SOLICITATION #80GSFC18R0025
Table of Contents
SECTION B - SUPPLIES OR SERVICES AND PRICES
B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)
B.2 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (JAN 2017)
B.3 GSFC 52.217-91 OPTION FOR INCREASED QUANITITY (SEP 2013)
B.4 GSFC 52.232-99 MILESTONE PAYMENT SCHEDULE (FIXED PRICE) (NOV 2013)
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)
C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER SOFTWARE (MAR 2008)
C.3 GSFC 52.235-91 REPORTS OF WORK (CORE) (AUG 2013)
SECTION D - PACKAGING AND MARKING
D.1 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)
D.2 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (JAN 2011)
D.3 CLAUSES INCORPORATED BY REFERENCE -SECTION D
SECTION E - INSPECTION AND ACCEPTANCE
E.1 52.246-2 INSPECTION OF SUPPLIES - FIXED-PRICE (AUG 1996)
E.2 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
E.3 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
E.4 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS (OCT 1988)
E.5 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR 2015)
E.6 GSFC 52.246-93 ACCEPTANCE LOCATION(S) (APR 2008)
E.7 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT NOT REQUIRED (APR 1989) .. 19
E.8 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
E.9 CLAUSES INCORPORATED BY REFERENCE -SECTION E
SECTION F - DELIVERIES AND PERFORMANCE
F.2 52.242-15 STOP-WORK ORDER (AUG 1989)
F.4 52.247-34 F.O.B. DESTINATION (JAN 1991)
F.5 1852.247-72 ADVANCE NOTICE OF SHIPMENT (OCT 1988)
F.6 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING (FEB 2016)
F.7 CLAUSES INCORPORATED BY REFERENCE -SECTION F
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC
2014) 23
G.2 1852.227-70 NEW TECHNOLOGY – OTHER THAN A SMALL BUSINESS FIRM OR NON-PROFIT
ORGANIZATION (APR 2015)
G.3 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT
REPRESENTATIVE (APR 2015)
G.4 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
G.5 GSFC 52.232-95 INVOICES - SUBMISSION OF (AUG 2016)
G.6 CLAUSES INCORPORATED BY REFERENCE -SECTION G
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)
H.2 1852.225-70 EXPORT LICENSES (FEB 2000)
H.3 1852.228-78 CROSS-WAIVER OF LIABILITY FOR SCIENCE OR SPACE EXPLORATION ACTIVITIES
UNRELATED TO THE INTERNATIONAL SPACE STATION (OCT 2012)
H.4 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (TBD)
H.5 GSFC 52.211-100 CONTRACTOR PROPOSED ENHANCEMENTS (SEP 2013)
H.6 GSFC 52.227-93 APPLICABILITY OF RIGHTS IN DATA – SPECIAL WORKS (MAR 2008)
H.7 GSFC 52.227-99 RIGHTS IN DATA (JUN 2012)
H.8 CLAUSES INCORPORATED BY REFERENCE -SECTION H
SECTION I - CONTRACT CLAUSES
I.1 52.202-1 DEFINITIONS (NOV 2013)
I.2 52.203-3 GRATUITIES (APR 1984)
I.3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I.4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
I.5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
I.6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER
ACTIVITY (MAY 2014)
I.7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
I.8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT
2010) 28
I.10 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR
STATEMENTS (JAN 2017)
I.11 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY
2011) 28
I.12 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS
(OCT 2016)
I.14 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
I.15 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
I.16 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)
I.17 52.209-9 UPDATES OF PUBLICALLY AVAILABLE INFORMATION REGARDING RESPONSIBLY
MATTERS (JUL 2013)
I.18 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV
2015) 29
I.19 52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
I.20 52.215-2 AUDIT AND RECORDS - NEGOTIATION (OCT 2010)
I.21 52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997)
I.23 52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)
I.27 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS
CONCERNS (OCT 2014)
I.28 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
I.29 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)
I.30 52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES (OCT 2016)
I.31 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT EXCEEDING
$15,000 (MAY 2014)
I.32 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
I.33 52.222-26 EQUAL OPPORTUNITY (SEP 2016)
I.34 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT
(DEC 2010)
I.36 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)
I.37 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
I.38 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING
