Final_Europa_LPLV_RFP_Sections_B-M_21Dec2017.docx.pdf

PDF 1 MB Posted

Attached to
Low Pressure Latch Valves for the Europa Clipper Mission
Solicitation number
80GSFC18R0004
Issued by

About this file

Europa Low Pressure Latch Valve RFP Sections B-M

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation # 80GSFC18R0004

Europa Clipper Low Pressure Latch Valve (LPLV)

Table of Contents

SECTION B - SUPPLIES OR SERVICES AND PRICES

B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)

B.2 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (JAN 2017)

B.3 GSFC 52.232-99 MILESTONE PAYMENT SCHEDULE (FIXED PRICE) (NOV 2013)

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)

C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER SOFTWARE (MAR 2008) . 13

C.3 GSFC 52.235-91 REPORTS OF WORK (CORE) (AUG 2013)

SECTION D - PACKAGING AND MARKING

D.1 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)

D.2 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (JAN 2011)

D.3 CLAUSES INCORPORATED BY REFERENCE -SECTION D

E.1 52.246-2 INSPECTION OF SUPPLIES - FIXED-PRICE (AUG 1996)

E.2 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

E.3 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

E.4 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS (OCT 1988)

E.5 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR 2015)

E.6 GSFC 52.246-93 ACCEPTANCE LOCATION(S) (APR 2008)

E.7 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT NOT REQUIRED (APR 1989) 20

E.8 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)

E.9 CLAUSES INCORPORATED BY REFERENCE -SECTION E

SECTION F - DELIVERIES AND PERFORMANCE

F.1 52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

F.2 52.242-15 STOP-WORK ORDER (AUG 1989)

F.4 52.247-34 F.O.B. DESTINATION (JAN 1991)

F.5 1852.247-72 ADVANCE NOTICE OF SHIPMENT (OCT 1988)

F.6 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING (FEB 2016)

F.7 CLAUSES INCORPORATED BY REFERENCE -SECTION F

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC

2014)

G.2 1852.227-70 NEW TECHNOLOGY – OTHER THAN A SMALL BUSINESS FIRM OR NON-PROFIT

ORGANIZATION (APR 2015)

G.3 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT

REPRESENTATIVE (APR 2015)

G.4 1852.227-86 COMMERICAL COMPUTER SOFTWARE - - LICENSING (APR 2015)

G.5 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)

G.6 GSFC 52.232-95 INVOICES - SUBMISSION OF (AUG 2016)

G.7 CLAUSES INCORPORATED BY REFERENCE -SECTION G

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)

H.2 1852.225-70 EXPORT LICENSES (FEB 2000)

H.3 1852.228-78 CROSS-WAIVER OF LIABILITY FOR SCIENCE OR SPACE EXPLORATION ACTIVITIES

UNRELATED TO THE INTERNATIONAL SPACE STATION (OCT 2012)

H.4 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (1852.232-77) (MAR 1989)

H.5 GSFC 52.211-100 CONTRACTOR PROPOSED ENHANCEMENTS (SEP 2013)

H.6 GSFC 52.219-90 SMALL BUSINESS SUBCONTRACTING PLAN AND REPORTS (NOV 2016)

H.7 GSFC 52.227-93 APPLICABILITY OF RIGHTS IN DATA – SPECIAL WORKS (MAR 2008)

H.8 GSFC 52.227-99 RIGHTS IN DATA (JUN 2012)

H.9 CLAUSES INCORPORATED BY REFERENCE -SECTION H

SECTION I - CONTRACT CLAUSES

I.1 52.202-1 DEFINITIONS (NOV 2013)

I.2 52.203-3 GRATUITIES (APR 1984)

I.3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

I.4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

I.5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

I.6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014)

I.7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

I.8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT

2010)

I.9 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS

OR STATEMENTS (JAN 2017)

1.10 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER

(MAY 2011)

I.11 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS

(OCT 2016)

I.12 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)

I.13 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)

I.14 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)

I.15 52.209-9 UPDATES OF PUBLICALLY AVAILABLE INFORMATION REGARDING RESPONSIBLY

MATTERS (JUL 2013)

I.16 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV

2015)

I.17 52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

I.18 52.215-2 AUDIT AND RECORDS - NEGOTIATION (OCT 2010)

I.19 52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997)

I.20 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA -

MODIFICATIONS (AUG 2011)

I.21 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA - MODIFICATIONS (OCT 2010)

I.22 52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)

I.23 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

I.24 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS (PRB)

OTHER THAN PENSIONS. (JUL 2005)

I.25 52.215-19 NOTIFICATIONS OF OWNERSHIP CHANGES (OCT 1997)

I.26 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN

CERTIFIED COST OR PRICING DATA - MODIFICATIONS (OCT 2010)

I.27 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS

CONCERNS (OCT 2014)

I.28 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (NOV 2016)

I.29 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2017) - ALTERNATE II (NOV 2016) .. 30

I.30 52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN (JAN 1999)

I.31 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

I.32 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

I.33 52.227-17 RIGHTS IN DATA -- SPECIAL WORKS (DEC 2007) AS MODIFIED BY 1852.227-17 (DEC

2007)

