About this file

This document is a Justification for Other Than Full and Open Competition (JOFOC) prepared by NASA Glenn Research Center for a sole-source contract award to Aitech Defense Systems.

NASA seeks to procure Service Pack 0 (SP0) space-qualified, radiation-tolerant single-board computers for the Space Reactor-1 (SR-1) Freedom Nuclear Power Module flight avionics and software implementation. The estimated contract value is approximately $9.8 million, covering flight hardware procurement, three units for flight and qualification testing, and avionics ground testing equipment to be delivered to Idaho National Laboratory and Johnson Space Center. The required delivery date is Fall 2027 (approximately 12 months from the justification date) to support system-level testing near end-2027, with a critical end-2028 launch window. The sole-source justification is based on the statutory authority of 10 U.S.C. 3204(a)-1, emphasizing that existing NASA laboratories at Glenn Research Center and Johnson Space Center currently operate 37 SP0 units from prior Gateway/HALO programs. Switching to alternative suppliers would impose significant costs (approximately $12.5 million total including standing army costs and training labor), schedule delays exceeding eight weeks, and unacceptable technical risk due to the proprietary nature of SP0 designs and the absence of driver-to-driver interfaces for competing systems. A synopsis was posted on Sam.gov on July 30, 2026, closing August 14, 2026, with no competing companies submitting capabilities statements. The Contracting Officer has determined the anticipated cost to be fair and reasonable, contingent upon proposal evaluation prior to contract execution. NASA will continue examining the market for alternative solutions in future acquisitions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev.:4/2026

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Glenn Research Center

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

(JOFOC)

For Aitech Single Board Computers

1. Federal Acquisition Regulation (FAR) 6.104-1(a)(1) – Identification of the agency and the contracting activity, and specific identification of the document as a “Justification for other than full and open competition.”

This document is a justification for other than full and open competition prepared by National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC). The procuring agency is NASA, and the contracting activity is GRC.

2. FAR 6.104-1(a)(2) – The nature and/or description of the action being approved:

This justification provides the rationale for contracting by other than full and open competition to award a sole-source contract with Aitech Defense Systems for procurement of Service Pack 0 (SP0) space-qualified, radiation-tolerant single-board computers.

3. FAR 6.104-1(a)(3) – A description of the supplies or services required, to meet the Agency’s needs (including the estimated value):

NASA requires space-qualified, radiation-tolerant single-board SP0 computers to implement flight avionics and software for the Space Reactor-1 (SR-1) Freedom Nuclear Power Module (NPM). These SP0s are the on-board computers used for flight and within the testing labs.

They are designed specifically for aerospace applications.

SP0s currently reside within the existing ground test architecture at both GRC, within the avionics group, and JSC, within Software Test Labs. This existing hardware will be used to reduce risk in these areas prior to the delivery of new hardware from Aitech.

The relevant potential hardware has been identified to fit the project needs. The schedule to meet these needs requires delivery of flight hardware by Fall-2027 (~12 months), to support system level testing near the end-2027. The estimated cost for the hardware is approximately $9.8 million combined to support flight hardware procurement and avionics ground testing.

This includes three units that can be used for a combination of flight and qualification, test equipment to be sent to INL and JSC for integrated reactor testing and software testing.

Rev.: 4/2026

4. FAR 6.104-1(a)(4) – An identification of the statutory authority permitting other than full and open competition:

The statutory authority permitting other than full and open competition is 10 U.S.C. 3204(a)- 1, as implemented by FAR 6.103-1 Only one responsible source and no other supplies or services will satisfy agency requirements.

5. FAR 6.104-1(a)(5) – A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited:

The rationale supporting the use of 10 U.S.C. 3204(a)-1 is that existing NASA labs currently make use of a significant number of SP0 Aitech single-controller computers, and modifying or changing to different computers would result in significant programmatic and technical risk as described below.

Currently, SP0 single-controller computers are proprietary designs from Aitech. Moving away from SP0s would result in significant deferral of risk reduction, as well as the need to update the software labs to certify the SR-1 vehicle or development of driver-to-driver interfaces which currently do not exist and would require significant effort beyond the scope of the project. The procurement of hardware from different sources would prevent critical risk mitigation tasks, would require additional training, and further strain a schedule that is already tight and existing market research does not support.

SP0s previously developed and delivered as part of prior programs (Gateway/HALO) already exist in the Johnson Space Center (JSC) software labs. Currently, 37 SP0s are in inventory and planned for use to support SR-1 at JSC. Replacing this hardware would cost ~$2.5M and would require ~$400k in labor to train on the new hardware. Additionally, risk mitigation activities with existing hardware would be lost, and schedule risk would increase as personnel would have less experience troubleshooting issues with the new configuration (NASA has over 3 years of experience with the existing SP0s). GRC also retains three total SP0s, including an –100 and two –200, which would cost approximately $200k to replace with an alternative.