(AUG 2011)
I.40 52.225-8 DUTY-FREE ENTRY (OCT 2010)
I.41 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
I.42 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
I.43 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC
2007) 30
I.44 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014) AS MODIFIED BY 52.227-14 ALT II (DEC 2007)
AND ALT III (DEC 2007)
I.45 52.227-17 RIGHTS IN DATA -- SPECIAL WORKS (DEC 2007) AS MODIFIED BY 1852.227-17 (JUL
1997) 30
I.46 52.227-21 TECHNICAL DATA DECLARATION, REVISION, AND WITHHOLDING OF PAYMENT-
MAJOR SYSTEMS (MAY 2014)
I.47 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
I.48 52.232-1 PAYMENTS (APR 1984)
I.49 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
I.50 52.232-11 EXTRAS (APR 1984)
I.51 52.232-17 INTEREST (MAY 2014)
I.52 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
I.53 52.232-25 PROMPT PAYMENT (JAN 2017)
I.54 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD MANAGEMENT
(JUL 2013)
I.55 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)
I.56 52.233-1 DISPUTES (MAY 2014) – ALTERNATE I (DEC 1991)
I.57 52.233-3 PROTEST AFTER AWARD (AUG 1996)
I.58 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
I.59 52.233-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC
2013) 30
I.60 52.242-13 BANKRUPTCY (JUL 1995)
I.61 52.243-1 CHANGES - FIXED-PRICE (AUG 1987)
I.63 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2017)
I.64 52.246-24 LIMITATION OF LIABILITY - HIGH-VALUE ITEMS (FEB 1997)
I.65 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012) . 31
I.66 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)
I.67 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
I.68 1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (AUG 2014)
I.69 1852.215-84 OMBUDSMAN (NOV 2011)
I.70 1852.227-11 PATENT RIGHTS - - OWNERSHIP BY THE CONTRACTOR (APRIL 2015)
I.71 1852.227-14 RIGHTS IN DATA- -GENERAL (APR 2015)
I.72 1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)
I.73 52.227-23 -- RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)
I.74 52.217-7 OPTION FOR INCREASED QUANTITY - SEPARATELY PRICED LINE ITEM (MAR 1989)
I.75 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)
I.76 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
I.77 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)
I.78 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I.79 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
I.80 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (DEVIATION) (FEB 2012)
I.81 CLAUSES INCORPORATED BY REFERENCE -SECTION I
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016)
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)
K.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
K.3 52.225-18 PLACE OF MANUFACTURE (MAR 2015)
K.4 1852.225-72 RESTRICTION ON FUNDING ACTIVITY WITH CHINA--REPRESENTATION (DEVIATION)
(FEB 2012)
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 52.204-7 SYSTEMS FOR AWARD MANAGEMENT (OCT 2016)
L.2 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JULY 2016)
L.3 52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)
L.4 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
L.5 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
L.8 1852.227-84 PATENT RIGHTS CLAUSES (APR 2015)
L.9 1852.233-70 PROTESTS TO NASA (DEC 2015)
L.10 GSFC 52.233-2 GSFC MODIFICATION TO FAR 52.233-2 -- SERVICE OF PROTEST (SEP 2006)
L.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
L.12 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
L.13 GSFC 52.215-200 COMMUNICATIONS REGARDING THIS SOLICITATION (JAN 2014)
L.14 GSFC 52.215-201 PROPOSAL PREPARATION—GENERAL INSTRUCTIONS (APR 2016)
L.15 GSFC 52.215-203 OFFER VOLUME (MAR 2017)
L.16 GSFC 52.215-205 PROPOSAL MARKING AND DELIVERY (SEPT 2014)
L.17 LIMITED TRADEOFF (LTO) PROPOSAL INSTRUCTIONS
L.18 GSFC 52.215-227 PRICE VOLUME INSTRUCTIONS (NOV 2016)
L.19 PROVISIONS INCORPORATED BY REFERENCE -SECTION L
SECTION M - EVALUATION FACTORS FOR AWARD
M.1 SOURCE SELECTION AND EVALUATION FACTORS AND TRADEOFF PROCESS
M.2 LIMITED TRADEOFF (LTO) PROPOSAL EVALUATION
M.3 GSFC 52.215-327 PRICE EVALUATION FACTOR (NOV 2016)
SECTION B - SUPPLIES OR SERVICES AND PRICES
B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)
The total firm fixed price of this contract is $[TO BE PROPOSED].
(End of clause)
B.2 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (JAN 2017)
The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Statement of Work (SOW), incorporated as Attachment A.
Deliverable Item List Schedule (DILS)
Table 1
Pressurant Tank
Item
No.