I.34 52.227-19 COMMERCIAL COMPUTER SOFTWARE LICENSE (DEC 2007) AS MODIFIED BY

1852.227-19 (JUL 1997)

I.35 52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES (OCT 2016)

I.36 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT EXCEEDING

$15,000 (MAY 2014)

I.37 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

I.38 52.222-26 EQUAL OPPORTUNITY (SEP 2016)

I.39 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT

(DEC 2010)

I.40 RESERVED

I.41 RESERVED

I.42 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

I.43 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997) -

ALTERNATE I (JUL 1995)

I.44 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

I.45 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING

(AUG 2011)

I.46 52.225-1 BUY AMERICAN - SUPPLIES (MAY 2014)

I.47 52.225-8 DUTY-FREE ENTRY (OCT 2010)

I.48 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

I.49 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

I.50 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC

2007)

I.51 52.227-11 PATENT RIGHTS - - RETENTION BY THE CONTRACTOR (MAY 2014)

I.52 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014) AS MODIFIED BY 52.227-14 ALT II (DEC

2007) AND ALT III (DEC 2007)

I.53 52.227-21 TECHNICAL DATA DECLARATION, REVISION, AND WITHHOLDING OF PAYMENT-

MAJOR SYSTEMS (MAY 2014)

I.54 52.227-23 -- RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)

I.55 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

I.56 52.232-1 PAYMENTS (APR 1984)

I.57 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

I.58 52.232-11 EXTRAS (APR 1984)

I.59 52.232-17 INTEREST (MAY 2014)

I.60 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

I.61 52.232-25 PROMPT PAYMENT (JAN 2017)

I.62 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD MANAGEMENT

(JUL 2013)

I.63 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)

I.64 52.233-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC

2013)

I.65 52.233-1 DISPUTES (MAY 2014) – ALTERNATE I (DEC 1991)

I.66 52.233-3 PROTEST AFTER AWARD (AUG 1996)

I.67 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

I.68 52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)

I.69 52.242-13 BANKRUPTCY (JUL 1995)

I.70 52.243-1 CHANGES - FIXED-PRICE (AUG 1987)

I.71 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2017)

I.72 52.246-24 LIMITATION OF LIABILITY - HIGH-VALUE ITEMS (FEB 1997)

I.73 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)

I.74 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

I.75 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

I.76 1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (AUG 2014)

I.77 1852.215-84 OMBUDSMAN (NOV 2011)

I.78 1852.219-75 INDIVIDUAL SUBCONTRACTING REPORTS (APR 2015)

I.79 1852.219-77 NASA MENTOR-PROTÉGÉ PROGRAM (APR 2015)

I.80 1852.227-11 PATENT RIGHTS - - OWNERSHIP BY THE CONTRACTOR (APRIL 2015)

I.81 1852.227-14 RIGHTS IN DATA- -GENERAL (APR 2015)

I.82 RESERVED

I.83 1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)

I.84 1852.243-71 SHARED SAVINGS (MAR 1997)

I.85 52.227-23 -- RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)

I.86 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)

I.87 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)

I.88 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

I.89 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

I.90 52.222-60 PAYCHECK TRANSPARENCY (EXECUTIVE ORDER 13673) (OCT 2016)

I.91 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I.92 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

I.93 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (DEVIATION) (FEB 2012)

I.94 CLAUSES INCORPORATED BY REFERENCE -SECTION I

(End of Section I)

SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016)

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS

K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)

K.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)

K.3 52.225-18 PLACE OF MANUFACTURE (MAR 2015)

K.4 1852.225-72 RESTRICTION ON FUNDING ACTIVITY WITH CHINA--REPRESENTATION

(DEVIATION) (FEB 2012)

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1 52.204-7 SYSTEMS FOR AWARD MANAGEMENT (OCT 2016)

L.2 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JULY 2016)

L.3 52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)

L.4 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

L.5 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

L.6 52.215-1 INSTRUCTIONS TO OFFERORS - COMPETITIVE ACQUISITION. (JAN 2017)

L.7 52.216-1 TYPE OF CONTRACT (APR 1984)

L.8 1852.227-84 PATENT RIGHTS CLAUSES (APR 2015)

L.9 1852.233-70 PROTESTS TO NASA (DEC 2015)

L.10 GSFC 52.233-2 GSFC MODIFICATION TO FAR 52.233-2 -- SERVICE OF PROTEST (SEP 2006)

L.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

L.12 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

L.13 GSFC 52.215-200 COMMUNICATIONS REGARDING THIS SOLICITATION (JAN 2014)

L.14 GSFC 52.215-201 PROPOSAL PREPARATION—GENERAL INSTRUCTIONS (APR 2016)

L.15 GSFC 52.215-203 OFFER VOLUME (MAR 2017)

L.16 GSFC 52.215-205 PROPOSAL MARKING AND DELIVERY (SEPT 2014)

L.17 LIMITED TRADEOFF (LTO) PROPOSAL INSTRUCTIONS

L.18 GSFC 52.215-227 PRICE VOLUME INSTRUCTIONS (NOV 2016)

L.19 EXHIBITS AND ENCLOSURES

L.20 PROVISIONS INCORPORATED BY REFERENCE -SECTION L

SECTION M - EVALUATION FACTORS FOR AWARD

M.1 SOURCE SELECTION AND EVALUATION FACTORS AND TRADEOFF PROCESS

M.2 LIMITED TRADEOFF (LTO) PROPOSAL EVALUATION

M.3 GSFC 52.215-327 PRICE EVALUATION FACTOR (NOV 2016)

SECTION B - SUPPLIES OR SERVICES AND PRICES

B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)

The total firm fixed price of this contract is $[TO BE PROPOSED].

