TFOME III Industry Day Slides_Final.pdf
PDF 15 MB Posted
- Attached to
- Presolicitation Synopsis - Test Facility Operations, Maintenance, and Engineering III (TFOME III)
- Solicitation number
- 80GRC024R0001_Presolicitation_Synopsis
About this file
This document is a Presolicitation Synopsis for the Test Facility Operations, Maintenance, and Engineering III (TFOME III) contract opportunity.
The National Aeronautics and Space Administration (NASA) Glenn Research Center plans to issue a Request for Proposal (RFP) for TFOME III, which will acquire engineering and technician support, manufacturing and development support, and operations, maintenance, inspection, and certification support services needed to conduct aeronautics and space-related testing in GRC test facilities and laboratories. This is a competitive 8(a) small business set-aside with a NAICS code of 561210 - Facilities Support Services and a size standard of $47,000,000. The anticipated RFP release date is on or about August 22, 2024, with an offer due date of on or about October 7, 2024. All responsible sources may submit an offer, which will be considered by the agency. The Center Ombudsman for this acquisition is listed on the NASA website.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Important Information Emergency Dispatch: Dial 911 from in-house phone or 216-433-8888
Medical Services: 216-433-5841
• Emergency Egress exit doors are located along the left side and back of the room.
• Restrooms are located out the back doors and to the left down the hallway.
• Photographs or recording Industry Day of the presentations and tour locations is prohibited.
• The Industry Day presentation and the list of attending organizations will be posted to SAM.gov after the event.
Please Note the Following:
All Statement of Work (SOW) information provided during Industry Day is based on the draft Request For
Proposal (DRFP) as posted to SAM.gov on May 31, 2024.
In the event of any discrepancy between information you hear today or during your One-on-One meeting and information in the Final Request for Proposal (RFP), the
Final RFP is the controlling document.
About Glenn Research Center
Aircraft Propulsion
Communications Technology Materials & Structures for Extreme
Environments
Power, Energy Storage & Conversion
Physical Sciences & Biomedical Tech
In-Space Propulsion & Cryogenics
GRC Lewis Field Test Facilities
Materials Research
• Research & Develop for Structures and
Materials
Fuel Cell Testing
• Hydrogen & Oxygen fuel cells
• Continuous, long-duration testing
Extreme Environments
• Atmospheric condition simulation
• Spacecraft instrumentation
• Planetary environments
Reduced Gravity
• Combustion Science
• Fluid Physics
Space Simulation
• Advanced Electric Propulsion
• Space Power Generation, Conversion and Storage
• Space Communications
Cryogenic Fluid Management
• Cryogenic Insulation
• Cryogenic Propellant Systems
• Low-Gravity Cryogenic Gauging
Mission Suitability Within the Mission Suitability Factor, the maximum numerical score each Subfactor may receive is shown.
The Total Compensation Plan will also be reviewed as part of the Mission Suitability Volume.
Draft Mission Suitability Subfactors Points
MS.1 Management Plan 400
Organizational Structure and Management Approach
Key Positions/Personnel
Staffing Management/Skill Mix
Phase-In Plan
MS.2 Technical Plan 400
Technical Approach
Safety, Health, and Environmental Plan
Sample Tasks
MS.3 Procurements 200
Total 1,000
CLIN Labor Cost Template
Indirect Rate Template
Offer must provide three years of prior indirect pool, base and rate information.
GRC Maintenance (Both LF & ATF) GRC utilizes a Reliability Centered Maintenance (RCM) management approach. This approach is a data driven philosophy which requires continuous improvement and evaluation of current and future requirements.
Preventative and Corrective Maintenance services include:
Scheduled (Planned)
• Preventative Maintenance (PM)
• Programmed Maintenance (PGM)
• Predictive Testing & Inspection (PT&I)
• Service Request (SR)
• Replacement of Obsolete Items (ROI)
• Calibration services
• Planned Repairs
Unscheduled (Unplanned)
• Trouble Calls
• Unplanned Repairs
This contract supports the implementation of GRC’s Maintenance Program which:
• Complies with current NASA Facilities Maintenance and Operations Management policies.
• Implements NASA’s Reliability Centered Maintenance (RCM) philosophy in accordance with required policies.
• Implements and expands upon NASA’s Conditioned Based Maintenance (CBM) philosophy.
• Ensures that testing schedules are executed on time and for the duration required.
• Ensures that GRC’s maintenance reporting requirements are met (including responses to frequent NASA Headquarters data calls)
Work Breakdown Structure (WBS)
The contract is broken into functional work groups referred to as WBS elements. There are 25 unique WBS elements that collectively describe the work requirements of the following areas:
Management & Administration Lewis Field Test Operations Armstrong Test Facility Operations Armstrong Test Facility Institutional Lifting Devices Data, IT, & Measurement Systems Reliability Centered Maintenance
NASA Office of Small Business Programs (OSBP)
Overview Small Businesses are the backbone of the American economy and play a very critical role in propelling our nation forward into a new space age. Hundreds of small businesses have contributed to some of NASA’s most premier space exploration missions, from the Space Launch System (SLS) to the James Webb Space Telescope. Small Businesses not only support science and technology tasks across a wide range of disciplines, but many also provide critical program management functions that keep our projects within budget and on schedule.