Description Reference Quantity
Delivery
Date
Shipping
Class /
Delivery
Method
Two (2) COPV Flight Units
EUROPA-PROP-SOW-0008,
EUROPA-PROP-SPEC-0008
18 months
After
Contract
Award
(ACA)
Class III
One (1) COPV spare unit months
ACA
Bioassay samples
Per SOW Per SOW
Contract Data Requirements List (CDRL)
Table 2
Data Item SOW
Section
Approval
Level
Due Date
Weekly Program Status
Meeting
2.2 I Weekly
Monthly Technical Status
Reports
2.2 I Monthly
Anomaly Reports 7.1.3 A As required
Class I MRBs 7.1.4 A As required
Waivers/ETAS Forms 6.5.1 A As required
GIDEP Alert
Dispositioning
7.5.1 R As required
Kick-off Meeting 2.4.1 - Within 1 month after award
SOW Compliance Matrix 1.3 A Preliminary: At Kickoff Meeting
Final: 1 week after Kickoff Meeting
Spec Compliance Matrix 1.4 A Preliminary: At Kickoff Meeting
Final: 1 week after Kickoff Meeting
Kickoff Meeting
Presentation
2.4.1 I 1 week prior to Kickoff Meeting
Fabrication, Assembly, and
Inspection Flow Plan
4.1 A 1 week prior to Kickoff Meeting
Updates at major reviews as needed
Quality Plan/Manual Error!
Reference source not found.
R 1 week prior to Kickoff Meeting
CM Plan 7.1.4 R 1 week prior to Kickoff Meeting
DCR Meeting 2.4.2 Prior to start of flight COPV manufacturing
DCR Presentation 2.3.2 I 2 weeks prior to DCR
DCR Report/Minutes 2.3.3 R 1 week after DCR
Specification Verification
Matrix Error!
Reference source not found.
A Preliminary: 2 weeks prior to DCR
Updates at each major review
Interface Control
Document/Drawing
3.1 R 2 weeks prior to DCR
Drawing Package 3.2 R Review onsite at DCR
Review any updates as required
Mechanical Model 3.3 R 2 weeks prior to DCR
Structural Analysis Report 3.4 A 2 weeks prior to DCR
FMECA Report 3.5 R 2 weeks prior to DCR
Materials Identification and Usage List (MIUL)
5.1 A 2 weeks prior to DCR
Preliminary Planetary
Protection Plan Error!
Reference source not found.
A Preliminary: At Kickoff Meeting
Final: 2 weeks prior to DCR
Material Usage Agreement
(MUA)
5.1.3, 5.1.5, 5.3.5
A 2 weeks prior to DCR, if applicable
SCC Evaluation Form 5.1.5 A 2 weeks prior to DCR, if applicable
Limited Life Items List 7.3.1 A 2 weeks prior to DCR, if applicable
Contamination Control
Plan
7.7.1 R 2 weeks prior to DCR
Planetary Protection Plan Error!
Reference source not found.
A 2 weeks prior to DCR
SOW Compliance Matrix Error!
Reference source not found.
R 2 weeks prior to DCR
QBS Report 6.1.3 A 2 weeks prior to DCR
Qualification TRR
Meeting
2.4.3 - Prior to start of qualification testing
Qualification TRR
Package
2.3.5 I 2 weeks prior to Qualification TRR
Qualification Verification
Plan
6.1.4 A 2 weeks prior to Qualification TRR
Qualification Verification
Test Procedure
6.1.4 A 2 weeks prior to Qualification TRR
Qualification Review 2.4.1 - Prior to start of flight COPV manufacturing
Qualification Review
Presentation
2.4.1 I 2 weeks prior to Qualification Review
Qualification Test Report 6.1.2 A 2 weeks prior to Qualification Review
Acceptance Verification
Plan
6.2 A 2 weeks prior to Qualification Review
Acceptance TRR Meeting Error!
Reference source not found.
- Prior to start of flight acceptance testing
Acceptance TRR Package Error!
Reference source not found.
I 2 weeks prior to Production TRR
Acceptance Verification
Test Procedure
Error!
Reference source not found.
A 2 weeks prior to Production TRR
PSR Meeting Error!
Reference source not found.
- Prior to shipment of flight hardware
Data Delivery Package Error!
Reference source not found.
A 2 weeks prior to PSR
As-Built Materials List
(ABML)
Error!
Reference source not found.
R 2 weeks prior to PSR
Acceptance Test Report Error!
Reference source not found.
A 2 weeks prior to PSR
Tripped Sensor Protocol Error!
Reference source not found.