(End of clause)

B.2 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (JAN 2017)

The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Statement of Work (SOW), incorporated as Attachment A.

Hardware Deliverable Schedule

Table 1

Item No.

Hardware Quantity Reference Documents

SOW

Section

Due Date Shipping Class /

Delivery Method

1 Flight Valves 8 EUROPA-PROP-

SOW-0006

EUROPA-PROP-

SPEC-0006

4.2 Within 12

months After Contract Award

(ACA)

Class III

2 Spare Flight Valve

1 EUROPA-PROP-

SOW-0006

EUROPA-PROP-

SPEC-0006

4.2 Within 12

months

ACA

3 Qualification Valve

1 EUROPA-PROP-

SOW-0006

EUROPA-PROP-

SPEC-0006

6.1.1 Within 12

months ACA, if applicable

Contract Data Requirements List

Table 2

Note: See SOW Page 52-53 for Approval Level Definitions Data Item No.

Data Item

SOW

Section Approval

Level Due Date

1 Weekly Program Status Meeting

2.2.3 I Weekly

2 Monthly Technical Status Reports

2.2.2 I Monthly

3 Anomaly Reports 7.1.3 A As required

4 Class I Changes 7.1.4 A As required

5 Waivers/ETAS Forms 7.1.4 A As required

6 GIDEP Alert Dispositioning

7.5.3 R As required

7 Kickoff Meeting 2.3.1 - Within 1 month after award

8 Kickoff Meeting Presentation

2.3.1 I 1 week prior to Kickoff Meeting

9 Program Plan 2.2.1

R Preliminary: At Kickoff Meeting Final: 1 week after Kickoff Meeting

10 Program Schedule 2.2.1

R Preliminary: At Kickoff Meeting Updates: As necessary

11 Fabrication, Assembly, and Inspection Flow Plan

4.1 A 1 week prior to Kickoff Meeting

Updates at major reviews as needed

12 Quality Plan/Manual 7.1.1 R 1 week prior to Kickoff Meeting

13 CM Plan 7.1.4 R 1 week prior to Kickoff Meeting

14 DCR Meeting 2.3.2

- Prior to start of flight valve manufacturing

15 DCR Presentation 2.3.2 I 2 weeks prior to DCR

16 DCR Report/Minutes 2.3.2 R 1 week after DCR

17 Specification Verification Matrix

1.3 A Preliminary: 2 weeks prior to DCR

Updates at each major review

18 Interface Control Document/Drawing

3.1 R 2 weeks prior to DCR

19 Drawing Package 3.2

R Review onsite at DCR Review any updates as required

20 Mechanical Model 3.3 R 2 weeks prior to DCR

21 Structural Analysis Report

3.4 A 2 weeks prior to DCR

22 Parts Stress Analysis 3.7 A 2 weeks prior to DCR

23 Worst Case Circuit Analysis Report

3.6 A 2 weeks prior to DCR

24 Radiation Hardness Analysis Report

3.8 A 2 weeks prior to DCR

25 Magnetic Field Analysis Report

3.9 A 2 weeks prior to DCR

26 FMECA Report 3.1 R 2 weeks prior to DCR

27 Thermal Analysis Report

3.5 A 2 weeks prior to DCR

28 Materials Identification and Usage List (MIUL)

5.1.1 A 2 weeks prior to DCR

Data Item No.

Data Item

SOW

Section Approval

Level Due Date

29 Planetary Protection Plan

5.4.5 A Preliminary: At kickoff meeting

Final: 2 weeks prior to DCR

30 Material Usage Agreement (MUA)

5.1.1 A 2 weeks prior to DCR

31 SCC Evaluation Form 5.1.5 A 2 weeks prior to DCR

32 Limited Life Items List 7.3.1 A 2 weeks prior to DCR

33 Contamination Control Plan

7.7.1 R 2 weeks prior to DCR

34 SOW Compliance Matrix

1.3 R 2 weeks prior to DCR

35 Qualification Test Report

6.1 A 2 weeks prior to DCR

36 QBS Report 6.1.3 A 2 weeks prior to DCR

37 Qualification TRR Meeting

2.3.5

- Prior to start of qualification testing

38 Qualification TRR Package

2.3.5 I 2 weeks prior to Qualification TRR

39 Qualification Verification Plan

6.1.4 A 2 weeks prior to Qualification TRR

40 Qualification Verification Test Procedure

6.1.4 A 2 weeks prior to Qualification TRR

41 Qualification Review

2.3.2

- Prior to start of flight valve manufacturing

42 Qualification Review Presentation

2.3.2 I 2 weeks prior to Qualification Review

43 Qualification Test Report

6.1 A 2 weeks prior to Qualification Review

44 Acceptance Verification Plan

6.2 A 2 weeks prior to Qualification Review

45 Acceptance TRR Meeting

2.3.5

- Prior to start of flight acceptance testing

46 Acceptance TRR Package

2.3.5 I 2 weeks prior to Acceptance TRR

47 Acceptance Verification Test Procedure

2.3.5 A 2 weeks prior to Acceptance TRR

48 PSR Meeting 2.3.6 - Prior to shipment of flight hardware

49 Data Delivery Package

2.3.6 A 2 weeks prior to PSR

50 As-Built Materials List

(ABML)