NASA’s Office of Small Business Programs primary mission since its inception has been to increase the representation of small businesses in NASA’s contracting efforts. Our efforts encompass all federally recognized socio-economic small business categories and we work hard to make sure each type of business gets a fair chance to work with NASA.
NASA Implementation of Recent DEIA EOs:
EO 13985 on Advancing Racial Equity and Support for Underserved Communities Through the Federal Government
• NASA Request for Information (RFI) and Public Meeting
On June 15, 2021, NASA issued an RFI, seeking public input on advancing equity and support for under-represented and underserved communities in NASA programs, contracts and grants.
On July 13, 2021, NASA hosted a public meeting to discuss the RFI and further engage the public for input on implementing EO 13985.
Public input from the RFI and meeting are currently being reviewed to inform the development of the upcoming new NASA Equity Plan.
Additionally, NASA recently used a crowdsourcing tool – NASA@Work – to solicit ideas and input from the NASA workforce.
President’s DEIA Priorities – NASA Implementation
An ostensible subcontractor is a subcontractor that:
• Performs primary and vital requirements of a contract, or of an order under a multiple award schedule contract.
• A subcontractor upon which the prime contractor is unusually reliant.
Ostensible Subcontractor Rule
If the Offeror proposes using subcontractors, the Offeror shall consider the following for compliance with the Small Business Administration’s (SBA) Ostensible Subcontractor Rule (reference 13 CFR 121.103):
1. Who will manage the contract?
2. Which party possesses background and expertise necessary for contract performance?
3. Which party pursued the contract?
4. The degree of collaboration in preparation and submission of this Quote.
5. Whether there are discrete tasks to be performed by each subcontractor(s), or whether there is instead a co-mingling of personnel and resources.
Ostensible Subcontractor Rule - Things to Consider
6. Which party will perform the more complex and costly contract functions?
7. The relative amount of proposed work (annual dollar value) to be performed by each subcontractor(s).
8. The business size (number of employees and annual revenue) of each subcontractor(s).
9. Is the proposed subcontractor(s) ineligible to submit a quote because it does not meet the solicitation size standard requirements?
10. Did the prime include subcontractor personnel in the proposed organizational structure, and did the prime propose the managerial staff of the incumbent in their quotes (all or some)?
The SBA has the authority to make a final decision on compliance with the Ostensible Subcontractor Rule; therefore, compliance with the rule will not be evaluated by NASA
GRC.
Ostensible Subcontractor Rule - Things to Consider
Regulations Pertaining to 8(a) Small Business Set-Asides
• FAR 6.204 - Set-asides for 8(a) Small Business Concerns
• FAR Subpart 19.8 - 8(a) Small Business Procurement Program
• 13 CFR Part 124 - 8(a) Business Development/Small Disadvantaged Business Status Determinations
8(a) Small Business Procurement Program
• Determining eligibility for the 8(a) Program. FAR Subpart 19.802 oDetermining the eligibility of a small business to be a participant in the 8(a) program is the responsibility of the SBA. SBA’s regulations on eligibility requirements for participation in the 8(a) program are found at 13 CFR 124.101 through 124.112.
• Selecting acquisitions for the 8(a) program. FAR Subpart 19.803 oThe SBA and an agency match the agency’s requirements with the capabilities of 8(a) participants to establish a basis for the agency to contract with the SBA under the program.
oTFOME III is an 8(a) Set-Aside
8(a) Joint Ventures
8(a) Joint Ventures, 13 CFR 124.513
• 8(a) firm designated as managing venturer and employee of 8(a) is project manager responsible for performance of contract.
• Joint venture is project specific.
• JV must be approved by servicing SBA district office prior to award of 8(a) contract.
• JV provides quarterly financial statements to SBA.
8(a) Joint Ventures
8(a) performance of work:
• As the contractor, the JV entity must perform the percentage of work required by FAR 52.219-14 Limitations on Subcontracting.
• The 8(a) partner to the JV must perform at least 40% of the work performed by the JV (includes all work done by non-8(a) partner and any of its affiliates at any subcontracting tier).
PAST PERFORMANCE
New SBA Rule Enhances Past Performance Opportunities for Small Businesses
• On August 22, 2022, the U.S. Small Business Administration (SBA) will implement a final rule that provides two new methods by which small businesses can obtain past performance credit when competing for federal prime contracts. First, the rule allows certain small business offerors to rely on the past performance of joint ventures (JV) in which they were a member. Second, the rule establishes a process by which certain small businesses can request, obtain, and rely upon past performance obtained when performing as a first-tier subcontractor. This rule greatly expands the ability of small businesses to establish a record of meaningful and relevant past performance.