R 2 weeks prior to PSR and hard copy with shipper
Material Inspection and
Receiving Reports (MIRR)
(DD Form 250)
Section E
NFS
1852.246-
Section E
GSFC
52.246-94
At time of
Delivery
Hard Copy/CO, COR, and Receiving & Inspection
Reporting of Inventions
Section G
NFS
1852.227-
Interim
Reports
Every 12
Months (or sooner to preserve
Electronic or Hard Copy Format/New Technology
Representative or Patent Representative
Patent
Rights) and
Final Report within 3
Months after
Contract
Completion
Safety & Health Reporting
Section H
NFS
1852.223-
As Required NASA Mishap Information System (NMIS)
Reports of Work
Section C
GSFC
52.235-91
As Required in Clause
GSFC
52.235-91
As specified in Clause
GSFC 52.235-91
Equal Opportunity Reports
Section I
FAR
52.222-26
As Specified by FAR
52.222-26
Electronic Format/CO & Code 120
Reporting of Inventions
Section G
NFS
1852.227-
Interim
Reports
Every 12
Months (or sooner to preserve
Patent
Rights) and
Final Report within 3
Months after
Contract
Completion
Electronic or Hard Copy Format/New Technology
Representative or Patent Representative
Safety & Health Reporting
Section H
NFS
1852.223-
As Required NASA Mishap Information System (NMIS)
Reports of Work
Section C
GSFC
52.235-91
As Required in Clause
GSFC
52.235-91
As specified in Clause
GSFC 52.235-91
Equal Opportunity Reports
Section I
FAR
52.222-26
As Specified by FAR
52.222-26
Electronic Format/CO & Code 120
NOTE: All reports/documentation deliverables specified under Clause B.2, unless specified
(electronic/format, etc.), are considered Class IV and shall be shipped via the most advantageous commercial transportation means considered to be in the best interest of the
Government.
Unless otherwise specified, “day” means “calendar day”.
B.3 GSFC 52.217-91 OPTION FOR INCREASED QUANITITY (SEP 2013)
In accordance with the Option for Increased Quantity--Separately Priced Line Item clause of this contract, the Government may increase the quantity of items as follows:
(End of Text)
B.4 GSFC 52.232-99 MILESTONE PAYMENT SCHEDULE (FIXED PRICE) (NOV
2013)
(a) Subject to other limitations and conditions specified in this contract, milestone payment shall be made to the Contractor upon delivery and acceptance of the milestone events described under paragraph (b).
(b) The payment schedule amount shall be calculated by the application of the contract percentage established per milestone event to the total fixed price amount indicated under
Section B contract clause NFS 1852.216-78, Firm-Fixed Price.
(c) The Contractor may submit requests for payment not more frequently than monthly, in a form and manner acceptable to the Contracting Officer. Unless otherwise authorized by the
Contracting Officer, all milestone payments in any period for which payment is being requested shall be included in a single request, appropriately itemized and totaled.
(d) The Contractor shall not be entitled to payment of a request for milestones payment prior to successful accomplishment and acceptance by the Government of the milestone event. The
Contracting Officer shall determine whether the milestone event or performance criterion for which payment is requested has been successfully accomplished and accepted by the
Government in accordance with the terms of the contract. The Contracting Officer may, at any time, require the Contractor to substantiate the successful performance of any event or performance criterion which has been or is represented as being payable.
Item
No.
Event Qty Contract
Value %
Unit
Price
Total
Amount
Completion Determination
8 Kickoff Meeting 1 10 To Be
Proposed
To Be
Proposed
Meeting completed, presentation package and actions documented and delivered.
15 Design Conformance
Review (DCR)
1 30 To Be
Proposed
To Be
Proposed
Design Review Completed, presentation package and actions documented and delivered.
2 Acceptance Test Readiness
Review
1 30 To Be
Proposed
To Be
Proposed
Meeting completed, presentation package and actions documented and delivered.
53 Data Delivery Package 1 10 To Be
Proposed
To Be
Proposed
Delivery of end-item acceptance package
3 COPV Flight and Spare
Units
3 20 To Be
Proposed
To Be
Proposed
Delivery of two flight tanks and one spare tank meeting requirements of Spec and SOW
(End of Clause)
(END OF SECTION B)
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)
The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the
Supplies and/or Services To Be Provided clause of this contract in accordance with the Statement of Work, Attachment A; and Specifications, Attachment B.
C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER
SOFTWARE (MAR 2008)
In accordance with the delivery requirements of this contract, all software data rights shall be delivered in accordance with the Rights in Data – General clause, specified elsewhere in this contract, except for the following:
NONE
C.3 GSFC 52.235-91 REPORTS OF WORK (CORE) (AUG 2013)
(a) Monthly progress reports. The Contractor shall submit monthly progress reports of all work accomplished during each month of contract performance. Reports shall address the accomplishments and progress of all work performed the month being reported. The report shall be in narrative form and brief in content. The report shall include a description of technical accomplishments and status of deliverables. Also the report shall provide a quantitative description of overall progress and identify any risks or problems, which may impede performance and proposed corrective actions. Also the report shall have a discussion of the projected work activities to be performed during the next monthly reporting period.