2.3.6 R 2 weeks prior to PSR

51 Acceptance Test Report

2.3.6 A 2 weeks prior to PSR

52 Tripped Sensor Protocol

2.3.6 R 2 weeks prior to PSR and hard copy with

shipper

NOTE: All deliverables, other than reports/documentation, are designated as Shipping

Class III. All reports/documentation deliverables specified under Clause B.2, unless specified (electronic/format, etc.), are considered Class IV and shall be shipped via the most advantageous commercial transportation means considered to be in the best interest of the

Government.

Unless otherwise specified, “day” means “calendar day”.

B.3 GSFC 52.232-99 MILESTONE PAYMENT SCHEDULE (FIXED PRICE) (NOV

2013)

(a) Subject to other limitations and conditions specified in this contract, milestone payment shall be made to the Contractor upon delivery and review, acceptance and closure by the COR of the milestone events described under paragraph (b).

(b) The payment schedule amount shall be calculated by the application of the contract percentage established per milestone event to the total fixed price amount indicated under

Section B contract clause NFS 1852.216-78, Firm-Fixed Price.

Event Qty Contract Value %

Unit Price Total Amount

Completion Determination

Kickoff Meeting 1 15 To Be Proposed

To Be Proposed

Conduct meetings in accordance with SOW. Meetings are complete when the meeting is documented with a report, and when all actions items are reviewed, accepted, and closed by the GSFC COR.

Design Conformance Review (DCR)

1 30 To Be Proposed

To Be Proposed

Design Review Completed, presentation package and actions documented and delivered. The DCR is complete when the meeting is documented with a report, and when all actions items are reviewed, accepted, and closed by the GSFC COR.

Acceptance Test Readiness Review

(ATTR)

1 20 To Be Proposed

To Be Proposed

Acceptance Test Readiness Review Completed, presentation package and actions documented and delivered. The ATTR is complete when the meeting is documented with a report, and when all actions items are reviewed, accepted, and closed by the GSFC COR.

Pre-Ship Review (PSR) 1 15 To Be Proposed

To Be Proposed

Pre-Ship Review Completed, presentation package and actions documented and delivered. The PSR is complete when the meeting is documented with a report, and when all actions items are reviewed, accepted, and closed by the GSFC COR.

Low Pressure Latch Valve flight units to meet the requirements of this SOW and the LPLV specification

9 20 To Be Proposed

To Be Proposed

Delivery of 9 flight units and one qualification unit (if applicable) meeting the requirements of the specification and statement of work.

(c) The Contractor may submit requests for payment not more frequently than monthly, in a form and manner acceptable to the Contracting Officer. Unless otherwise authorized by the

Contracting Officer, all milestone payments in any period for which payment is being requested shall be included in a single request, appropriately itemized and totaled.

(d) The Contractor shall not be entitled to payment of a request for milestones payment prior to successful accomplishment and acceptance by the Government of the milestone event. The

Contracting Officer shall determine whether the milestone event or performance criterion for which payment is requested has been successfully accomplished and accepted by the

Government in accordance with the terms of the contract. The Contracting Officer may, at any time, require the Contractor to substantiate the successful performance of any event or performance criterion which has been or is represented as being payable.

(End of Clause)

(End of Section B)

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)

The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the

Supplies and/or Services To Be Provided clause of this contract in accordance with the Statement of Work, Attachment A; and Specifications, Attachment B.

C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER

SOFTWARE (MAR 2008)

In accordance with the delivery requirements of this contract, all software data rights shall be delivered in accordance with the Rights in Data – General clause, specified elsewhere in this contract, except for the following:

NONE

C.3 GSFC 52.235-91 REPORTS OF WORK (CORE) (AUG 2013)

(a) Monthly progress reports. The Contractor shall submit monthly progress reports of all work accomplished during each month of contract performance. Reports shall address the accomplishments and progress of all work performed the month being reported. The report shall be in narrative form and brief in content. The report shall include a description of technical accomplishments and status of deliverables. Also the report shall provide a quantitative description of overall progress and identify any risks or problems, which may impede performance and proposed corrective actions. Also the report shall have a discussion of the projected work activities to be performed during the next monthly reporting period.

(b) Final Report. The Contractor shall submit a final report that summarizes the results of the entire contract including recommendations and conclusions based on the experience and results obtained. The final report should include, as appropriate, tables, graphs, diagrams, curves, sketches, photographs, and drawings in sufficient detail to comprehensively explain the results achieved under the contract.