NASA Mentor Protégé Program
The NASA MPP encourages NASA prime contractors to assist eligible Protégés, thereby enhancing the Protégés’ capabilities to perform on NASA contracts and subcontracts, fostering the establishment of long-term business relationships between these entities and NASA prime contractors, and increasing the overall number of these entities that receive NASA contract and subcontract awards.
Benefits of Participation
For Mentors
• Develop long-term business relationships with small business concerns.
• Develop a qualified small business subcontracting base.
• Accrue credit toward small business subcontracting goals.
For Protégés
• Receive relevant technical and developmental assistance.
• Qualify for sole-source contracts from Mentors.
Website: https://www.nasa.gov/osbp/mentor-protege-program
Moratorium as of February 14, 2024
In the event of any discrepancy between information you hear today or during your One-on- One meeting and information in the Final Request for Proposal (RFP), the Final RFP is the controlling document.
Important Information Emergency Dispatch: Dial 911 from in-house phone or 419-621-3222
Medical Services: 419-621-3222
• Emergency Egress exit doors are located along the side and back of the room.
• Restrooms are located out the back doors and to the left down the hallway.
• Photographs or recording Industry Day of the presentations and tour locations is prohibited.
• The Industry Day presentation and the list of attending organizations will be posted to SAM.gov after the event.
Please return visitor badges to security when leaving Armstrong Test Facility.
All Statement of Work (SOW) information provided during Industry Day is based on the draft Request For
Proposal (DRFP) as posted to SAM.gov on May 31, 2024.
In the event of any discrepancy between information you hear today or during your One-on-One meeting and information in the Final Request for Proposal (RFP), the Final RFP is the controlling document.
GRC-ATF Organizational Structure
Neil A. Armstrong Test Facility (H)
Space Environments Test Division
(HE)
Propulsion Test Division
(HP)
GRC
Center Director
In the event of any discrepancy between information you hear today or during your One-on- One meeting and information in the Final Request for Proposal (RFP), the Final RFP is the controlling document.
Acronyms ACF - Aerospace Communications Facility
ATF – Armstrong Test Facility
BMS – Business Management System
CAOT - Cognizant Audit Office Template
CBA - Collective Bargaining Agreement
CBM - Conditioned Based Maintenance
CDRL - Contract Data Requirements List
CFR - Code of Federal Regulations
CLIN - Contract Line-Item Number
CMM - Coordinate Measuring Machine
CNC - Computer Numerical Control
CPFF - Cost Plus Fixed Fee
DEIA - Diversity, Equity, Inclusion, and Accessibility
DOLWD - Department of Labor and Workforce Development
DRFP – Draft Request for Proposal
EDM – Electronic Discharge Machining
EO – Equal Opportunity
EPPL - Electric Propulsion and Power Laboratory
EPRB - Electric Propulsion Research Building
ERB – Engine Research Building
FAR – Federal Acquisition Regulation
FDM - Fused Deposition Modeling
FFP - Firm Fixed-Price
GEER - Glenn Extreme Environments Chamber
GRC – Glenn Research Center
GSA – Government Services Administration
IDIQ - Indefinite Delivery Indefinite Quantity
IRT – Icing Research Tunnel
IT – Information Technology
ITSMP - Information Technology Security Management Plan
JV – Joint Venture
LF – Lewis Field
MPP - Mentor Protégé Program
NACA - National Advisory Committee for Aeronautics
Acronyms NAICS - North American Industry Classification System
NAMS - NASA Access Management
NVDB - NASA Venture Database
ODC – Other Direct Costs
OSBP - Office of Small Business Programs
OSI –Office of Strategic Infrastructure
PGM - Programmed Maintenance
PIV - Personal Identity Verification
PM - Preventative Maintenance
PPD - Past Performance Database
PPN - Past Performance Narrative
PPQ - Past Performance Questionnaires
PSL - Propulsion Systems Laboratory
PT&I - Predictive Testing & Inspection
PWS - Performance Work Statement
R&D – Research and Development
RCM - Reliability Centered Maintenance
RFI - Request for Information
RFP – Request for Proposal
ROI - Replacement of Obsolete Items
SBA - Small Business Administration
SHIIVER - Structural Heat Intercept, Insulation, and Vibration Evaluation Rig
SLS - Space Launch System
SOW - Statement of Work
SR - Service Request
SSA - Source Selection Authority
STOVL - Short Take-Off and Vertical Landing
SWT – Supersonic Wind Tunnel
TFOME - Test Facility Operations, Maintenance, and Engineering
UEI - Unique Entity ID
WYE – Work Year Equivalent
WT – Wind Tunnel
Zero G – Zero Gravity