This document is a Justification for Other Than Full and Open Competition (JOFOC) prepared by NASA's Glenn Research Center for sole-source contract 80GRC026C0011 with American Honda Motor Co., Inc. (AHM).

NASA seeks to procure three fuel cell stacks for developmental space fuel cell hardware baseline characterization testing to support the Research Technology Mission Directorate's LIVE domain flight technology demonstration activities. The requirement encompasses: (1) procurement of three fuel cell power conversion devices within six months of contract signature, rated to convert propellant-grade hydrogen and oxygen gases into at least 2 kW peak direct current electrical power for laboratory and space environments; (2) a 14-week lease of ground support equipment (GSE) to enable safe operation of fuel cell test articles; (3) engineering support for GSE installation at the NASA test facility, including documentation and virtual support for NASA safety permitting processes; and (4) documentation and training for safe operation of the electrochemical devices and GSE. The anticipated cost is redacted from this version. NASA justifies the sole-source award based on unusual and compelling urgency under 10 U.S.C. 3204(a)(2), citing the critical timeline for the Artemis campaign to return humans to the lunar surface by 2028 before international competitors, particularly China. The justification emphasizes national security interests and the cascading effects delays would have on interconnected NASA programs including the Space Launch System, Orion, EVA suits, and the Human Landing System. Market research identified only three qualified fuel cell vendors capable of H₂/O₂ space applications (Giner, Infinity Fuel Cell and Hydrogen, and Teledyne Energy Systems), with AHM representing a potential fourth source to increase supply chain capacity. No advance public notice was issued due to the unusual and compelling urgency exception under FAR 5.101(b)(1).

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Glenn Research Center (GRC)

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

(JOFOC)

UNUSUAL AND COMPELLING URGENCY

For 80GRC026C0011

1. Federal Acquisition Regulation (FAR) 6.104-1(a)(1) – Identification of the agency and the contracting activity, and specific identification of the document as a “Justification for other than full and open competition.”

This document is a justification for other than full and open competition prepared by National Aeronautics and Space Administration (NASA).

The procuring agency is NASA, and the contracting activity is Glenn Research Center.

2. FAR 6.104-1(a)(2) – The nature and/or description of the action being approved:

This justification provides the rationale for contracting by other than full and open competition to award a sole-source contract 80GRC026C0011 with American Honda Motor Co., Inc. (AHM) for the purchase of three-(3) fuel cell stacks.

The general purpose of this contract is to procure developmental space fuel cell hardware for baseline characterization testing to inform Research Technology Mission Directorate (RTMD) LIVE domain flight technology demonstration activities. This requirement is critical to NASA’s Artemis campaign and its overall mission to safely land humans on the lunar surface.

The Artemis campaign’s timeline, and its included mission dates, are a vital component of the government’s need. For reasons discussed below, delays to mission execution as a result of developmental challenges are likely to result in mission failure. This contract is necessary to ensure that development of a lunar landing capability is complete in time to support NASA’s Artemis missions.

a. The Artemis Campaign and National Strategic Interests.

The Artemis campaign consists of several interconnected NASA programs, encompassing multiple contracts and international efforts. Each component of the campaign is required to reach the agency’s end state of landing humans on the lunar surface. Among these programs are: the Space Launch System (SLS), NASA’s primary space launch capability; Orion, NASA’s solution for transport of crew from low-earth orbit to cis-lunar orbit; Extra- Vehicular Activity (EVA) suits and the Human Landing System (HLS). Each of the programs depends upon the timely development and success of the others to perform its role, and delays within one program have a cascading effect upon the others.

NASA’s Artemis campaign explores the Moon for scientific discovery, technology advancement, and to learn how to live and work on another world in order to prepare for human missions to Mars. The Artemis campaign collaborates with commercial and international partners and establishes the first long-term presence on the Moon. These efforts support several vital national strategic interests including national security, solidifying the United States’ leadership and influence in space, supporting scientific and technological development, and supporting space commercial development.

To support these interests and ensure continued American superiority in space exploration, it is critical that the United States return to the lunar surface before its global competitors. By completing a lunar landing mission in advance of our global competitors, the United States can shape rules, policy, priorities, and the overall geopolitical landscape of future space exploration. This will provide the United States with the initiative needed to best advance related national interests and maintain its role as the global leader in space exploration.

Falling behind our global competitors in this effort cedes this initiative, and our nation’s leadership in space exploration, to our global competitors. This will result in unacceptable impacts to the United States’ geopolitical position and its national security.