(c) Submission. The Contractor shall submit the reports required by this clause as follows:

Copies Report Type Addressee Mail Code

1 M,F Contracting Officer (CO) 210.M

1 M,F Contracting Officer's Representative (COR) 597

[M=Monthly Report, F=Final Report]

(d) Submission dates. Monthly reports shall be submitted by the 15th day of the month following the month being reported. If the contract is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report shall be submitted within 30 days after completion of the contract.

(End of Section C)

SECTION D - PACKAGING AND MARKING

D.1 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)

D.2 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT

EQUIPMENT (JAN 2011)

(a) The Contractor shall identify all equipment to be delivered to the Government using NASA

Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard

(NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.

(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.

(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:

(1) Item Description.

(2) Unique Identification Number (License Tag).

(3) Unit Price.

(4) An explanation of the data used to make the unique identification number.

(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:

(1) Date originally placed in service.

(2) Item condition.

(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:

NASA Goddard Space Flight Center, Building 35, Code 279, Greenbelt, MD 20771

Marked for: Eric Golliher (Contracting Officer’s Representative), Code 597.0

(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.

D.3 CLAUSES INCORPORATED BY REFERENCE -SECTION D

Clause(s) D.1 at the beginning of this Section is incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.

(End of text)

(End of Section D)

SECTION E - INSPECTION AND ACCEPTANCE

E.1 52.246-2 INSPECTION OF SUPPLIES - FIXED-PRICE (AUG 1996)

E.2 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC

2014)

E.3 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

The contractor shall implement a Quality Management System that meets with the intent of the requirements of ANSI/ISO/ASQ Q9001 (2008 version) or equivalent, as documented in a Quality Assurance Plan.

Title Reference Date

Quality Assurance Plan Enclosure A Attachment D, To Be

Submitted with Proposal

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

E.4 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE

FUNCTIONS (OCT 1988)

In accordance with the Inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:

QUALITY

ASSURANCE ITEM

QA FUNCTION LOCATION

Testing Monitoring and Witnessing by

Government QA Representatives

Contractor and

Subcontractor

Facilities

Mechanical Assemblies Inspection of mechanical assemblies prior to assembly into next higher level of assembly

Contractor and

Subcontractor

Facilities

Manufacturing Process Monitoring of various manufacturing processes for compliance

Contractor and

Subcontractor

Facilities

Procedural and

Requirements

Compliance

Surveys, audits, and monitoring of compliance to procedures and requirements

Contractor and

Subcontractor

Facilities

E.5 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR 2015)

(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The form(s) shall be prepared and distributed as follows:

(1) Via mail and marked "Advance Copy", one copy each to the Contracting Officer, the

Contracting Officer's Representative (if designated in the contract), and to the cognizant

Administrative Contracting Officer, if any.

(2) Via mail, the original and 1 copy (unfolded) to the shipment address (delivery point) specified in Section F of this contract. Mark the exterior of the envelope "CONTAINS

DD FORM 250". This must arrive prior to the shipment.

(3) With shipment in waterproof envelope (one copy) for the consignee.

(4) If the shipment address is not directly to the Goddard Space Flight Center (Greenbelt) or GSFC/Wallops Flight Facility (Wallops) central receiving areas, then one copy of the

DD Form 250 must be provided (via mail) to one on the following addresses depending upon whether this contract is with GSFC Greenbelt or GSFC/WFF Wallops:

Receiving and Inspection (Code 279), Goddard Space Flight Center, Greenbelt, MD

20771.

Receiving and Inspection (Bldg. F16), Wallops Flight Facility, Wallops Island VA

23337.

(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement

1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.

(c) When more than one package is involved in a shipment, the Contractor shall list on the DD

Form 250, as additional information, the quantity of packages and the package numbers. The

Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words "CONTAINS DD FORM 250" on the package.

E.6 GSFC 52.246-93 ACCEPTANCE LOCATION(S) (APR 2008)

The Contracting Officer or authorized representative will accomplish acceptance at the

NASA/Goddard Space Flight Center.

Authorized:

Item Location Representative

1,2, 3 NASA/GSFC Contracting Officer’s Representative (COR)

Code 597

The Contracting Officer reserves the right to designate other Government agents as authorized representatives. The Contractor will be notified by a written notice or by a copy of the delegation letter if other agents are authorized.

If this is a fixed price type contract, acceptance shall be deemed to have occurred constructively--for the sole purpose of computing an interest penalty that might be due the Contractor under the

Prompt Payment Act--on the 30th day after the Contractor has delivered the supplies or services in accordance with the terms and conditions of the contract. In the event that actual acceptance occurs within the constructive acceptance period, the determination of an interest penalty shall be based on the date of the actual acceptance.

E.7 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT NOT

REQUIRED (APR 1989)

NASA FAR Supplement clause 1852.246-72 of this contract requires the furnishing of a Material

Inspection and Receiving Report (MIRR) (DD Form 250 series) at the time of each delivery under this contract. However, a MIRR is not required for the following deliverable items:

paper/electronic deliverables (i.e. reports).

E.8 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)

The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.