(b) Final Report. The Contractor shall submit a final report that summarizes the results of the entire contract, including recommendations and conclusions based on the experience and results obtained. The final report should include, as appropriate, tables, graphs, diagrams, curves, sketches, photographs, and drawings in sufficient detail to comprehensively explain the results achieved under the contract.
(c) Submission. The Contractor shall submit the reports required by this clause as follows:
Copies Report Type Addressee Mail Code
1 M,F Contracting Officer (CO) 210.M
1 M,F Contracting Officer's Representative (COR) 597
[M=Monthly Report, F=Final Report]
(d) Submission dates. Monthly reports shall be submitted by the 15th day of the month following the month being reported. If the contract is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report shall be submitted within 30 days after completion of the contract.
(END OF SECTION C)
SECTION D - PACKAGING AND MARKING
D.1 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)
D.2 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT
EQUIPMENT (JAN 2011)
(a) The Contractor shall identify all equipment to be delivered to the Government using NASA
Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard
(NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:
NASA Goddard Space Flight Center, Building 35, Code 279, Greenbelt, MD 20771
Marked for: Eric Cardiff (Contracting Officer’s Representative), Code 597.0
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
D.3 CLAUSES INCORPORATED BY REFERENCE -SECTION D
Clause(s) D.1 at the beginning of this Section is incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
(End of text)
(END OF SECTION D)
SECTION E - INSPECTION AND ACCEPTANCE
E.1 52.246-2 INSPECTION OF SUPPLIES - FIXED-PRICE (AUG 1996)
E.2 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC
2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
The contractor shall implement a Quality Management System that meets with the intent of the requirements of ANSI/ISO/ASQ Q9001 (2008 version) or equivalent, as documented in a Quality Assurance Plan.
Title Reference Date
Quality Assurance Plan Attachment C To Be Submitted with
Proposal
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
E.3 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
E.4 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE
FUNCTIONS (OCT 1988)
In accordance with the Inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:
QUALITY ASSURANCE ITEM QA FUNCTION LOCATION
Surface condition of the tank prior to winding Visual inspection Contractor and Subcontractor
Facilities Completion of winding Visual inspection Contractor and Subcontractor
Facilities Magnetic field test Perform the Test Contractor and Subcontractor
Facilities
Final inspection of the damage coating prior to shipping Visual and UV inspection Contractor and Subcontractor
Facilities
E.5 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR 2015)
(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The form(s) shall be prepared and distributed as follows:
(1) Via mail and marked "Advance Copy", one copy each to the Contracting Officer, the
Contracting Officer's Representative (if designated in the contract), and to the cognizant
Administrative Contracting Officer, if any.
(2) Via mail, the original and 1 copy (unfolded) to the shipment address (delivery point) specified in Section F of this contract. Mark the exterior of the envelope "CONTAINS
DD FORM 250". This must arrive prior to the shipment.
(3) With shipment in waterproof envelope (one copy) for the consignee.
(4) If the shipment address is not directly to the Goddard Space Flight Center (Greenbelt) or GSFC/Wallops Flight Facility (Wallops) central receiving areas, then one copy of the
DD Form 250 must be provided (via mail) to one on the following addresses depending upon whether this contract is with GSFC Greenbelt or GSFC/WFF Wallops:
Receiving and Inspection (Code 279), Goddard Space Flight Center, Greenbelt, MD
20771.
Receiving and Inspection (Bldg. F16), Wallops Flight Facility, Wallops Island VA
23337.
(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement
1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.
(c) When more than one package is involved in a shipment, the Contractor shall list on the DD
Form 250, as additional information, the quantity of packages and the package numbers. The
Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words "CONTAINS DD FORM 250" on the package.
E.6 GSFC 52.246-93 ACCEPTANCE LOCATION(S) (APR 2008)
The Contracting Officer or authorized representative will accomplish acceptance at the
NASA/Goddard Space Flight Center.
Authorized:
Item Location Representative
1,2,3 NASA/GSFC Contracting Officer’s Representative (COR)
Code 597
Items NASA/GSFC Contracting Officer’s Representative (COR)
1,2,3 Code 597
The Contracting Officer reserves the right to designate other Government agents as authorized representatives. The Contractor will be notified by a written notice or by a copy of the delegation letter if other agents are authorized.
If this is a fixed price type contract, acceptance shall be deemed to have occurred constructively--for the sole purpose of computing an interest penalty that might be due the Contractor under the
Prompt Payment Act--on the 30th day after the Contractor has delivered the supplies or services in accordance with the terms and conditions of the contract. In the event that actual acceptance occurs within the constructive acceptance period, the determination of an interest penalty shall be based on the date of the actual acceptance.