Currently, China is actively developing a human crewed Moon landing mission. China has recently experienced significant success in development of space exploration technologies, including launch and landing of the country’s first reusable orbital rocket in 2025. China’s significant space technology progress has established the country as a near-peer competitor to the United States for space exploration. China’s recent progress also includes significant developments in the country’s crewed lunar program, including successful liftoff and landing tests of a crewed lander. These developments place China on target to meet their current goal of landing two astronauts on the lunar surface before 2030.

It is critical to the national interests of the United States, and therefore to NASA’s mission, that the Artemis program return American astronauts to the Moon before China reaches this milestone and seizes the initiative and global leadership role in human space exploration.

NASA plans to launch its first mission to return humans to the Moon (currently titled “Artemis IV”) by 2028. This launch schedule is critical to NASA’s mission and the national interests it supports.

b. Program Background (Artemis | Moon Base | Power Generation)

The Research Technology Mission Directorate (RTMD) has been tasked by Human Spaceflight Mission Directorate (HSMD) to deliver Power and Energy Storage solutions to enable persistent lunar activities by humans. Existing technologies do not meet the minimum Power and Energy Storage requirements within operational constraints. The fuel cell technology that converts potential chemical energy into electrical power met Power and Energy Storage requirements for Gemini, Apollo, and Space Shuttle missions, but were discontinued concurrently with the Space Shuttle program. RTMD is working to re-establish a fuel cell supply chain to meet these Power and Energy Storage requirements for crewed space vehicles. This specific procurement is part of a dissimilar risk reduction effort to fund hardware development through multiple potential vendors.

Terrestrial fuel cell devices are designed to operate in near-ambient environments (~ 14.7 psia) with oxygen from the air (~20% O2) rather than space vacuum environments (< 0.001 psia) or utilize pure oxygen (>99% O2). Attempting to utilize terrestrial fuel cell devices for space applications without significant fundamental modifications presents hazards to crew, hardware, and test facilities. As MoonBase accelerates the pace of lunar development, any new vendors need to provide hardware to NASA within 9 months for assessment to meet mission schedules.

3. FAR 6.104-1(a)(3) – A description of the supplies or services required, to meet the Agency’s needs (including the estimated value):

The primary objective of this acquisition is to expand the currently limited fuel cell supply chain by introducing an additional vendor and to foster advancements in the latest fuel cell design. This acquisition encompasses the following specific details:

a. This procurement acquires three-(3) fuel cell devices for conducting a benchmark test campaign which will quantitively identify performance gaps between the existing developmental space fuel cell designs and anticipated hardware operation during spaceflight.

The test campaign consists of baseline performance test, an environmental exposure test (e.g.

vacuum, shock, vibration, etc.), followed by another performance test to determine any hardware deviation resulting from exposure to that specific space environment. This data will be compared internally against other fuel cell vendors which have delivered air-independent fuel cell hardware to US Agencies meeting a Technology Readiness Level (TRL) of at least 4 (See Section #5). To complete this technical assessment, this procurement will:

1) Procure within six-(6) months of the signed contract three-(3) fuel cell power conversion devices rated to convert propellant-grade Hydrogen (MIL-PRF-27201F, Type 1, < 1 ppm Sulfur-containing compounds) and Oxygen (MIL-PRF-25508J, Type I, Grade F) gases into at least 2 kW peak direct current (DC) electrical power when in laboratory and / or space environments.

2) Lease, for a period of 14 weeks, ground support equipment (Ground Support Equipment) to enable safely operating fuel cell test articles within design specifications to conduct performance testing as part of NASA Environmental Benchmark Testing until NASA supporting test hardware completes the necessary design/fabrication/verification processes.

3) Engineering support to safely and properly install the GSE in the NASA test facility, including documentation and virtual support necessary to complete internal NASA Safety Permitting processes and Reviews to complete all testing within the 14-week lease period identified in 2).

4) Documentation and training necessary to safety and properly operate the electrochemical devices provided in 1) and the GSE provided in 2).

b. The anticipated cost for this action is expected to be .

4. FAR 6.104-1(a)(4) – An identification of the statutory authority permitting other than full and open competition:

The statutory authority permitting other than full and open competition is 10 U.S.C.

3204(a)(2), as implemented by FAR 6.103-2, Unusual and compelling urgency.

5. FAR 6.104-1(a)(5) – A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited:

The rationale supporting the use of 10 U.S.C. 3204(a)(2) is as described below.

The agency’s need for space-rated fuel cells is of such an unusual and compelling urgency that the Government would be seriously injured, both financially and in terms of significant negative impact to the national interests discussed herein, if it is not permitted to limit the number of sources from which it solicits proposals.

