Questions and Answers 1.pdf

PDF 76 KB Posted

Attached to
NASA/GSFC ROMAN SPACE TELESCOPE DELTA-V (22N) THRUSTER PROCUREMENT
Solicitation number
80GSFC21R0071
Issued by

About this file

This document contains questions and answers related to solicitation number 80GSFC21R0071 for Delta-V 22N thrusters for the Roman Space Telescope. The National Aeronautics and Space Administration Goddard Space Center seeks suppliers to procure the thrusters, thermostats, alignment tools, nozzle plugs, and implement General Machine and Interface Provisions and thermal vacuum bake-out and thermal cycling testing requirements. Waivers will not be granted for these requirements. Qualification units will not be requested if qualification testing is unnecessary based on the supplier's level of compliance.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers on RFP 80GSFC21R0071, RST Delta V Thrusters

Questions 1: Is the supplier expected to procure the Thermostats, or will the Thermostats be furnished by GSFC or another source as furnished equipment on the contract?

GSFC Response: The supplier is expected to procure the thermostats.

Question 2: What is the quantity (each) of Test Plugs and Alignment Tools being asked for?

GSFC Response: We are asking for 2 alignment tools and 2 nozzle plugs per thruster type (See SOW Paragraph 4.3).

Question 3: Will GSFC consider waiver of GMIPs? Implementation of these on the heritage supplier products can affect cost and schedule.

GSFC Response: GMIPs will not be waived. (GMIPs are defined in SOW Paragraph 6.4.3. and will be defined at the kick-off meeting.)

Question 4: Will GSFC consider wavier of Thermal Vacuum Bake-Out and Thermal Cycling requirements?

Implementation of these on the heritage supplier’s products can affect cost and schedule.

GSFC Response: Thermal Vacuum Bake-Out and Thermal Cycle Testing will not be waived.

Question 5: If the supplier’s level of compliance to the SOW and SPEC does not warrant the need for a qualification unit, is a separate qualification unit still requested by GSFC?

GSFC Response: No. We will not request a qual unit if there is no need to perform qualification testing.