E.9 CLAUSES INCORPORATED BY REFERENCE -SECTION E

Clause(s) E.1 - E.2 at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses

(End of Section E)

SECTION F - DELIVERIES AND PERFORMANCE

F.1 52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

F.2 52.242-15 STOP-WORK ORDER (AUG 1989)

F.3 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

F.4 52.247-34 F.O.B. DESTINATION (JAN 1991)

F.5 1852.247-72 ADVANCE NOTICE OF SHIPMENT (OCT 1988)

Two (2) weeks prior to Pre-Ship Review (PSR), for any hardware deliverable item(s), the

Contractor shall furnish the anticipated shipment date, bill of lading number (if applicable), and carrier identity to Eric Golliher/597 and to the Contracting Officer.

F.6 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING (FEB

2016)

Shipments of the items required under this contract shall be to:

Receiving Officer

Goddard Space Flight Center

Building 35, Code 279

Greenbelt, MD 20771

Marked for:

Technical Officer: Eric Golliher, Code 597

Building: 11

Room: E123

Contract No.: TBD

Item(s) No.: TBD

Compliance with this clause is necessary to assure verification of delivery and acceptance and prompt payment.

If this is a fixed price type contract, delivery--for purposes of the Prompt Payment Act--must be through the above shipping address unless another location has been authorized by the

Contracting Officer. If delivery is made to other than the Receiving Officer listed above and shipment to that other location has not been authorized by the Contracting Officer, a delivery for the purposes of the Prompt Payment Act has not occurred and no interest penalty under the Act shall result. Shipment to other than Receiving Officer listed above will be construed as contract noncompliance.

F.7 CLAUSES INCORPORATED BY REFERENCE -SECTION F

Clause(s) F.1 - F.4 at the beginning of this Section are incorporated by reference, with the same require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding

(End of Section F)

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

G.2 1852.227-70 NEW TECHNOLOGY – OTHER THAN A SMALL BUSINESS FIRM

OR NON-PROFIT ORGANIZATION (APR 2015)

G.3 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE

AND PATENT REPRESENTATIVE (APR 2015)

G.4 1852.227-86 COMMERICAL COMPUTER SOFTWARE - - LICENSING (APR

2015)

G.5 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)

G.6 GSFC 52.232-95 INVOICES - SUBMISSION OF (AUG 2016)

Invoices shall be prepared in accordance with the Prompt Payment clause of this contract and submitted to the NASA Shared Services Center (NSSC), Financial Management Division (FMD)

– Accounts Payable, Bldg 1111, Jerry Hlass Road, Stennis Space Center, MS 39529, Email:

NSSC-AccountsPayable@nasa.gov. For purposes of the Prompt Payment Act, the above office is considered to be the "Designated Billing Office" and the "Designated Payment Office".

Note: Invoices must contain an invoice date in order for an invoice to be considered “Proper.”

Invoices without an invoice date will be deemed to be “Improper” and will be rejected by the

NSSC.

G.7 CLAUSES INCORPORATED BY REFERENCE -SECTION G

Clause(s) G.1 - G.5 at the beginning of this Section are incorporated by reference, with the same require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding

(End of Section G) mailto:NSSC-AccountsPayable@nasa.gov

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)

H.2 1852.225-70 EXPORT LICENSES (FEB 2000)

H.3 1852.228-78 CROSS-WAIVER OF LIABILITY FOR SCIENCE OR SPACE

EXPLORATION ACTIVITIES UNRELATED TO THE INTERNATIONAL

SPACE STATION (OCT 2012)

(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR Parts 120 through 130, and the Export Administration Regulations (EAR), 15 CFR Parts 730 through 799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.

(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at Goddard Space Flight Center where the foreign person will have access to export-controlled technical data or software.

(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.

(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.

H.4 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (1852.232-77) (MAR

1989)

(a) Of the total price of the total price of the basic effort, the sum of $ TO BE DETERMINED is presently available for payment and allotted to this contract. It is anticipated that from time to time additional funds will be allocated to the contract in accordance with the following schedule, until the total price of said item is allotted:

SCHEDULE FOR ALLOTMENT OF FUNDS

Date Amounts

UPON AVAILABILITY OF FUNDS

(b) The Contractor agrees to perform or have performed work on the items specified in paragraph (a) above up to the point at which, if this contract is terminated pursuant to the

Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) if that clause would, in the exercise of reasonable judgment by the

Contractor, approximate the total amount at the time allotted to the contract. The Contractor is not obligated to continue performance of the work beyond that point. The Government is not obligated in any event to pay or reimburse the Contractor more than the amount from time to time allotted to the contract, anything to the contrary in the Termination for Convenience of the

Government clause notwithstanding.

(c) (1) It is contemplated that funds presently allotted to this contract will cover the work to be performed until To Be Determined.

(2) If funds allotted are considered by the Contractor to be inadequate to cover the work to be performed until that date, or an agreed date substituted for it, the Contractor shall notify the

Contracting Officer in writing when within the next 60 days the work will reach a point at which, if the contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause will approximate 75 percent of the total amount then allotted to the contract.