In order to return to the lunar surface before our global competitors and advance the United States’ national interests in space exploration and leadership, NASA must return American astronauts to the surface of the Moon as quickly as technological development will safely allow. Current Artemis mission timelines require a lunar landing mission by 2028, with capability demonstration mission milestones planned for Fiscal Year 2027.

Though this mission timeline places NASA close to the developmental timelines and mission goals of our global competitors, this timeline ensures that the Agency is able to support the country’s space policy objectives and related national interests. Further delay to this timeline would place the United States unacceptably close to ceding its leadership in space exploration to our global competitors – significantly harming the national interests of the United States, including national security, scientific advancement, technological maturation and superiority, and other critical Government priorities.

Allowing full and open competition would result in unacceptable delays and potential lapses in mission-critical support for lunar surface operations during the lunar night being realized.

Due to the cutting-edge nature of the technology required for this capability, every day in the developmental timeline is vital for ensuring that a lunar landing capability is completed in time for NASA’s established mission dates. Each day added to this timeline – including the significant time that would be required for a full and open competition – places the United States closer to ceding its space exploration leadership to our global competitors.

6. FAR 6.104-1(a)(6) – A description of the efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by Subpart 5.1 and, if not, which exception under 5.101 applies:

The contracting officer has determined in accordance with FAR 5.101(b)(1) that this action is exempt from the notice required in FAR 5.101, because unusual and compelling urgency precludes competition to the maximum extent practicable and the Government would be seriously injured if the agency complies with the publicizing and response time periods specified in FAR 5.101(d).

7. FAR 6.104-1(a)(7) – A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable:

The contracting officer’s signature on this document indicates that the Contracting Officer has determined that the anticipated cost to the government will be fair and reasonable. The Contractor must be required to submit a proposal to be evaluated and negotiated by the Government. Prior to execution of the contractual instrument, a proposal analysis will be performed. The proposal analysis will ensure that the final agreed-to price for the contract action is fair and reasonable.

8. FAR 6.104-1(a)(8) – Description of the market research conducted, and the results, or a statement of the reasons market research was not conducted (e.g., urgent, and compelling requirement):

Based on the unusual and compelling urgency of NASA’s requirement and the authority of FAR 6.103-2(b), additional market research was not conducted. Since the Space Shuttle program ended NASA’s access to space qualified fuel cells in 2013, NASA actively searches for and works with vendors to re-establish a supply chain for qualified fuel cells to use in crewed spacecraft. Working in conjunction with the Department of Defense, the success rate for adapting air-breathing fuel cell designs for H2/O2 space applications is down to three vendors: Giner (https://www.ginerinc.com/), Infinity Fuel Cell and Hydrogen (IFCH, https://infinityfuel.com/), and Teledyne Energy Systems (TESI, https://www.teledynees.com/en-us)). Other vendors were either unsuccessful, closed, or left the industry due to a poor business case. Multiple inquiries through NASA Procurement, the Department of Commerce and Trade, Office of Naval Research, and the Department of Energy were unable to find other fuel cell vendors interested in providing space fuel cell hardware unless NASA guaranteed annual hardware procurements far greater than NASA budgets could support (there is no credible universe where NASA will purchase >1,000 stacks per year for 5 years starting in 2027). This procurement enables NASA to increase the potential supply chain by ~33% to four-(4) vendors. Through the use of previous competitive activities, including the already established market research, and consultation with knowledgeable individuals in Government relative to aerospace activities, the contracting officer has determined American Honda Motor Co., Inc. is the only source capable of performing this requirement in the required timeframe.

9. FAR 6.104-1(a)(9) – Any other facts supporting the use of other than full and open competition:

This action aligns with the Executive Order 14369, Ensuring American Space Superiority, directive to return humans to the lunar surface no later than 2028. It also supports national priorities to ensure American leadership in space exploration by returning humans to the lunar surface before our international competitors.

10. FAR 6.104-1(a)(10) – A listing of the sources, if any, that expressed an interest in writing in the acquisition:

Based on the unusual and compelling urgency of NASA’s requirement and the resulting use of NASA’s authority under 10 U.S.C. 3204(a)(2), the Agency did not conduct public Requests for Information and thus received no responses. NASA also did not receive any unsolicited proposals to support a different approach to the Agency’s requirements.

11. FAR 6.104-1(a)(11) – A statement of actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required:

NASA’s future approach to acquisitions related to human space exploration is intended to establish a robust, competitive space economy. NASA has engaged in a parallel developmental contract structure in part to ensure completion of future Artemis missions and to support a sustained contractor base for future competitive lunar transportation requirements.

The Agency will continue to examine the market in the future for alternative solutions or new sources before executing any subsequent acquisitions for the same requirements.