E.7 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT NOT
REQUIRED (APR 1989)
NASA FAR Supplement clause 1852.246-72 of this contract requires the furnishing of a Material
Inspection and Receiving Report (MIRR) (DD Form 250 series) at the time of each delivery under this contract. However, a MIRR is not required for the following deliverable items:
paper/electronic deliverables (i.e. reports).
E.8 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.
E.9 CLAUSES INCORPORATED BY REFERENCE -SECTION E
Clause(s) E.1 - E.3 at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses
(END OF SECTION E)
SECTION F - DELIVERIES AND PERFORMANCE
F.1 52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
F.2 52.242-15 STOP-WORK ORDER (AUG 1989)
F.3 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
F.4 52.247-34 F.O.B. DESTINATION (JAN 1991)
F.5 1852.247-72 ADVANCE NOTICE OF SHIPMENT (OCT 1988)
Two (2) weeks prior to Pre-Ship Review (PSR), for any hardware deliverable item(s), the
Contractor shall furnish the anticipated shipment date, bill of lading number (if applicable), and carrier identity to Eric Cardiff/597 and to the Contracting Officer.
F.6 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING (FEB
2016)
Shipments of the items required under this contract shall be to:
Receiving Officer
Goddard Space Flight Center
Building 35, Code 279
Greenbelt, MD 20771
Marked for:
Technical Officer: Eric Cardiff, Code 597
Building: 11
Room: E135
Contract No.: TBD
Item(s) No.: TBD
Compliance with this clause is necessary to assure verification of delivery and acceptance and prompt payment.
If this is a fixed price type contract, delivery--for purposes of the Prompt Payment Act--must be through the above shipping address unless another location has been authorized by the
Contracting Officer. If delivery is made to other than the Receiving Officer listed above and shipment to that other location has not been authorized by the Contracting Officer, a delivery for the purposes of the Prompt Payment Act has not occurred and no interest penalty under the Act shall result. Shipment to other than Receiving Officer listed above will be construed as contract noncompliance.
F.7 CLAUSES INCORPORATED BY REFERENCE -SECTION F
Clause(s) F.1 - F.4 at the beginning of this Section are incorporated by reference, with the same require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding
(END OF SECTION F)
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
G.2 1852.227-70 NEW TECHNOLOGY – OTHER THAN A SMALL BUSINESS FIRM
OR NON-PROFIT ORGANIZATION (APR 2015)
G.3 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE
AND PATENT REPRESENTATIVE (APR 2015)
G.4 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
G.5 GSFC 52.232-95 INVOICES - SUBMISSION OF (AUG 2016)
Invoices shall be prepared in accordance with the Prompt Payment clause of this contract and submitted to the NASA Shared Services Center (NSSC), Financial Management Division (FMD)
– Accounts Payable, Bldg 1111, Jerry Hlass Road, Stennis Space Center, MS 39529, Email:
NSSC-AccountsPayable@nasa.gov. For purposes of the Prompt Payment Act, the above office is considered to be the "Designated Billing Office" and the "Designated Payment Office".
Note: Invoices must contain an invoice date in order for an invoice to be considered “Proper.”
Invoices without an invoice date will be deemed to be “Improper” and will be rejected by the
NSSC.
G.6 CLAUSES INCORPORATED BY REFERENCE -SECTION G
Clause(s) G.1 - G.4 at the beginning of this Section are incorporated by reference, with the same require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding
(END OF SECTION G)
mailto:NSSC-AccountsPayable@nasa.gov
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)
H.2 1852.225-70 EXPORT LICENSES (FEB 2000)
(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR Parts 120 through 130, and the Export Administration Regulations (EAR), 15 CFR Parts 730 through 799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.
(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at Goddard Space Flight Center where the foreign person will have access to export-controlled technical data or software.
(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.
(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.
H.3 1852.228-78 CROSS-WAIVER OF LIABILITY FOR SCIENCE OR SPACE
EXPLORATION ACTIVITIES UNRELATED TO THE INTERNATIONAL
SPACE STATION (OCT 2012)
H.4 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (TBD)
(a) Of the total price of items _*_ through _*_, the sum of $_*_ is presently available for payment and allotted to this contract. It is anticipated that from time to time additional funds will be allocated to the contract in accordance with the following schedule, until the total price of said items is allotted:
Schedule for Allotment of Funds
Date Amounts
TBD *
(b) The Contractor agrees to perform or have performed work on the items specified in paragraph (a) of this clause up to the point at which, if this contract is terminated pursuant to the
Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause would, in the exercise of reasonable judgment by the
Contractor, approximate the total amount at the time allotted to the contract. The Contractor is not obligated to continue performance of the work beyond that point. The Government is not obligated in any event to pay or reimburse the Contractor more than the amount from time to time allotted to the contract, anything to the contrary in the Termination for Convenience of the
Government clause notwithstanding.