(3) (i) The notice shall state the estimated date when the point referred to in subparagraph (2) above will be reached and the estimated amount of additional funds required to continue performance to the date specified in subparagraph (1) above, or an agreed date substituted for it.

(ii) The Contractor shall, 60 days in advance of the date specified in subparagraph (1) above, or an agreed date substituted for it, advise the Contracting Officer in writing as to the estimated amount of additional funds required for the timely performance of the contract for a further period as may be specified in the contract or otherwise agreed to by the parties.

(4) If, after the notification referred to in subdivision (3)(ii) above, additional funds are not allotted by the date specified in subparagraph (1) above, or an agreed date substituted for it, the Contracting Officer shall, upon the Contractor's written request, terminate this contract on that date or on the date set forth in the request, whichever is later, pursuant to the Termination for Convenience of the Government clause.

(d) When additional funds are allotted from time to time for continued performance of the work under this contract, the parties shall agree on the applicable period of contract performance to be covered by these funds. The provisions of paragraphs (b) and (c) above shall apply to these additional allotted funds and substituted date pertaining to them, and the contract shall be modified accordingly.

(e) If, solely by reason of the Government's failure to allot additional funds in amounts sufficient for the timely performance of this contract, the Contractor incurs additional costs or is delayed in the performance of the work under this contract, and if additional funds are allotted, an equitable adjustment shall be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the items to be delivered, or in the time of delivery or both.

(f) The Government may at any time before termination, and, with the consent of the Contractor, after notice of termination, allot additional funds for this contract.

(g) The provisions of this clause with respect to termination shall in no way be deemed to limit the rights of the Government under the Default clause of this contract. The provisions of this

Limitation of Funds clause are limited to the work on and allotment of funds for the items set forth in paragraph (a) above. This clause shall become inoperative upon the allotment of funds for the total price of said work except for rights and obligations then existing under this clause.

(h) Nothing in this clause shall affect the right of the Government to terminate this contract pursuant to the Termination for Convenience of the Government clause of this contract.

H.5 GSFC 52.211-100 CONTRACTOR PROPOSED ENHANCEMENTS (SEP 2013)

The Contractor shall provide the enhancements that are described in Attachment C. These enhancements, which are over and above the requirements required by the contract terms and conditions, Statement of Work and other contract attachments, were proposed by the Contractor in the proposal submitted in response to the Request for Proposal (RFP) 80GSFC18R0004 for

Europa Low Pressure Latch Valve. The incorporation of these enhancements does not relieve the Contractor from the responsibilities of meeting all other contract terms and conditions and requirements in the Statement of Work and other contract attachments. The Contractor shall perform these enhancements on all work performed, unless specifically waived by the

Contracting Officer in writing.

H.6 GSFC 52.219-90 SMALL BUSINESS SUBCONTRACTING PLAN AND

REPORTS (NOV 2016)

a. Subcontracting Plan (Contractor)

FAR clause 52.219-9, "Small Business Subcontracting Plan", is included in this contract. The agreed to Subcontracting Plan required by the clause is included as an attachment to the contract.

b. Subcontracting Plan (Subcontractors)

In accordance with FAR clause 52.219-9 Small Business Subcontracting Plan, the Contractor must require that certain subcontractors adopt a plan similar to the Plan agreed to between the

Contractor and the Government.

c. Individual Subcontract Reports (ISRs)

The Contractor shall prepare and submit their Individual Subcontract Reports (ISRs) (formerly known as the Standard Form 294), in accordance with the instructions listed in the Electronic

Subcontract Reporting System (eSRS), available at http://esrs.gov.

ISRs must be submitted electronically in eSRS on a semi-annual basis. This report must be received no later than April 30 and October 30 each year for the reporting periods ending March

31 and September 30, respectively. Reports are required when due, regardless of whether there has been any subcontracting activity since the inception of the contract or since the last reporting period.

A final ISR must be submitted after contract completion. The final ISR submittal must be received no later than the due date for what would have been the next semi-annual report.

d. Summary Subcontract Reports (SSRs)

The Contractor shall prepare and submit Summary Subcontract Reports (SSRs) (formerly known as the Standard Form 295), in accordance with the instructions listed in the eSRS, available at http://esrs.gov and in accordance with FAR clause 52.219-9 Small Business Subcontracting Plan of this contract.

The SSRs must be submitted electronically in eSRS on an annual basis. This report must be submitted no later than October 30 each year for the twelve month period ending September 30.

e. Subcontractor Reporting

FAR clause 52.219-9 Small Business Subcontracting Plan requires that the Contractor ensure that ISR and SSR reports are submitted by those subcontractors that have been required to adopt a Subcontracting Plan under the terms of the clause. These subcontractor reports must be submitted as required by paragraphs (c) and (d) above. The reports may be submitted through the Contractor or submitted directly. Regardless, the Contractor is responsible for ensuring proper and timely submittal of the required reports.

H.7 GSFC 52.227-93 APPLICABILITY OF RIGHTS IN DATA – SPECIAL WORKS

(MAR 2008)

The "Rights in Data - Special Works" clause of this contract applies to the following aspects (or items):

Any data negotiated by the parties to be delivered with unlimited rights.