Replacement of the lab units with computers from other suppliers would result in significant cost and schedule impacts beyond those noted above (~$2.5M and over 8 weeks of training), due to the time necessary to conduct a competitive procurement, along with significant technical risk related to the inability to execute tests while awaiting delivery of hardware.

Alternatively, development of driver-to-driver interfaces to allow for procurement from a different supplier would also result in additional significant programmatic impacts and technical risk (newly developed interface that would need to be fully integrated and tested), as such capability does not currently exist for SP0s. Alternate suppliers for ground use only would result in critical test-like-you-fly exceptions, the inability to sufficiently certify the vehicle, still require the lengthy development of new driver-to-driver interfaces, and ultimately doesn’t mitigate the programmatic and technical risks noted above.

The identified SP0s are compatible with existing hardware and can meet the project needs.

The hardware is needed to be delivered by Fall 2027. The schedule risk along with the cost and technical risk make procurement from other suppliers not feasible for the program schedule. Slipping the program schedule would result in a missed launch window, requiring a two-year standing army cost in order for the project to maintain the spacecraft to hit the following launch window which would result in a cost greater than $10M based on standing army costs.

Given the above identified costs associated with replacing existing hardware and training labor on the new hardware, it would cost the Government an additional ~$12.5M to procure these SP0 equivalent computers from another source, based on the standing army cost (~$10M) and training for the new hardware (~$2.5M). Since this total procurement is only estimated at $9.8M, the additional costs would never be recouped through open competition.

6. FAR 6.104-1(a)(6) – A description of the efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by Subpart 5.1 and, if not, which exception under 5.101 applies:

A notice to the Government Point of Entry (GPE) website (Sam.gov) was published on July 30, 2026, in accordance with FAR Subpart 5.1. This posting informed potential sources of NASA’s intent to award this sole-source contract to Aitech. The results of this synopsis are summarized in Section 10 below.

7. FAR 6.104-1(a)(7) – A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable:

The Contracting Officer’s signature on this document indicates that the Contracting Officer has determined that the anticipated cost to the government will be fair and reasonable. The Contractor must be required to submit a proposal to be evaluated and negotiated by the Government. Prior to execution of the contractual instrument, a proposal analysis will be performed. The proposal analysis will ensure that the final agreed-to price for the contract action is fair and reasonable. Quotes were received from Aitech for the hardware needed.

These were compared to previous procurements from Aitech that were delivered under similar NASA Programs (Gateway/HALO) as well as quotes from other suppliers for replacement parts.

Quotes from ~12 months ago and 3 months ago were compared to recent quotes to ensure costs at Aitech were consistent over time. Based on inflation of Electrical, Electronic, Electromechanical, and Electro-Optical (EEEE) parts over the past year, comparisons to previous quotes are within expectation.

8. FAR 6.104-1(a)(8) – Description of the market research conducted, and the results, or a statement of the reasons market research was not conducted (e.g., urgent, and compelling requirement):

An initial trade study looking at industry capability to supply Avionics for SR-1 was completed. This study looked at a wide variety of potential suppliers that would meet the schedule and technical capabilities needed for the defined mission. The team noted that all suppliers would be stressed in terms of schedule, cost, size, weight, and power considerations, as well as the unique environment of the mission, which limits off-the shelf solutions. While the landscape of the trade identified some bottoms-up solutions that may be appropriate for future missions, no alternative option could sufficiently reduce technical risk, programmatic risk, or impact compared to the existing Aitech option.

9. FAR 6.104-1(a)(9) – Any other facts supporting the use of other than full and open competition:

While it is viewed that only a single responsible source can meet the SR-1 project needs, it should also be noted that schedule remains a critical item. SR-1 was kicked off in early 2026.

Flight computers themselves take at least 8-12 months to produce, test, and deliver, regardless of supplier. The team has urgently traded NPM avionics architecture and needs to ensure that the proper hardware is being requested. By working to procure SP0s now, the program meets need dates to support an end-2028 launch date with minimal margin. In the event the launch window at the end of 2028 is missed, the next available launch window for SR-1 for a Mars mission would be 2030.

10. FAR 6.104-1(a)(10) – A listing of the sources, if any, that expressed an interest in writing in the acquisition:

A notice of NASA’s intent to award this sole-source action was synopsized on the GPE website (Sam.gov) per FAR Subpart 5.2 (See Section 6 above). The synopsis was posted on July 30, 2026, and closed on August 14, 2026. No companies provided capabilities statements in response to the posting.

11. FAR 6.104-1(a)(11) – A statement of actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required:

The Agency will continue to examine the market in the future for alternative solutions or new sources before executing any subsequent acquisitions for the same requirements.