(c) (1) It is contemplated that funds presently allotted to this contract will cover the work to be performed until _*_.
(2) If funds allotted are considered by the Contractor to be inadequate to cover the work to be performed until that date, or an agreed date substituted for it, the Contractor shall notify the
Contracting Officer in writing when within the next 60 days the work will reach a point at which, if the contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause will approximate 75 percent of the total amount then allotted to the contract.
(3) (i) The notice shall state the estimated date when the point referred to in paragraph (c)(2) of this clause will be reached and the estimated amount of additional funds required to continue performance to the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it.
(ii) The Contractor shall, 60 days in advance of the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, advise the Contracting Officer in writing as to the estimated amount of additional funds required for the timely performance of the contract for a further period as may be specified in the contract or otherwise agreed to by the parties.
(4) If, after the notification referred to in paragraph (c)(3)(ii) of this clause, additional funds are not allotted by the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, the Contracting Officer shall, upon the Contractor's written request, terminate this contract on that date or on the date set forth in the request, whichever is later, pursuant to the Termination for Convenience of the Government clause.
(d) When additional funds are allotted from time to time for continued performance of the work under this contract, the parties shall agree on the applicable period of contract performance to be covered by these funds. The provisions of paragraphs (b) and (c) of this clause shall apply to these additional allotted funds and the substituted date pertaining to them, and the contract shall be modified accordingly.
(e) If, solely by reason of the Government's failure to allot additional funds in amounts sufficient for the timely performance of this contract, the Contractor incurs additional costs or is delayed in the performance of the work under this contract, and if additional funds are allotted, an equitable adjustment shall be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the items to be delivered, or in the time of delivery, or both.
(f) The Government may at any time before termination, and, with the consent of the Contractor, after notice of termination, allot additional funds for this contract.
(g) The provisions of this clause with respect to termination shall in no way be deemed to limit the rights of the Government under the default clause of this contract. The provisions of this
Limitation of Funds clause are limited to the work on and allotment of funds for the items set forth in paragraph (a). This clause shall become inoperative upon the allotment of funds for the total price of said work except for rights and obligations then existing under this clause.
(h) Nothing in this clause shall affect the right of the Government to terminate this contract pursuant to the Termination for Convenience of the Government clause of this contract.
*Funds are currently committed for this award. Initial funds for this award will be obligated via the issuance of the first modification to this contract. Contract performance shall not begin until such time as these funds are obligated.
H.5 GSFC 52.211-100 CONTRACTOR PROPOSED ENHANCEMENTS (SEP 2013)
The Contractor shall provide the enhancements that are described in Attachment D. These enhancements, which are over and above the requirements required by the contract terms and conditions, Statement of Work and other contract attachments, were proposed by the Contractor in the proposal submitted in response to the Request for Proposal (RFP) 80GSFC18R0025 for
Pressurant Tank. The incorporation of these enhancements does not relieve the Contractor from the responsibilities of meeting all other contract terms and conditions and requirements in the
Statement of Work and other contract attachments. The Contractor shall perform these enhancements on all work performed, unless specifically waived by the Contracting Officer in writing.
H.6 GSFC 52.227-93 APPLICABILITY OF RIGHTS IN DATA – SPECIAL WORKS
(MAR 2008)
The "Rights in Data - Special Works" clause of this contract applies to the following aspects (or items):
Any data negotiated by the parties to be delivered with unlimited rights.
H.7 GSFC 52.227-99 RIGHTS IN DATA (JUN 2012)
The default Data Rights clause under this contract is FAR 52.227-14 RIGHTS IN DATA-
GENERAL—Alternate II and Alternate III as modified by NASA FAR Supplement 1852.227-14 and GSFC 52.227-90. Any exceptions to this clause will be covered by FAR 52.227-17
RIGHTS IN DATA--SPECIAL WORKS as modified by NASA FAR Supplement 1852.227-17, if applicable, and GSFC 52.227-93.
