requirements Applicability
Title Applicability Mission Assurance Compliance Matrix [DEV] Supplier List All FRS Units Foreign Object Debris (FOD) Program [DEV]
Orbital Debris Assessment Report (ODAR) and End of Mission Plan (EOMP)
Not Applicable (MIUL provides necessary information)
System Safety Plan [DEV] Safety Requirements Compliance Checklist [DEV] Operations Hazard Analysis and Hazard Verification Tracking Log [DEV]
Instrument Safety Assessment Report [DEV]
Hazardous Procedures for Payload I&T and Pre-Launch Processing
Not Applicable (The Government is responsible for the hazardous procedures at Spacecraft I&T and Launch Processing facilities)
Pre-Mishap Plan [DEV]
Reliability Program Plan (RPP) Not Applicable (The Government is responsible for Project-level RPP)
FMECA and Critical Items List [DEV] Fault Tree Analysis [DEV] Reliability Calculations [DEV] Limited Life Items List [DEV] Parts Stress Analysis [DEV] Worst-Case Analysis [DEV]
Software Assurance Plan Not Applicable (FRS does not contain flight software)
ESD Control Plan [DEV] Printed Circuit Board Procurement Plan [DEV] Printed Circuit Board (PCB) Coupon Evaluation Report All FRS Units Lot Acceptance and Quality Conformance Testing Results for Printed Circuit Boards All FRS Units
Lead-Free Control Plan [DEV] EEE Parts Control Plan [DEV] Master EEE Parts List All FRS Units
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
Radiation Effects Mitigation [DEV]
M&P Selection, Control, and Implementation Plan (MPCIP) N/A (GSFC is responsible for project level MPCIP)
Materials Usage Agreement (MUA) [DEV] Materials Identification and Usage List (MIUL) [DEV]
Life Test Plan and Final Report for Lubricated Mechanisms Not Applicable (FRS does not contain any lubricated mechanisms)
Additive Manufacturing Control Plan (AMCP) [DEV] AM Part Production Plan (PPP) [DEV] Contamination Control Plan [DEV] GIDEP Alert / NASA Advisory Dispositions All FRS Units Significant Parts, Materials, and Safety Problems All FRS Units End Item Acceptance Data Package All FRS Units
6.1 Management
The Contractor shall designate an independent Point of Contact for assurance activities that is independent of project management and with functional freedom and authority to interact with all elements of the project.
6.2 Surveillance
The Contractor shall report the status of facility operations and quality metrics to the Government on a quarterly basis. This should include the data for first tier and second tier suppliers in the Critical Items List.
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
7 FABRICATION AND ASSEMBLY
The Contractor shall provide all necessary personnel, facilities, services, materials, tooling, and test equipment to fabricate and assemble the FRS in accordance with its design specifications and Contract requirements. “Fabrication” in this sense also includes procured items except those stated in the Government Furnished Property (GFP) List.
A Manufacturing (Fabrication and Assembly) Flow Plan, or equivalent, shall be created and maintained with updates included as a part of reviews listed in Table 1, Top-Level FRS Reviews.
7.1 Spare Parts/GSE
The Contractor shall develop, deliver, and implement an approved spare parts program plan for critical flight spare components and for critical GSE spares except those stated in the Government Furnished Property (GFP) List (CDRL SE-XX).
Once the plan is approved by the Government, the Contractor shall procure sufficient spare parts to account for typical attrition during the manufacturing process due to handling, random failure, programming, etc. The FRS spare parts shall be qualified, tested, stored, and calibrated to the same standards as the flight FRS articles consistent with their spared level of assembly.
7.2 Hardware
The Contractor shall deliver hardware as defined in the Contract.
7.3 Engineering Development Program [DEV]
The Contractor shall design and implement a development program to address testing, design, analysis, modeling, and technical documentation necessary to be ready for CDR.
7.4 Flight Models
The Contractor shall develop and deliver FRS units as per the delivery schedule in the contract.
The Government will coordinate with The Contractor to perform specialized fiber splicing necessary for FRS fabrication.
7.5 Ground Support Equipment
The Contractor shall develop and maintain GSE, including specialized equipment necessary to support all FRS testing prior to delivery.
The Contractor shall develop and maintain GSE necessary for FRS transportation, protection, and storage for each delivery.
LISA FRS Flight SOW LISALSR-FRS-SOW-0021, Draft Revision -
Check the LISA TDMS Server at https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use.
NASA/ESA LISA Internal Project Use Only – DO NOT DISTRIBUTE
8 TEST PROGRAM
The Contractor shall prepare and conduct a test program that meets requirements as specified in FRS Level 4 Requirements (LISALSR-FRS-REQ-0067) prior to delivery to The Government.
General Environmental Verification Standard (GEVS) (GSFC-STD-7000) may be used as a guideline. The hardware test program shall cover all phases of development and manufacturing.
The Contractor shall perform end-to-end tests in TVAC, unless otherwise approved by the Government. The Contractor shall provide a plan that includes any recommended tailoring for environmental tests for Government approval in accordance with CDRL IT-XX.
The Government shall be invited to attend all Qualification TRRs and Formal Qualification Testing.
The Contractor shall provide access to facilities and data to support independent review of test data by the Government team during performance and environmental tests. Tools utilized by the Contractor to verify performance shall be made available to the Government.
Prior to mating with other hardware, electrical harnessing shall be tested to verify the wire routing, isolation, impedance, and overall workmanship.
CPTs shall be conducted to demonstrate that the hardware and software meet their performance requirements within allowable tolerances. CPTs shall use ESA: LISA Power Spectral Density (PSD) Recipe (LISA-MGMT-TN-0027) for noise data analysis. The initial CPT serves as a technical baseline against which the results of all later CPTs shall be compared.
CPTs shall demonstrate:
• With the application of known stimuli, the test article will produce the expected responses and outputs within allowable tolerances.
• The operation of redundant circuitry.
• The operation of all optical channels.
• Satisfactory performance in all operational modes and optical channels.
• When compared to the initial baseline CPT, performance of the test article has been unaffected by the environmental testing program.
When environmental testing is performed, CPTs shall be conducted during the hot and cold extremes of the test for both maximum and minimum input voltages.
Limited Performance Tests (LPT) shall be conducted where CPTs are not warranted or not practicable to demonstrate that the selected hardware and software performance has not been degraded by environmental testing/exposure. LPTs are a subset of the overall CPT test sequence.
The LPT is a subset of…