H.8 GSFC 52.227-99 RIGHTS IN DATA (JUN 2012)

The default Data Rights clause under this contract is FAR 52.227-14 RIGHTS IN DATA-

GENERAL—Alternate II and Alternate III as modified by NASA FAR Supplement 1852.227-14 and GSFC 52.227-90. Any exceptions to this clause will be covered by FAR 52.227-17

RIGHTS IN DATA--SPECIAL WORKS as modified by NASA FAR Supplement 1852.227-17, if applicable, and GSFC 52.227-93.

H.9 CLAUSES INCORPORATED BY REFERENCE -SECTION H

Clause(s) H.1 - H.2 at the beginning of this Section are incorporated by reference, with the same require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses

(End of Section H)

SECTION I - CONTRACT CLAUSES

I.1 52.202-1 DEFINITIONS (NOV 2013)

I.2 52.203-3 GRATUITIES (APR 1984)

I.3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

I.4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE

GOVERNMENT (SEP 2006)

I.5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

I.6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR

ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

I.7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014)

I.8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN

FEDERAL TRANSACTIONS (OCT 2010)

I.9 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)

1.10 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER

CONTENT PAPER (MAY 2011)

I.11 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (OCT 2016)

I.12 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)

I.13 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE (JUL 2016)

I.14 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR

PROPOSED FOR DEBARMENT (OCT 2015)

I.15 52.209-9 UPDATES OF PUBLICALLY AVAILABLE INFORMATION

REGARDING RESPONSIBLY MATTERS (JUL 2013)

I.16 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (NOV 2015)

I.17 52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

I.18 52.215-2 AUDIT AND RECORDS - NEGOTIATION (OCT 2010)

I.19 52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT

1997)

I.20 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR

PRICING DATA - MODIFICATIONS (AUG 2011)

I.21 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA -

MODIFICATIONS (OCT 2010)

I.22 52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)

I.23 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

I.24 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR

POSTRETIREMENT BENEFITS (PRB) OTHER THAN PENSIONS. (JUL 2005)

I.25 52.215-19 NOTIFICATIONS OF OWNERSHIP CHANGES (OCT 1997)

I.26 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND

DATA OTHER THAN CERTIFIED COST OR PRICING DATA -

MODIFICATIONS (OCT 2010)

I.27 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE

SMALL BUSINESS CONCERNS (OCT 2014)

I.28 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (NOV 2016)

I.29 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2017) -

ALTERNATE II (NOV 2016)

I.30 52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN (JAN 1999)

I.31 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

I.32 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

I.33 52.227-17 RIGHTS IN DATA -- SPECIAL WORKS (DEC 2007) AS MODIFIED

BY 1852.227-17 (DEC 2007)

I.34 52.227-19 COMMERCIAL COMPUTER SOFTWARE LICENSE (DEC 2007) AS

MODIFIED BY 1852.227-19 (JUL 1997)

I.35 52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND

REMEDIES (OCT 2016)

I.36 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND

EQUIPMENT EXCEEDING $15,000 (MAY 2014)

I.37 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

I.38 52.222-26 EQUAL OPPORTUNITY (SEP 2016)

I.39 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (DEC 2010)

I.40 RESERVED

I.41 RESERVED

I.42 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

I.43 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL

SAFETY DATA (JAN 1997) - ALTERNATE I (JUL 1995)

I.44 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

I.45 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT

MESSAGING WHILE DRIVING (AUG 2011)

I.46 52.225-1 BUY AMERICAN - SUPPLIES (MAY 2014)

I.47 52.225-8 DUTY-FREE ENTRY (OCT 2010)

I.48 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

I.49 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

I.50 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT (DEC 2007)

I.51 52.227-11 PATENT RIGHTS - - RETENTION BY THE CONTRACTOR (MAY

I.52 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014) AS MODIFIED BY

52.227-14 ALT II (DEC 2007) AND ALT III (DEC 2007)

I.53 52.227-21 TECHNICAL DATA DECLARATION, REVISION, AND

WITHHOLDING OF PAYMENT-MAJOR SYSTEMS (MAY 2014)

I.54 52.227-23 -- RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)

I.55 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

I.56 52.232-1 PAYMENTS (APR 1984)

I.57 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

I.58 52.232-11 EXTRAS (APR 1984)

I.59 52.232-17 INTEREST (MAY 2014)

I.60 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

I.61 52.232-25 PROMPT PAYMENT (JAN 2017)

I.62 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR

AWARD MANAGEMENT (JUL 2013)

I.63 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE

2013)

I.64 52.233-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (DEC 2013)

I.65 52.233-1 DISPUTES (MAY 2014) – ALTERNATE I (DEC 1991)

I.66 52.233-3 PROTEST AFTER AWARD (AUG 1996)

I.67 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT

2004)

I.68 52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)

I.69 52.242-13 BANKRUPTCY (JUL 1995)

I.70 52.243-1 CHANGES - FIXED-PRICE (AUG 1987)

I.71 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2017)

I.72 52.246-24 LIMITATION OF LIABILITY -…

This is the start of the file's text. The full file is on GovTribe.