H.8 CLAUSES INCORPORATED BY REFERENCE -SECTION H
Clause(s) H.1 at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses
(END OF SECTION H)
SECTION I - CONTRACT CLAUSES
I.1 52.202-1 DEFINITIONS (NOV 2013)
I.2 52.203-3 GRATUITIES (APR 1984)
I.3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I.4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE
GOVERNMENT (SEP 2006)
I.5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
I.6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
I.7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER
ACTIVITY (MAY 2014)
I.8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (OCT 2010)
I. 9 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND
REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS. (APR
I.10 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
I.11 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER
CONTENT PAPER (MAY 2011)
I.12 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (OCT 2016)
I.13 52.204-12 UNIQUE ENTITY IDENTIFIER MAINTENANCE. (OCT 2016)
I.14 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
I.15 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE
MAINTENANCE (JUL 2016)
I.16 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR
PROPOSED FOR DEBARMENT (OCT 2015)
I.17 52.209-9 UPDATES OF PUBLICALLY AVAILABLE INFORMATION
REGARDING RESPONSIBLY MATTERS (JUL 2013)
I.18 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2015)
I.19 52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
I.20 52.215-2 AUDIT AND RECORDS - NEGOTIATION (OCT 2010)
I.21 52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT
1997)
I.22 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA—
MODIFICATIONS. (OCT 2010)
I.23 52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)
I.24 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS. (OCT 2010)
I.25 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES. (OCT 1997)
I.26 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND
DATA OTHER THAN CERTIFIED COST OR PRICING DATA—MODIFICATIONS.
(OCT 2010)
I.27 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE
SMALL BUSINESS CONCERNS (OCT 2014)
I.28 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
I.29 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)
I.30 52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND
REMEDIES (OCT 2016)
I.31 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND
EQUIPMENT EXCEEDING $15,000 (MAY 2014)
I.32 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
I.33 52.222-26 EQUAL OPPORTUNITY (SEP 2016)
I.34 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (DEC 2010)
I.35 52.222-50 COMBATING TRAFFICKING IN PERSONS. (MAR 2015)
I.36 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)
I.37 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
I.38 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT
MESSAGING WHILE DRIVING (AUG 2011)
I.39 52.225-1 BUY AMERICAN - SUPPLIES (MAY 2014)
I.40 52.225-8 DUTY-FREE ENTRY (OCT 2010)
I.41 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
I.42 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
I.43 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND
COPYRIGHT INFRINGEMENT (DEC 2007)
I.44 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014) AS MODIFIED BY
52.227-14 ALT II (DEC 2007) AND ALT III (DEC 2007)
I.45 52.227-17 RIGHTS IN DATA -- SPECIAL WORKS (DEC 2007) AS MODIFIED
BY 1852.227-17 (JUL 1997)
I.46 52.227-21 TECHNICAL DATA DECLARATION, REVISION, AND
WITHHOLDING OF PAYMENT-MAJOR SYSTEMS (MAY 2014)
I.47 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
I.48 52.232-1 PAYMENTS (APR 1984)
I.49 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
I.50 52.232-11 EXTRAS (APR 1984)
I.51 52.232-17 INTEREST (MAY 2014)
I.52 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
I.53 52.232-25 PROMPT PAYMENT (JAN 2017)
I.54 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR
AWARD MANAGEMENT (JUL 2013)
I.55 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE
I.56 52.233-1 DISPUTES (MAY 2014) – ALTERNATE I (DEC 1991)
I.57 52.233-3 PROTEST AFTER AWARD (AUG 1996)
I.58 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT
2004)
I.59 52.233-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
I.60 52.242-13 BANKRUPTCY (JUL 1995)
I.61 52.243-1 CHANGES - FIXED-PRICE (AUG 1987)
I.62 52.243-6 CHANGE ORDER ACCOUNTING. (APR 1984)
I.63 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2017)
I.64 52.246-24 LIMITATION OF LIABILITY - HIGH-VALUE ITEMS (FEB 1997)
I.65 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT
(FIXED-PRICE) (APR 2012)
I.66 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)
I.67 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
I.68 1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF
WHISTLEBLOWER RIGHTS (AUG 2014)
I.69 1852.215-84 OMBUDSMAN (NOV 2011)
I.70 1852.227-11 PATENT RIGHTS - - OWNERSHIP BY THE CONTRACTOR
(APRIL 2015)
I.71 1852.227-14 RIGHTS IN DATA- -GENERAL (APR 2015)
I.72 1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)
I.73 52.227-23 -- RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)
I.74 52.217-7 OPTION FOR INCREASED QUANTITY - SEPARATELY PRICED
LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within one month after contract award]. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
I.75 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM
REREPRESENTATION (JUL 2013)
I.76 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
(a) Definitions. As used in this clause—
“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,”
“disabled veteran,” “protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the
Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of
$150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The
Contractor shall act as specified by the Director, Office of Federal Contract Compliance
Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
I.77 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of
Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
I.78 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) clauses:
https://www.acquisition.gov/far/index.html
NASA FAR Supplement (NFS) clauses:
http://www.hq.nasa.gov/office/procurement/regs/nfstoc.htm
I.79 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR
Chapter 1) clause with an authorized deviation is indicated by the addition of
"(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any NASA FAR Supplement…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.